Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
L-07-001, Clarification of Information Provided in Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients21 October 2011Nine Mile Point
Constellation
George Gellrich
EDF Development
Clarification of Information Provided in Response to NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant TransientsOther
ML0730400096 November 2007Pickett D
NRC/NRR/ADRO/DORL/LPLI-1
Constellation 90-Day Response to Generic Letter 2007-01 - Request for Additional InformationRAI
ML07348003112 December 2007Constellation
Heffley J
Constellation 90-Day Response to Generic Letter 2007-01 - Request for Additional InformationRequest
ML08291023323 October 2008Mark Kowal
Plant Licensing Branch I
Closeout of Generic Letter 2007-01 Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.Other