Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML07172019731 October 2006Enclosure 3 Technical Evaluation Report on the High Winds, Floods, Transportation and Other (Hfo) External Events Portion of Browns Ferry Nuclear Plant Unit 1 Individual Plant Examination for External EventsSafe Shutdown
High winds
Tornado Generated Missile
ML07213037531 July 2007CDI Report No. 07-05NP, Revision 0, Finite Element Model for Stress Assessment of Browns Ferry, Unit 1, Steam Dryer to 250 HzFinite Element Analysis
Liquid penetrant
ML07213038231 July 2007CDI Report No. 07-06NP, Revision 0, Finite Element Model for Stress Assessment of Browns Ferry, Unit 2 & 2 Steam Dryer to 250 HzFinite Element Analysis
Liquid penetrant
ML07213038631 July 2007CDI Report No. 07-09NP, Revision 0, Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements, with Inclusion of a Low Frequency Hydrodynamic Contribution
ML07213040131 July 2007CDI Report No. 07-10NP, Revision 0, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry, Unit 2, Steam Dryer to 250 Hz
ML07213041531 July 2007CDI Report No. 07-11NP, Revision 0, Dynamics of BWR Steam Dryer Components
ML07213042931 July 2007C.D.I. Technical Memorandum No. 07-26NP, Revision 0, Comparison of Browns Ferry Unit 1 & Unit 2 Main Steam Line Strain Gage / Pressure Readings
ML07236026231 August 200707-30NP, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry, Unit 1, Revision 0Finite Element Analysis
ML07236026331 August 200707-31NP, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry, Unit 2 and 3, Revision 0Finite Element Analysis
ML07275004524 September 2007ANP-2631, Revision 0, Browns Ferry Unit 3 Cycle 14 Reload Analysis Report.Shutdown Margin
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Abnormal operational transient
Feedwater Controller Failure
MELLLA
Fuel cladding
ML07285012210 October 2007BWRVIP-145NP, BWR Vessel and Internals Project, Evaluation of Susquehanna Unit 2 Top Guide and Core Shroud Material Samples Using RAMA Fluence Methodology
ML08101045330 April 2008CDI Report No. 08-07NP, Rev. 1, Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer.Finite Element Analysis
Liquid penetrant
ML08101045431 March 2008CDI Report No. 08-05NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 2 Steam Dryer to 250 Hz with Noise Removed.Finite Element Analysis
ML08170029412 June 2008Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Response to ACRS Conclusions and Recommendations Regarding Containment Overpressure CreditSafe Shutdown
Ultimate heat sink
Probabilistic Risk Assessment
Significance Determination Process
Earthquake
Fire Protection Program
ML08175008116 June 2008Encl. 6, Calculation Package 0006982.301, Extended Power Uprate Main Steam Line Strain Gage Vibration Monitoring, and Encl. 7, Response to Round 15 Group 4 and Round 17 Request for Additional InformationTime of Discovery
ML08175008330 June 2008Enclosure 8, CDI Report No. 08-15NP, Stress Assessment of Browns Ferry Nuclear Unit 1 Steam Dryer and Tie-Bar Modifications, Revision 1Finite Element Analysis
Liquid penetrant
ML08175008430 June 2008Enclosure 9, CDI Report No. 08-04NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 1 Steam Dryer to 250 Hz, Revision 1
ML08176025630 June 2008CDI Report No. 08-16NP, Stress Assessments of Brown Ferry Nuclear Unit 2 Steam Dryer with Tie Bar and Hood Modifications, Revision 0Finite Element Analysis
Liquid penetrant
ML08176026030 June 2008CDI Report No. 08-05NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 2 Steam Dryer to 250 Hz with Noise Removed, Revision 2
ML0821900137 August 2008Monthly Operating Reports Second Quarter 2008Reserve Station Service Transformer
Power change
ML08325008314 November 2008(BFN) - Units 1, 2, and 3 - Technical Specifications (TS) Changes TS-418 and TS-431 - Extended Power Uprate (EPU) - Steam Dryer Reports
ML08325008431 October 2008CDI Report No. 08-05NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 2 Steam Dryer to 250 Hz, Revision 3.
ML08325008531 October 2008CDI Report No. 08-14NP, Flow-Induced Vibration in the Main Steam Lines at Browns Ferry Nuclear Units 1 and 2, with and Without Acoustic Side Branches, and Resulting Steam Dryer Loads Revision 0.Finite Element Analysis
Flow Induced Vibration
ML08325008631 October 2008CDI Report No. 08-15NP Stress Assessment of Browns Ferry Nuclear Unit 1 Steam Dryer with Tie-Bar Modifications Revision 2, Cover Page - Page 37Finite Element Analysis
Liquid penetrant
ML08325009031 October 2008CDI Report No. 08-15NP Stress Assessment of Browns Ferry Nuclear Unit 1 Steam Dryer with Tie-Bar Modifications Revision 2, Page 38 - End
ML08325011530 November 2008CDI Report No. 08-20NP, Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Outer Hood and Tie-Bar Reinforcements Revision 0, Cover Page - Page 38Finite Element Analysis
Liquid penetrant
ML08325011630 November 2008CDI Report No. 08-20NP, Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Outer Hood and Tie-Bar Reinforcements Revision 0, Page 39 - End
ML08326003431 October 2008CDI Report No. 08-04NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 1 Steam Dryer to 250 Hz, Revision 2.
