Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
3F0198-34, Forwards Summary of Evaluation of Dynamic Effects of Pressurizer Surge Line LOCA Other Systems & Components,In Response to NRC 971222 Rai.Commitments Made by Util,Encl | 23 January 1998 | Duke Energy Rencheck M | Forwards Summary of Evaluation of Dynamic Effects of Pressurizer Surge Line LOCA Other Systems & Components,In Response to NRC 971222 Rai.Commitments Made by Util,Encl | Other |
3F0298-17, Forwards List of Commitments,Conclusions Presented in 980130 Telcon,Description of long-term CAs Required to Resolve Conflicts within FSAR & Summary of Previously Docketed Correspondence Re Protection Against Effects of LOCA | 18 February 1998 | Duke Energy Rencheck M | Forwards List of Commitments,Conclusions Presented in 980130 Telcon,Description of long-term CAs Required to Resolve Conflicts within FSAR & Summary of Previously Docketed Correspondence Re Protection Against Effects of LOCA | Other |
3F0697-13, Responds to to Update NRC on Ifi 95-15-02 Re Protection Against Dynamic Effects of Loca.Insp Completed & Summary of Field Insp Results | 5 June 1997 | Duke Energy Holden J | Responds to to Update NRC on Ifi 95-15-02 Re Protection Against Dynamic Effects of Loca.Insp Completed & Summary of Field Insp Results | Other |
3F0997-01, Submits Suppl to NRC Ltr Re Protection Against Dynamic Effects of Loca.In Addition,Issue Being Tracked by NRC as Inspector Followup Item 50-302/95-15-02.W/one Oversize Drawing | 29 September 1997 | Duke Energy Rencheck M | Submits Suppl to NRC Ltr Re Protection Against Dynamic Effects of Loca.In Addition,Issue Being Tracked by NRC as Inspector Followup Item 50-302/95-15-02.W/one Oversize Drawing | Other |
3F1197-29, Responds to NRC Expressing Concerns Re Basis for & Conclusion of USQ Determination for Resolution of Jet Impingement Issue Provided on 970929.10CFR50.59 Program for CR-3 Sound & Effective | 7 November 1997 | Duke Energy Holden J | Responds to NRC Expressing Concerns Re Basis for & Conclusion of USQ Determination for Resolution of Jet Impingement Issue Provided on 970929.10CFR50.59 Program for CR-3 Sound & Effective | Other |
3F1297-05, Forwards Rev 0 to Calculation M97-0121,IAW Commitment to re-evaluate Conclusion Re LOCA Effects of Jet Impingement | 13 December 1997 | Duke Energy Rencheck M | Forwards Rev 0 to Calculation M97-0121,IAW Commitment to re-evaluate Conclusion Re LOCA Effects of Jet Impingement | Other |
ML20147J251 | 10 April 1997 | NRC (Affiliation Not Assigned) Raghavan L | Discusses Plant Unit 3 Re Licensing Basis for Dynamic LOCA Effects.Requests Info for Resolving Ifi 95-15-02 | Other |
ML20197H315 | 22 December 1997 | Duke Energy | Rev 19 to AR-401, PSA F Annunciator Response | Request |
ML20198H970 | 22 December 1997 | NRC (Affiliation Not Assigned) Raghavan L | Discusses Plant Protection Against Dynamic Effects of Loca. Based on Evaluation,Nrc Find Util SW Piping Operability Determination to Be Acceptable | Other |
ML20211P928 | 9 October 1997 | NRC (Affiliation Not Assigned) Raghavan L | Discusses Submitting Results of Analysis of Potential Dynamic Effects of Pressurizer Surge Line Following loss-of-coolant-accident on Svc Water Sys Piping | Other |