ML032540372 | 31 May 2003 | Pressure-Temperature Curves for TVA Browns Ferry Units 2 and 3 | Shutdown Margin Anticipated operational occurrence Hydrostatic Finite Element Analysis |
ML032580389 | 28 May 2003 | Enclosure 2 - Responses to the NRC Request for Additional Information on the RFA-2 Licensing Submittal (WBN-TS-02-13) for the Watts Bar Nuclear Plant | |
ML033090236 | 14 April 1998 | Summary Report of Commercial Reactor Criticality Data for Sequoyah Unit 2 | |
ML040210638 | 2 December 2003 | November 2003 - Discharge Monitoring Report | |
ML040910417 | 18 March 2004 | TRC Studies, EPA Information, Bmp Plan, Biodetergent 73551 | Safe Shutdown Grab sample Coatings Zebra Mussel Veliger |
ML041040261 | 5 April 2004 | to Engineering Report Watts Bar Nuclear Plant, Unit 1, Ultimate Heat Sink - 88oF Maximum Operating Temperature Evaluation. | Safe Shutdown Boric Acid Ultimate heat sink Anticipated operational occurrence Time to boil Safe Shutdown Earthquake Enforcement Discretion Pressure Boundary Leakage GOTHIC |
ML041050621 | 12 April 2004 | Diffuser Line Manhole Breach | |
ML041140387 | 20 April 2004 | 10 CFR 50.59, Changes, Tests and Experiments Summary Report | Safe Shutdown Boric Acid Offsite Dose Calculation Manual Stroke time Emergency Lighting Pressure Boundary Leakage |
ML041210261 | 31 January 2003 | Tennessee Valley Authority Systems and Analysis Browns Ferry Nuclear Plant Probabilistic Safety Assessment Unit 2 Summary, Revision 1 | Internal Flooding Probabilistic Risk Assessment Large early release frequency |
ML041480437 | 31 March 2004 | Steam Generator Pulled Tube Examination Watts Bar Unit I - Cycle 5 RFO, Chapters 6 Through 10 | |
ML041610191 | 31 March 2004 | Steam Generator Pulled Tube Examination Watts Bar Unit I - Cycle 5 RFO, Chapters 1 Through 5 | Nondestructive Examination |
ML041840114 | 30 April 2004 | Engineering Report GE-NE-0000-0023-1250-1, Rev 0, Browns Ferry, Units 1, 2 and 3, Steam Dryer Analysis for Extended Power Uprate Conditions. | Safe Shutdown Safe Shutdown Earthquake Operating Basis Earthquake Finite Element Analysis Earthquake Flow Induced Vibration |
ML041840116 | 30 June 2004 | Proposed Technical Specifications Change TS-431, Extended Power Uprate UFSAR Review Matrix, Enclosure 6 | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Ultimate heat sink Non-Destructive Examination Stroke time Anticipated operational occurrence Time to boil Internal Flooding Hydrostatic Probabilistic Risk Assessment Coatings Nondestructive Examination Temporary Modification Finite Element Analysis Significance Determination Process Feedwater Controller Failure Large early release frequency MELLLA Turbine Missile Fuel cladding Fire Protection Program Flow Induced Vibration GOTHIC Power Uprate Failure to Scram |
ML041840413 | 30 April 2004 | Engineering Report, Steam Dryer Analysis for Extended Power Uprate Conditions | Safe Shutdown Safe Shutdown Earthquake Operating Basis Earthquake Finite Element Analysis Earthquake Flow Induced Vibration |
ML042080336 | 2 July 2004 | Response to Request for Additional Information Related to Technical Specifications Change No. TS-405 Alternative Source Term | Safe Shutdown Ultimate heat sink Grab sample Design basis earthquake Earthquake |
ML042380243 | 31 August 2003 | Tennessee Valley Authority System and Analysis Browns Ferry Nuclear Plant, Probabilistic Safety Assessment, Certification and Per Resolution | Safe Shutdown Mission time Finite Element Analysis Large early release frequency Hardened vent |
ML042800052 | 27 May 2004 | Zebra Mussels: Biology, Impacts, and Control, Chapter 13 | Zebra Mussel |
ML043380321 | 15 November 2004 | American Society of Mechanical Engineers Section XI, in Service Inspection Program | Probabilistic Risk Assessment Finite Element Analysis Aging Management EVT-1 |
ML050770370 | 11 March 2005 | Technical Specifications (TS) Change TS-447, Request for Additional Information (RAI) - Extension of Channel Calibration Surveillance Requirement Performance Frequency and Allowable Value Revision | Safe Shutdown Earthquake |
ML051120164 | 19 April 2005 | Emergency Core Cooling System (ECCS) Evaluation Model Changes - Annual Notification and Reporting for 2004 | Stroke time |
ML051360155 | 12 August 1994 | IPE-PRA Revision 1, Unit 2. | |
ML051360162 | 13 April 1995 | IPE-PRA Revision 1A, Unit 2. | |
ML052340503 | 15 August 2005 | Unit 2 Cycle 13 (U2C13) 90-Day Steam Generator (S/G) Report for Voltage-Based Alternate Repair Criteria and W* Alternate Repair Criteria | |
ML052510007 | 7 September 2005 | IR 05000390-05-013, Watts Bar Nuclear Power Plant, Preliminary Greater than Green Finding | Significance Determination Process |
ML060110110 | 17 January 2006 | Letter Cycle 6 SG ISI Reports Review Summary Letter | |