ML09055063631 December 2008BWRVIP-199NP, BWR Vessel and Internals Project, Testing and Evaluation of the Monticello 300 Degree Capsule, 1016567NP Final Report
ML09076063128 February 2009CDI Report No. 08-04P, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 1 Steam Dryer to 250 Hz, Revision 3 (Non-proprietary Version)
ML09076063231 March 2009CDI Technical Note No. 07-30NP, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry Nuclear Unit 1, Revision 2 (Non-proprietary Version)Finite Element Analysis
ML09100029231 March 2009CDI Technical Note No. 07-30NP, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry Nuclear Unit 1, Revision 3Finite Element Analysis
ML09100029331 March 2009CDI Report No. 08-04P, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 1 Steam Dryer to 250 Hz, Revision 4
ML09107022731 January 2008Guidance for Post Fire Safe Shutdown Circuit AnalysisHot Short
Safe Shutdown
Fire Barrier
Operator Manual Action
Multiple Spurious Operation
Emergency Lighting
Thermoset
Exemption Request
Power-Operated Valves
Fire Protection Program
ML09107022831 December 2008Guidance for Post Fire Safe Shutdown Circuit AnalysisHot Short
Safe Shutdown
Shutdown Margin
Fire Barrier
Probabilistic Risk Assessment
Coatings
Operator Manual Action
Multiple Spurious Operation
Emergency Lighting
Significance Determination Process
Thermoset
Large early release frequency
Exemption Request
Earthquake
Chernobyl
Fuel cladding
Biofouling
Fire Protection Program
ML09202022330 April 2009CDI Report No. 08-05NP, Rev. 4, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry Nuclear Unit 2 Steam Dryer to 250 Hz, Enclosure 5
ML09202022431 May 2009CDI Technical Note No. 08-13NP, Rev. 1, Limit Curve Analysis with ACM Rev. 4 for Power Ascension at Browns Ferry Nuclear Unit 2, Enclosure 6Finite Element Analysis
ML09202022930 June 2009CDI Report No. 09-13NP, Rev. 0, Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Steam Dam, Outer Hood and Tie-Bar Reinforcements, Introduction Through Page 62, Enclosure 4Finite Element Analysis
Liquid penetrant
ML09202023130 June 2009CDI Report No. 09-13NP, Rev. 0, Stress Assessment of Browns Ferry Nuclear Unit 2 Steam Dryer with Steam Dam, Outer Hood and Tie-Bar Reinforcements, Page 63 Through 128, Enclosure 4
ML09244037331 August 2009CDI Report No. 09-24NP, Rev. 0, Stress Assessment of Browns Ferry Nuclear Unit 1 Steam Dryer to 110% OLTP Power Level, Cover Through Chapter 4 (Non-proprietary Version)Finite Element Analysis
Liquid penetrant
ML09244037431 August 2009CDI Report No. 09-24NP, Rev. 0, Stress Assessment of Browns Ferry Nuclear Unit 1 Steam Dryer to 110% OLTP Power Level, Chapter 5 Through End (Non-proprietary Version)
ML09244037531 August 2009C.D.I. Report No. 09-22NP, Rev. 0, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level to 110% OLTP Power Level on Browns Ferry Nuclear Unit 1 Steam Dryer to 250 Hz (Non-proprietary Version)Finite Element Analysis
ML09246049531 August 2009CDI Report No. 09-23NP, Rev. 0, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level to 120% OLTP Power Level on Browns Ferry Nuclear Unit 1 Steam Dryer to 250 Hz, Enclosure 6
ML09246049631 August 2009CDI Technical Note No. 09-12NP, Rev. 0, Limit Curve Analysis with ACM Rev. 4 for Power Ascension to 120% OLTP at Browns Ferry Nuclear Unit 1, Enclosure 7Finite Element Analysis
ML09308015930 September 2009Attachment 7, Browns Ferry Unit 1 - Technical Specification Change 467, ANP-2833NP, Revision 0, Mechanical Design Report, Reload BFE1-9 ATRIUM-10 Fuel AssembliesAnticipated operational occurrence
Power change
ML09308016030 June 2009Attachment 9, Browns Ferry Unit 1 - Technical Specification Change 467, ANP-2807(NP), Revision 0, Thermal Hydraulic Design Report for ATRIUM-10 Fuel AssembliesAnticipated operational occurrence
ML09308016131 August 2009Attachment 11, Browns Ferry Unit 1 - Technical Specification Change 467, ANP-2850(NP), Revision 0, Fuel Cycle Design ReportShutdown Margin
ML09310011930 September 2009Attachment 16, Browns Ferry Unit 1 -Technical Specification Change 467, 51-9121503-001, Revision 001, Engineering Information Record, Responses to NRC Comments Regarding Proposed Fuel Transition AmendmentMELLLA
ML09310012131 October 2009Attachment 19, Browns Ferry Unit 1 -Technical Specification Change 467, ANP-2638NP, Revision 2, Applicability of Areva Np BWR Methods to Extend Power Uprate ConditionsShutdown Margin
Minimum Critical Power Ratio
ML0931001233 September 2009Attachment 23, Browns Ferry Unit 1 - Technical Specification Change 467, 51-9121246-000, Revision 0, MCPR Safety Limit AnalysisAnticipated operational occurrence
Minimum Critical Power Ratio