Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML060200292 | 16 January 2006 | Cooper Nuclear Station - Revised and Supplemental Pages to License Amendment Request for Application of the Alternative Source Term for Reevaluation of the Fuel Handling Accident Dose Consequences |
ML062860186 | 20 October 2004 | SERP Worksheet for SDP-Related Finding at Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency |
ML062860197 | 30 November 2004 | E-Mail from Sanborn to Allen Et Al., Agenda for Region IV Serp'S on Thurs., Dec. 2, Outside Scope |
ML062860205 | 1 December 2004 | E-Mail from Sanborn to Allen Draft Excerpt from Report to Support Agenda for Region IV SERPs on Thurs., Dec 2, Outside Scope |
ML062860215 | 2 December 2004 | SERP Worksheet for DP-Related Finding at Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency |
ML072280315 | 10 August 2007 | Cooper - License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio |
ML073300571 | 19 November 2007 | Cooper - License Amendment Request to Revise Technical Specifications - Appendix K Measurement Uncertainty Recapture Power Uprate |
ML082910768 | 13 October 2008 | Cooper Nuclear Station - License Amendment Request for Application of the Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequences |
ML111730060 | 13 June 2011 | 2011-06 Final Written Exam |
ML111860006 | 11 June 2011 | 2011-06 Draft Written Exam |
ML120130205 | 16 February 2012 | Issuance of Amendment No. 241, Editorial Changes to Several Technical Specifications (Tss) and Revise TS 5.5.6 to Remove Expired One-Time Exception to 5-Year Test Frequency for a Safety Valve |
ML12157A206 | 30 May 2012 | License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio |
ML12251A098 | 28 September 2012 | Issuance of Amendment No. 242, Revise Technical Specifications to Implement a 24-Month Fuel Cycle and Adopt Technical Specification Task Force (TSTF)-493, Revision 4, Option a |
ML12297A439 | 30 October 2012 | 2012-10 Draft Written Exam |
ML12297A450 | 30 October 2012 | 10 Draft Ops Test |
ML12299A092 | 9 November 2012 | Issuance of Amendment No. 243, Revise Technical Specification 2.0, Safety Limits, to Revise Safety Limit Minimum Critical Power Ratio Values of a Cycle-Specific Calculation |
ML12319A055 | 21 November 2012 | Correction to Amendment No. 242 Technical Specification (TS) and Safety Evaluation, Revise TSs to Implement a 24-Month Fuel Cycle and Adopt Technical Specification Task Force (TSTF)-493, Revision 4, Option a |
ML12353A485 | 30 October 2012 | 10 Final as Given Ops Test |
ML14234A338 | 4 August 2014 | 2014-07 Draft Written Exam |
ML14234A344 | 4 August 2014 | 2014-07 Final Written Exam with Key |
ML15216A259 | 27 August 2015 | Issuance of Amendment No. 252, Revise Technical Specification 3.5.2, ECCS - Shutdown, to Delete Condensate Storage Tank as Alternate Source of Makeup Water |
ML15343A301 | 22 January 2016 | Issuance of Amendment No. 253 to Technical Specifications to Add Residual Heat Removal System Containment Spray Function |
ML16120A370 | 21 April 2016 | License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio |
ML16272A137 | 17 October 2016 | Issuance of Amendment No. 257 Revision of Technical Specifications - Safety Limit Minimum Critical Power Ratio |
ML17061A050 | 31 March 2017 | Issuance of Amendment No. 258 Adoption of TSTF-425, Revision 3, |
ML18024A375 | 24 January 2018 | NRR E-mail Capture - Cooper Nuclear Station - Final RAI LAR to Adopt TSTF-542 (CAC MG0138; EPID L-2017-LLA-0290) |
ML18137A210 | 10 May 2018 | License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio |
ML18186A549 | 1 August 2018 | Issuance of Amendment No.260 Revision to Technical Specifications to Adopt (TSTF) Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC No. MG0138; EPID L-2017-LLA-0290) |
ML18218A483 | 6 September 2018 | Issuance of Amendment No. 261 Safety Limit Minimum Critical Power Ratio |
ML19207C389 | 20 August 1979 | Forwards LER 79-019/01T-0 |
ML19259A735 | 27 December 1978 | Forwards Info as Requested in NUREG-0312 Outlining Proposed Insp Plan Re Planned Feedwater Nozzle Insp Program for April 1979.W/insp Results & Summary of Repairs Made in Fall of 1976 |
ML19269D608 | 29 May 1979 | Forwards Results of Analysis Performed by GE Re Suppression Pool Temp Transients.Will Revise Station Operating Procedure by 790615 to Depressurize Reactor Vessel |
ML19275A131 | 2 August 1979 | Forwards LER 79-005/03X-1 |
ML19276H020 | 3 August 1979 | Forwards LER 79-018/03L-0 |
ML19324C114 | 9 November 1989 | Responds to Jl Milhoan 891010 Request for Addl Info Re Util Response to Violations Noted in Insp Rept 50-298/89-28. Corrective Actions:Random Sample of Design Changes, Classified as Essential Selected for Detailed Review |
ML19325E220 | 27 October 1989 | LER 89-025-00:on 890928,main Turbine Trip Occurred,Followed Immediately by Reactor Scram.Caused by Spurious Actuation of Level Switch Due to Equipment Vibration.Plant Stabilized & Temporary Instruction Re Pump Shifting issued.W/891027 Ltr |
ML19339F324 | 31 January 1992 | Forwards Communication Description,Survey Questionnaire & Data Point Library (Dpl) to Be Used W/Emergency Response Data Sys (Erds),Per Rev 1 to NUREG-1394 |
ML19352G194 | 28 January 2020 | Issuance of Amendment No. 264 Elimination of Technical Specification Requirements for Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process |
ML20004D673 | 26 May 1981 | Forwards LER 81-008/03L-0.Detailed Event Analysis Encl |
ML20005E333 | 26 December 1989 | LER 89-026-00:on 891125,reactor Scram Occurred Due to Closure of Outboard Msivs.Caused by post-filter Media Ignition by Hot Air or Particles from Dryer.Air Dryer B Disassembled & inspected.W/891226 Ltr |
ML20008E221 | 15 October 1980 | Forwards Request That TMI-2 Lessons Learned Radiological Tech Specs Be Modified.Submits Info Required Per 800702 Request |
ML20011F132 | 23 February 1990 | LER 90-001-00:on 900124,outboard Steam Supply Line Isolation Valve Unexpectedly Closed During Surveillance Testing,Causing Isolation of HPCI Sys.Caused by Procedural Inadequacy.Test Procedure Will Be upgraded.W/900223 Ltr |
ML20046B532 | 29 July 1993 | Responds to NRC Bulletin 93-003, Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs Per GL 92-04 |
ML20052E266 | 30 April 1982 | Proposed Tech Spec Changes Re Future Reload Analyses |
ML20055D869 | 18 February 2020 | Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors |
ML20058H394 | 13 November 1990 | Discusses Implementation of Corrective Action When Limitorque Actuators Inoperable Due to Hydraulic Lockup. Mfg Completed Effort to Prevent Hydraulic Lock in Spring Pack |
ML20069K483 | 21 April 1983 | Submits Description of Design Compliance w/NUREG-0737, Item II.K.3.13, RCIC Automatic Restart, in Response to NRC 830316 Request.Ge Type Hfa Relay Added to RCIC Original Sys Design |
ML20069L830 | 27 April 1983 | Application to Amend License DPR-46,changing Tech Specs to Incorporate NUREG-0737 Items Per 830110 Generic Ltr 83-02 |
ML20070K390 | 3 March 2020 | Report of Changes to Emergency Plan Implementing Procedure 5.7.1 |
ML20073J227 | 26 September 1994 | Application for Amend to License DPR-46,consisting of Proposed Change 136,revising TS LCOs 3.5.C.1 & 3.5.C.4 to Increase Min Pressure at Which HPCI Sys Required to Be Operable |