ML060380671 | 2 February 2006 | Response to NRC Request for Additional Information Regarding Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities - Submittal of Browns Ferry Unit 1 Seismic and Internal Fires IPEEE Reports | Hot Short Safe Shutdown High winds Ultimate heat sink Probabilistic Risk Assessment Aging Management Significance Determination Process Design basis earthquake License Renewal Earthquake |
ML060620548 | 27 February 2006 | Brown Ferry Nuclear EPU Containment Overpressure (COP) Credit Risk Assessment. | |
ML060720273 | 30 November 1992 | a Guide for Environmental and Best Management Practices for Tennessee Valley Authority Transmission Construction and Maintenance Activities | |
ML060720293 | 28 February 2005 | Hydrothermal Modeling of Browns Ferry Nuclear Plant with Units 1, 2, and 3 at Extended Power Uprate | Ultimate heat sink |
ML060720354 | 31 March 2006 | GE-NE-0000-0049-6652-01NP, Rev 0, General Electric Boiling Water Reactor Steam Dryer Scale Model Test Based Fluctuating Load Definition Methodology, March 2006 Benchmark Report | Finite Element Analysis Flow Induced Vibration |
ML060880464 | 21 March 2006 | BFN EPU Containment Overpressure (COP) Credit Risk Assessment, Rev. 1 | High winds Mission time Internal Flooding Probabilistic Risk Assessment Coatings Large early release frequency |
ML061070632 | 30 April 2006 | Units 1, 2, & 3 - GENE-0000-0052-3661-01-NP, Test Report #1, Browns Ferry Nuclear Plant; Unit 1, Scale Model Test. | |
ML061300441 | 31 May 2006 | C.D.I. Report 06-11, Rev 1, Hydrodynamic Loads on Browns Ferry, Unit 1 Steam Dryer to 200 Hz. | |
ML061300443 | 31 May 2006 | GE-NE-0000-0053-7413-R0-NP, Browns Ferry, Units 1, 2 & 3 Steam Dryer Stress, Dynamic and Fatigue Analyses for EPU Conditions. | Finite Element Analysis Earthquake Flow Induced Vibration |
ML062090482 | 10 July 2006 | BFN EPU Containment Overpressure (COP) Credit Risk Assessment, Rev. 2 | High winds Mission time Internal Flooding Probabilistic Risk Assessment Large early release frequency |
ML062130343 | 31 July 2006 | C.D.I. Report No. 06-11, Revision 2, Hydrodynamic Loads on Browns Ferry Nuclear Unit 1 Steam Dryer to 200 Hz. | |
ML062210102 | 27 June 2006 | Technical Specifications (TS) Change TS-431 & TS-418 Extended Power Uprate (EPU) - Replacement Cooling Tower | License Renewal Power Uprate |
ML062400477 | 30 June 2006 | GENE-0000-0055-2994-R1-NP, Addendum to Browns Ferry Nuclear Plant Units 1, 2, and 3 Steam Dryer Stress, Dynamic, and Fatigue Analyses for EPU Conditions. | |
ML062790232 | 31 August 2006 | Engineering Report, GE-NE-0000-0053-7413-R4-NP, Browns Ferry, Units 1, 2 and 3 - Steam Dryer Stress, Dynamic and Fatigue Analyses for EPU Conditions. | Finite Element Analysis Earthquake Flow Induced Vibration |
ML062910513 | 24 August 2004 | TVAW001-RPT-001, Rev. 0, Report on Watts Bar, Unit 1 Containment Building Walkdowns for Emergency Sump Strainer Issues. | |
ML062910522 | 5 November 2003 | WB1-DWD-024A, Containment Debris Walkdown Package Watts Bar N. P. Unit 1. | |
ML062920051 | 31 October 2003 | WB1-DWD-005A, Containment Debris Walkdown Package Watts Bar N. P. Unit 1. | Fire Barrier |
ML062920156 | 13 September 2006 | Rev 1 to Technical Specification, NPSH Transient Study RHR and Core Spray Pumps, E12.5.1296 | |
ML063060251 | 15 October 2003 | WB1-DWD-015A, Containment Debris Walkdown Package Watts Bar N. P. Unit 1. | |
ML063180243 | 2 November 2006 | Gnf Additional Information Regarding the Requested Changes to Technical Specification SLMCPR, Cycle 7 | Anticipated operational occurrence Minimum Critical Power Ratio |
ML071160227 | 24 April 2007 | Staff Technical Evaluation Report, 06-03 | Ultimate heat sink |
ML071650168 | 1 April 1999 | NEI Report: RCP Lube Oil Collection System Current Trend Abstract, April 1999 (Revision 1) | Safe Shutdown Safe Shutdown Earthquake Hydrostatic Emergency Lighting Exemption Request Earthquake Fire Protection Program Fire Watch |
ML071720186 | 31 March 2006 | Enclosure 2 Technical Evaluation Report on the Seismic Portion of Browns Ferry Nuclear Plant Unit 1 Individual Plant Examination for External Events | Safe Shutdown High winds Ultimate heat sink Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Emergency Lighting Aging Management Design basis earthquake Earthquake Weak link |
ML071720197 | 31 October 2006 | Enclosure 3 Technical Evaluation Report on the High Winds, Floods, Transportation and Other (Hfo) External Events Portion of Browns Ferry Nuclear Plant Unit 1 Individual Plant Examination for External Events | Safe Shutdown High winds Tornado Generated Missile |
ML072130375 | 31 July 2007 | CDI Report No. 07-05NP, Revision 0, Finite Element Model for Stress Assessment of Browns Ferry, Unit 1, Steam Dryer to 250 Hz | Finite Element Analysis Liquid penetrant |