Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
ML20153E36318 September 1998FirstEnergy
Langenbach J
Requests Withdrawal of TS Change Request 243 from Further Consideration.Request to Delete Surveillances Will Be re-addressed by Separate Correspondence in Near FutureWithdrawal
ML20153G14425 September 1998NRC (Affiliation Not Assigned)
Colburn T
Forwards Notice of Withdrawal of 960410 & Suppl , Application for Amend to Plant,Unit 1.Proposed Changes Would Have Extended Surveillance Interval on Several Instruments from 18 to 24 Months +/- 25%,IAW GL 91-04Withdrawal
ML20217Q0787 April 1998NRC (Affiliation Not Assigned)
Colburn T
Forwards Request for Addl Info Re 2-yr Surveillance Interval Extension for Certain TS Surveillances IAW Provisions of GL 91-04,dtd 910402RAI