Issue date | Title | |
---|---|---|
IR 05000259/1987026 | 31 July 1987 | Insp Repts 50-259/87-26,50-260/87-26 & 50-296/87-26 on 870601-30.Violations Noted.Major Areas Inspected:Maint Observation,Environ Qualification of Electrical Equipment, Employee Concerns Program & Operator Training |
IR 05000259/1989006 | 3 May 1989 | Insp Repts 50-259/89-06,50-260/89-06 & 50-296/89-06 on 890130-0203 & 0214-0310.Violations & Deviations Noted.Major Areas Inspected:Adequacy of Testing,Calibr,Maint & Configuration Control of safety-related Instrumentation |
IR 05000259/2003002 | 5 May 2003 | IR 05000259-03-002, IR 05000260-03-002, IR 05000296-03-002, on 12/29/2002 - 04/05/2003, Tennessee Valley Authority; Browns Ferry, Units 1, 2 and 3; Event Follow-up |
IR 05000259/2005007 | 15 August 2005 | IR 05000259-05-007, on 04/17/2005 - 07/16/2005, Tennessee Valley Authority |
IR 05000259/2006002 | 28 April 2006 | IR 05000259-06-002, 05000260-06-002, 05000296-06-002; 01/01/2006 - 03/31/2006; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Maintenance Risk Assessments, Emergent Work Evaluation, and Event Follow Up |
IR 05000259/2006009 | 5 March 2007 | IR 05000259-06-009, Brown Ferry, Unit 1 Recovery - NRC Integrated Inspection Report |
IR 05000259/2007003 | 30 July 2007 | IR 05000259-07-003, 05000260-07-003, & 05000296-07-003, on April 1-June 30, 2007, Browns Ferry Nuclear Plant, Units 1, 2, & 3 |
IR 05000259/2008005 | 30 January 2009 | IR 05000259-08-005, 05000260-08-005 and 05000296-08-005, on 10/01/2008 - 12/31/2008, Browns Ferry Nuclear Plant, Units 1, 2 and 3; Licensed Operator Requalification Program |
IR 05000259/2009002 | 30 April 2009 | IR 05000259-09-002, 05000260-09-002 and 05000296-09-002, on 01/01/2009 - 03/31/2009, Browns Ferry Nuclear Plant, Units 1, 2 and 3; Surveillance Testing, Identification and Resolution of Problems, and Event Follow-up |
IR 05000259/2009004 | 30 October 2009 | IR 05000259-09-004, IR 05000260-09-004, IR 05000296-09-004, on 07/01/09 - 09/31/09, Browns Ferry, Units 1, 2, and 3 |
IR 05000259/2009005 | 2 February 2010 | IR 05000259-09-005, 05000260-09-005, and 05000296-09-005; 10/01/2009 - 12/31/2009; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Event Follow-Up |
IR 05000259/2009009 | 20 January 2010 | IR 05000259-09-009, 05000260-09-009, 05000296-09-009; 09/21/2009 - 09/25/2009; Browns Ferry Nuclear Plant, Units 1, 2, & 3; Triennial Fire Protection Inspection |
IR 05000259/2011003 | 8 August 2011 | IR 05000259-11-003, 05000260-11-003, 05000296-11-003; 04/01/2011 - 06/30/2011; Browns Ferry Nuclear Plant, Units 1, 2 and 3; Annual Heat Sink Performance, Operability Evaluations |
IR 05000259/2011004 | 14 November 2011 | IR 05000259-11-004, 05000260-11-004, 05000296-11-004; on 07/01/2011 - 09/30/2011, Browns Ferry, Units 1, 2, and 3; Integrated Inspection Report |
IR 05000259/2013004 | 14 November 2013 | IR 05000259-13-004, 05000260-13-004, & 05000296-13-004, July 1, 2013, Through September 30, 2013, Browns Ferry, Integrated Inspection Report and Exercise of Enforcement Discretion |
IR 05000259/2022004 | 7 February 2023 | Integrated Inspection Report 05000259/2022004, 05000260/2022004 and 05000296/2022004 |
IR 05000260/2006014 | 30 October 2006 | IR 05000260-06-014, 05000296-06-014, on 08/282006 - 09/01/2006 and 09/11-15/2006; Browns Ferry, Units 2 and 3; Fire Protection |
IR 05000298/2016004 | 26 January 2017 | NRC Integrated Inspection Report 05000298/2016004 and Exercise of Enforcement Discretion |
Information Notice 1990-22, Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units | 23 March 1990 | Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units |
Information Notice 1992-16, Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown | 25 February 1992 | Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown |
Information Notice 1993-27, Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization | 8 April 1993 | Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization |
