Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
A03035, Forwards Response to NRC Request for Addl Info Re Operability of 6-inch Butterfly Containment Purge & Vent Valves.Based on Analyses,Adequate Justification Does Not Exist to Warrant Mods to Equipment28 March 1983Counsil W
Northeast Nuclear Energy
Forwards Response to NRC Request for Addl Info Re Operability of 6-inch Butterfly Containment Purge & Vent Valves.Based on Analyses,Adequate Justification Does Not Exist to Warrant Mods to EquipmentRequest
A03992, Requests Informal Appeal Meeting W/Nrc to Review Requested Mod of Hydrogen Purge Valves to Close on High Radiation Signal,Per Generic Ltr 84-08 & NUREG-0737,Item II.E.4.2.715 May 1984NORTHEAST UTILITIES
Counsil W
Northeast Nuclear Energy
Requests Informal Appeal Meeting W/Nrc to Review Requested Mod of Hydrogen Purge Valves to Close on High Radiation Signal,Per Generic Ltr 84-08 & NUREG-0737,Item II.E.4.2.7Meeting
A04104, Forwards Overview Re Appeal for Requested Mod of Hydrogen Purge Sys Valves to Close on Radiation Signal,Per Generic Ltr 84-08 & NUREG-0737,Item II.E.4.2.7, Containment Venting at Power. Addl Info Re Leakage Testing Expected by 84073011 July 1984NORTHEAST UTILITIES
Counsil W
Northeast Nuclear Energy
Forwards Overview Re Appeal for Requested Mod of Hydrogen Purge Sys Valves to Close on Radiation Signal,Per Generic Ltr 84-08 & NUREG-0737,Item II.E.4.2.7, Containment Venting at Power. Addl Info Re Leakage Testing Expected by 840730Other
A06539, Ack Receipt of Encl NRC Invoices for Costs Incurred in Review of Util Submittals for Plants.Fee Will Be Sent to J Rodriquez,Per 10CFR50,55 & 17029 May 1987NORTHEAST UTILITIES
Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Northeast Nuclear Energy
Ack Receipt of Encl NRC Invoices for Costs Incurred in Review of Util Submittals for Plants.Fee Will Be Sent to J Rodriquez,Per 10CFR50,55 & 170Other
A06958, Confirms 880515 Revised Due Date for Util Response to NRC Request for Addl Info Re Inservice Insp Program,Per Telcons W/Facility Project Manager8 January 1988NORTHEAST UTILITIES
Mroczka E
Northeast Nuclear Energy
Confirms 880515 Revised Due Date for Util Response to NRC Request for Addl Info Re Inservice Insp Program,Per Telcons W/Facility Project ManagerRequest
B11269, Forwards Figure 3.1,per Re NUREG-0737,Item II.E.4.2.7, Containment Venting at Power, Providing Justification That Isolation Logic for Hydrogen Purge Valves Adequate13 July 1984NORTHEAST UTILITIES
Counsil W
Sears C
Northeast Nuclear Energy
Forwards Figure 3.1,per Re NUREG-0737,Item II.E.4.2.7, Containment Venting at Power, Providing Justification That Isolation Logic for Hydrogen Purge Valves AdequateOther
B11271, Application for Amend to License DPR-65,revising Tech Specs Re Fire Protection Sys,Including Fire Detectors,Fire Water Pump Diesels,Spray/Sprinkler Sys,Hose Station & Penetration Fire Barriers.Fee Paid28 May 1985Opeka J
NORTHEAST UTILITIES
Sears C
Northeast Nuclear Energy
Application for Amend to License DPR-65,revising Tech Specs Re Fire Protection Sys,Including Fire Detectors,Fire Water Pump Diesels,Spray/Sprinkler Sys,Hose Station & Penetration Fire Barriers.Fee PaidRequest
B11549, Proposed Tech Spec Revs to Sections 5 & 3/4.9,expanding Storage Capacity of Spent Fuel Pool from 667 to 1,112 Storage Locations by Reracking Spent Fuel Pool W/Combination of Poison & Nonpoison Racks in Two Region Arrangement24 July 1985Northeast Nuclear EnergyProposed Tech Spec Revs to Sections 5 & 3/4.9,expanding Storage Capacity of Spent Fuel Pool from 667 to 1,112 Storage Locations by Reracking Spent Fuel Pool W/Combination of Poison & Nonpoison Racks in Two Region ArrangementOther
B11598, Forwards Millstone Nuclear Power Station Unit 2 Inservice Insp & Testing Program, for Second 10-yr Insp Interval to Commence on 851226.Response Re Acceptability Requested by 85122627 June 1985Opeka J
NORTHEAST UTILITIES
Northeast Nuclear Energy
Forwards Millstone Nuclear Power Station Unit 2 Inservice Insp & Testing Program, for Second 10-yr Insp Interval to Commence on 851226.Response Re Acceptability Requested by 851226Request
