Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
ML16103A25514 April 2016Galvin D J
Plant Licensing Branch II
05/02/2016 Notice of Forthcoming Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson and Shearon Harris Plants (CAC Nos. MF7443 and MF7444)Request
ML16112A2932 May 2016Duke Energy05/02/2016 Presentation for Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson And Shearon Harris Plants (CAC Nos. MF7443 And MF7444)Request
ML16124A99627 May 2016Dennis Galvin
Plant Licensing Branch II
Request for Withholding of Proprietary Information from Public Disclosure for Shearon Harris Nuclear Power Plant, Unit 1, and H. B. Robinson Steam Electric Plant Unit No. 2Withholding Request Acceptance
ML16125A09920 May 2016Dennis Galvin
Plant Licensing Branch II
Summary of May 2, 2016, Meeting with Duke Energy Progress, Inc. to Discuss Fuel Reload Design Methodology Reports and Proposed Supplement to a License Amendment Request Regarding Shearon Harris and H.B. RobinsonMeeting
RA-15-0004, Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5, Thermalhydraulic Statistical Core Design Methodology5 March 2015Duke Energy
Frisco J
Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5, Thermalhydraulic Statistical Core Design MethodologyRequest
RA-15-0042, Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis.19 November 2015Duke Energy
Repko R
Application to Revise Technical Specifications to Adopt Methodology Report DPC-NE-3008-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis.Request