Information Notice 1993-62, Thermal Stratification of Water in BWR Reactor Vessels | 10 August 1993 | Thermal Stratification of Water in BWR Reactor Vessels |
Information Notice 1993-89, Potential Problems with BWR Level Instrumentation Backfill Modifications | 26 November 1993 | Potential Problems with BWR Level Instrumentation Backfill Modifications |
Information Notice 1994-36, Undetected Accumulation of Gas in Reactor Coolant System | 24 May 1994 | Undetected Accumulation of Gas in Reactor Coolant System |
Information Notice 1994-52, Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1 | 15 July 1994 | Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1 |
Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel | 18 January 1996 | Partial Bypass of Shutdown Cooling Flow from Reactor Vessel |
Information Notice 1996-37, Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown | 18 June 1996 | Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown |
Information Notice 1996-42, Unexpected Opening of Multiple Safety Relief Valves | 5 August 1996 | Unexpected Opening of Multiple Safety Relief Valves |
Information Notice 1996-56, Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power | 22 October 1996 | Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power |
Information Notice 1996-65, Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown | 11 December 1996 | Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown |
Information Notice 1997-83, Recent Events Involving Reactor Coolant System Inventory Control During Shutdown | 5 December 1997 | Recent Events Involving Reactor Coolant System Inventory Control During Shutdown |
Information Notice 1999-14, Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick | 5 May 1999 | Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick |
L-79-012, Regulatory Framework for Restart | 28 February 2003 | Regulatory Framework for Restart |
ML012990212 | 18 October 2001 | Exam Final Jpms. September 17-21, 2001 |
ML020030431 | 27 September 1994 | License Amendments 212, 227 & 185, Eliminating Requirements in Technical Specifications (TS) for Automatic Actuation of Several Functions Upon Msrm Detection of High Radiation Conditions in Main Steam Lines |
ML021000402 | 29 March 2002 | Technical Specification Page for Browns Ferry, Unit 3, Amendment 234 |
ML021640117 | 12 June 2002 | Meeting with Tennessee Valley Authority Re Actions Required for Browns Ferry, Unit 1 Restart |
ML021720680 | 12 June 2002 | Enclosure 2 (License Handout) (Paper Copy) Re Browns Ferry Nuclear Plant, Unit 1 Restart |
ML022200382 | 31 July 2002 | (Bfn), Units 1, 2, & 3, License Amendment Request, Alternative Source Term |
ML023040338 | 19 September 2002 | Part 2 of 4 - Course Outline for R-304-B and BWR Systems Lesson Plans |
ML023100233 | 25 October 2002 | Unit 2 - Technical Specifications Change 420 - Safety Limit Minimum Critical Power Ratio - Cycle 13 Operation |
ML023600026 | 13 December 2002 | (Bfn), Unit 1, Regulatory Framework for Restart of Unit 1 |
ML030210512 | 16 August 2003 | December 2002-301 Exam Final SRO Written Exam with Answers |
ML030630044 | 28 February 2003 | Brown Ferry, Unit 2, Amendment No. 280 Technical Specification Revised Page 2.0-1 for Safety Limits |
ML030700581 | 28 February 2003 | Unit 1 - Regulatory Framework for Restart of Unit 1 |
ML031050093 | 11 April 2003 | License Amendments and Technical Specification Changes - Revision in the Number of Emergency Core Cooling Systems Required in Response to a Loss of Coolant Accident (TS-424) |
ML031150585 | 29 January 1985 | Withdrawn NRC Generic Letter 1985-004: Operator Licensing Examinations |
ML031420357 | 13 May 2003 | Attachments 2 & 3 - Browns Ferry Unit 1 Response to Generic Communications Issued Since 1985 & Presentation Tennessee Valley Authority Browns Ferry Nuclear Plant Unit 1 Regulatory Framework. |
ML032340720 | 16 August 2003 | December 2002 Exam 50-259/2002-301 Draft SRO Written Exam |
ML032340722 | 16 August 2003 | December 2002 Exam 50-259/2002-301 Draft RO Written Exam |