B11712, Forwards Response to 850826 Request for Addl Info Re Util 850724 Proposed Change to Tech Spec Mods for Spent Fuel Storage Pool Capacity16 September 1985Opeka J
NORTHEAST UTILITIES
Sears C
Northeast Nuclear Energy
Forwards Response to 850826 Request for Addl Info Re Util 850724 Proposed Change to Tech Spec Mods for Spent Fuel Storage Pool CapacityRequest
B11733, Rev to 850528 Application to Amend License DPR-65,adding Continuous or Hourly Fire Watch Patrol Until Temporary or Inoperable Fire Barrier Permanently Repaired.Determinations Re 10CFR50,App R Still Applicable1 October 1985Opeka J
NORTHEAST UTILITIES
Northeast Nuclear Energy
Rev to 850528 Application to Amend License DPR-65,adding Continuous or Hourly Fire Watch Patrol Until Temporary or Inoperable Fire Barrier Permanently Repaired.Determinations Re 10CFR50,App R Still ApplicableRequest
B11766, Submits Isap Topic 1.11, Post-Accident Hydrogen Monitor Per 850517 Commitment.Installation of Redundant Containment Hydrogen Monitor Unnecessary.Addl Info Will Be Provided by 86013125 November 1985Opeka J
NORTHEAST UTILITIES
Northeast Nuclear Energy
Submits Isap Topic 1.11, Post-Accident Hydrogen Monitor Per 850517 Commitment.Installation of Redundant Containment Hydrogen Monitor Unnecessary.Addl Info Will Be Provided by 860131Request
B11777, Forwards Response to Request for Addl Info Re 850724 Application to Revise Tech Specs on Spent Fuel Storage Capacity17 October 1985Opeka J
NORTHEAST UTILITIES
Mroczka E
Northeast Nuclear Energy
Forwards Response to Request for Addl Info Re 850724 Application to Revise Tech Specs on Spent Fuel Storage CapacityRequest
B11827, Forwards Addl Info Requested in Oct 1985 Re Util Request to Modify Tech Specs Concerning Spent Fuel Storage Capacity28 October 1985Opeka J
NORTHEAST UTILITIES
Fee W
Northeast Nuclear Energy
Forwards Addl Info Requested in Oct 1985 Re Util Request to Modify Tech Specs Concerning Spent Fuel Storage CapacityOther
B11889, Forwards Confirmation of Resolution to Request for Addl Info Re Application for Increased Spent Fuel Storage Capacity Based on Series of Telcons25 November 1985Opeka J
NORTHEAST UTILITIES
Northeast Nuclear Energy
Forwards Confirmation of Resolution to Request for Addl Info Re Application for Increased Spent Fuel Storage Capacity Based on Series of TelconsRequest
B11893, Forwards Review of Spent Fuel Storage Capacity Expansion Request,Containing Proposed Mod to Tech Spec Re Decay Time Requirement,In Response to NRC 850826 Request for Addl Info27 November 1985Opeka J
Sears C
Northeast Nuclear Energy
Forwards Review of Spent Fuel Storage Capacity Expansion Request,Containing Proposed Mod to Tech Spec Re Decay Time Requirement,In Response to NRC 850826 Request for Addl InfoRequest
B11910, Responds to Request for Addl Info Re Spent Fuel Storage Capacity.Analysis Showing That Adjacent Modules Do Not Contact During Seismic Event Inadvertently Omitted from3 December 1985Opeka J
NORTHEAST UTILITIES
Mroczka E
Northeast Nuclear Energy
Responds to Request for Addl Info Re Spent Fuel Storage Capacity.Analysis Showing That Adjacent Modules Do Not Contact During Seismic Event Inadvertently Omitted fromRequest
B11916, Provides Supplemental Relief Request Info Re Inservice Insp & Testing Program.Main Feed Sys Check Valves 2-FW-5A & 2-FW-5B Cannot Be Tested Per ASME Boiler & Pressure Vessel Code.Periodic Valve Disassembly Suggested16 December 1985Opeka J
NORTHEAST UTILITIES
Northeast Nuclear Energy
Provides Supplemental Relief Request Info Re Inservice Insp & Testing Program.Main Feed Sys Check Valves 2-FW-5A & 2-FW-5B Cannot Be Tested Per ASME Boiler & Pressure Vessel Code.Periodic Valve Disassembly SuggestedSupplement
ML20078N84727 October 1983NORTHEAST UTILITIES
Counsil W
Northeast Nuclear Energy
Forwards Response to NRC 830902 Comments on Unresolved Items Re Containment Purge/Vent Review.No Addl Tech Specs or Equipment Mods Warranted.Operability Requirement Met W/Compliance W/Tmi Item II.E.4.2Other
ML20126M29824 July 1985Opeka J
NORTHEAST UTILITIES
Northeast Nuclear Energy
Application for Amend to License DPR-65,revising Tech Specs to Expand Storage Capacity of Spent Fuel Pool from 667 to 1,112 Storage Locations by Reracking Spent Fuel Pool W/Combination of Poison & Nonpoison Racks.Fee PaidRequest
