Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RS-16-087, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)29 June 2016Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)High winds
Shutdown Margin
Ultimate heat sink
Mission time
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Temporary Modification
Emergency Lighting
FLEX
B.5.b
Tornado Generated Missile
Fukushima Dai-Ichi
Tornado Missile Protection
Spent Fuel Pool Instrumentation
Earthquake
Pressure Boundary Leakage
Grace period
Unidentified leakage
TMI-12-161, Report No. 12Q0108.70-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Three Mile Island Unit 1, Page D-1 Through End7 November 2012Report No. 12Q0108.70-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Three Mile Island Unit 1, Page D-1 Through EndFukushima Dai-Ichi
Seismically rugged
Earthquake
Scaffolding
Weak link
TMI-13-107, Attachment 1 - Areva Document No. ANP-3102Q1, Response to NRC Ria Regarding License Amendment Request to Update Pressure -Temperature Limit Curves for Three-Mile Island Unit 1, Revision 0, Dated August 201331 August 2013Attachment 1 - Areva Document No. ANP-3102Q1, Response to NRC Ria Regarding License Amendment Request to Update Pressure -Temperature Limit Curves for Three-Mile Island Unit 1, Revision 0, Dated August 2013Exemption Request
TMI-14-061, 40th Year Tendon Surveillance Engineering Report (Topical Report 213), Precision Surveillance Corporation in-Service Inspection Quality Control Procedure, Monitoring Tendon Force (Lift-Offs)3 September 201340th Year Tendon Surveillance Engineering Report (Topical Report 213), Precision Surveillance Corporation in-Service Inspection Quality Control Procedure, Monitoring Tendon Force (Lift-Offs)Boric Acid
Commercial Grade Dedication
Nondestructive Examination
Incorporated by reference
Condition Adverse to Quality
Foreign Material Exclusion
Liquid penetrant
Scaffolding