Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
3F0698-19, Provides NRC W/Necessary Info in Support of Commitment Provided in Ltr Re non-restart follow-up Items & Plan & Schedule for Large Bore Piping Project30 June 1998Duke Energy
Baumstark J
Provides NRC W/Necessary Info in Support of Commitment Provided in Ltr Re non-restart follow-up Items & Plan & Schedule for Large Bore Piping ProjectOther
3F1297-36, Provides Response to NRC RAI on 971202 Re Large Bore Piping & Pipe Support Calculations.Assessment Entitled, Generic Operability Evaluation for Large Bore Safety Related Piping at Crystal River-3, Encl18 December 1997Duke Energy
Rencheck M
Provides Response to NRC RAI on 971202 Re Large Bore Piping & Pipe Support Calculations.Assessment Entitled, Generic Operability Evaluation for Large Bore Safety Related Piping at Crystal River-3, EnclResponse to RAI
ML20199D48118 November 1997Duke Energy
Rencheck M
Forwards Listed Info at Request of NRC to Supplement Info Provided in Re Large Bore safety-related Piping CalculationsSupplement
ML20202H9682 December 1997NRC (Affiliation Not Assigned)
Raghavan L
Forwards Request for Addl Info Relating to Large Bore Piping & Pipe Support CalculationsRAI