Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
ML15309A7281 December 2015Martha Barillas
Plant Licensing Branch II
Acceptance of Requested Licensing Action Regarding Duke Energy Progress, Inc. Application to Revise Technical Specifications to Adopt Methodology ReportAcceptance Review
ML15328A06116 December 2015Martha Barillas
Plant Licensing Branch II
Request for Withholding of Proprietary Information from Public Disclosure for Shearon Harris Nuclear Power Plant, Unit 1 and H. B. Robinson Steam Electric Plant Unit No. 2Withholding Request Acceptance
ML16145A16524 June 2016Dennis Galvin
Plant Licensing Branch II
Request for Withholding of Proprietary Information from Public Disclosure for Shearon Harris Nuclear Power Plant, Unit 1, and H. B. Robinson Steam Electric Plant Unit No. 2Withholding Request Acceptance
ML16235A23817 October 2016Martha Barillas
Plant Licensing Branch II
Summary of the July 12-13, 2016 Audit Supporting the U.S. Nuclear Regulatory Commission Review of DPC-NE-1008-P, Nuclear Design Methodology Using CASMO-5/SIMULATE-3 for Westinghouse ReactorsApproval
ML16292A52227 October 2016Martha Barillas
Plant Licensing Branch II
Request for Withholding Information from Public Disclosure H.B. Robinson Steam Electric Plant, Unit No. 2 and Shearon Harris Nuclear Power Plant (CAC Nos. MF6648 and MF6649)Withholding Request Acceptance
ML16336A12114 February 2017Martha Barillas
Plant Licensing Branch II
Request for Withholding of Proprietary Information from Public DisclosureWithholding Request Acceptance
ML17102A92318 May 2017Martha Barillas
Plant Licensing Branch II
Nonproprietary Issuance of Amendments Revising Technical Specifications for Methodology Reports DPC Ne 1008 P Revision 0, DPC Nf 2010 Revision 3 and DPC Ne 2011 P Revision 2 (CAC Nos. MF6648, MF6649, MF7693/MF7694)Approval
RA-16-0036, Regarding Response to Request for Additional Information Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-1008, Rev 03 October 2016Duke Energy
Elinitsky J
Regarding Response to Request for Additional Information Regarding Application to Revise Technical Specifications for Methodology Report DPC-NE-1008, Rev 0Response to RAI