ML20129A15131 May 1985Northeast Nuclear EnergyProposed Tech Specs Re Fire Protection Sys,Including Fire Detectors,Fire Water Pump Diesels,Spray/Sprinkler Sys,Hose Station & Penetration Fire BarriersOther
ML20133E7073 October 1985Butcher E
Office of Nuclear Reactor Regulation
Forwards Structural & Geotechnical Engineering Branch Request for Addl Info to Complete Review of 850724 Application to Modify Tech Specs Re Spent Fuel Storage Capacity ExpansionRAI
ML20133F2641 October 1985Northeast Nuclear EnergyProposed Rev to Tech Spec 3/4.7.10,adding Continuous or Hourly Fire Watch Patrol Until Temporary or Inoperable Fire Barrier Permanently RepairedOther
ML20134A58729 October 1985Office of Nuclear Reactor Regulation
Osborne D
Forwards Notice of Consideration of Issuance of Amend to License DPR-65 & Proposed NSHC Determination & Opportunity for Hearing Re 850724 Application to Expand Spent Fuel Pool Storage CapacityOther
ML20134A59929 October 1985Butcher E
Office of Nuclear Reactor Regulation
Notice of Consideration of Issuance of Amend to License DPR-65 & Proposed NSHC Determination & Opportunity for Hearing.Amend Authorizes Licensee to Increase Spent Fuel Pool Storage Capacity from 667 to 1,112 Storage LocationsOther
ML20134N60526 August 1985Butcher E
Office of Nuclear Reactor Regulation
Forwards Auxiliary Sys Branch Request for Addl Info Re Util 850724 Request to Modify Tech Spec Concerning Expansion of Spent Fuel Storage Capacity.Response Requested within 15 DaysRAI
ML20135G1695 September 1985Butcher E
Office of Nuclear Reactor Regulation
Forwards Request for Addl Info Re Spent Fuel Storage Capacity Expansion,To Complete Review of 850724 Request to Modify Tech Specs.Info Requested within 15 Days of Ltr ReceiptRAI
ML20137A49031 December 1985Opeka J
NORTHEAST UTILITIES
Northeast Nuclear Energy
Forwards Addl Info Demonstrating Compliance w/NUREG-0737, Item II.E.4.2.7 Re Containment Venting Through Hydrogen Purge Valves,Per 840425,0902 & 1211 RequestsOther
ML20137B42316 December 1985Thadani A
Office of Nuclear Reactor Regulation
Forwards Environ Assessment & Finding of No Significant Impact Re 850724 Request for Amend to License DPR-65 Concerning Spent Fuel Pool ExpansionOther
ML20137B43216 December 1985Thadani A
Office of Nuclear Reactor Regulation
Notice of Environ Assessment & Finding of No Significant Impact Re Issuance of Amend to License DPR-65,changing Tech Specs to Increase Storage Capacity of Spent Fuel PoolApproval
ML20137B44216 December 1985Thadani A
Office of Nuclear Reactor Regulation
Environ Assessment & Finding of No Significant Impact Supporting Amend to License DPR-65,authorizing Increase of Spent Fuel Pool Storage CapacityOther
ML20141F8783 January 1986Thadani A
Office of Nuclear Reactor Regulation
Advises That Review Underway of Proposed Inservice Insp & Testing Program,Submitted on 850627.Proposal Would Increase Program Beyond Current Tech Spec Requirements.Final Approval of Submission Will Be Granted Upon Completion of ReviewOther
ML20150C71528 June 1988Jaffe D
Office of Nuclear Reactor Regulation
Forwards Request for Addl Info Re Pump & Valve Inservice Testing Program.Response Requested within 60 Days of Receipt of LtrRAI
ML20151M06214 April 1988Office of Nuclear Reactor Regulation
Boyle M
Advises That Revised post-fire Safe Shutdown Methodology Conforms W/Requirements of Sections III.G.3. & Iii.L of App R,10CFR50 & Acceptable,Per .Technical Evaluation Rept SAIC-87/3084 EnclOther
ML20154E98812 May 1988NORTHEAST UTILITIES
Mroczka E
Northeast Nuclear Energy
Fowards Addl Info Re Inservice Insp Program,Per 880212 Request.Attachment 1 Consists of Util Response to Questions Posed in NRC & Attachment 2 Consists of Revised Program SectionsOther
ML20195G5272 October 1987SCIENCE APPLICATIONS INTERNATIONAL CORP. (FORMERLYTechnical Evaluation Rept:Millstone Nuclear Power Station, Unit 1,Post-Fire Shutdown Evaluation,App ROther
ML20214N79727 May 1987Jaffe D
Office of Nuclear Reactor Regulation
Forwards Request for Addl Info for Review of 850627 Submittal Re Inservice Testing at Facility.Addl Info Should Be Submitted within 60 Days of Ltr ReceiptRAI