Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20205K338 | 20 February 1986 | Rev 15 to Book II of Emergency Plan Procedures,Including Table of Contents & Rev 4 to IP-1017 Re Recommendation of Protective Actions for Offsite Population | Met Tower Earthquake Overexposure Potassium iodide |
ML20207H186 | 23 December 1986 | Revised Emergency Plan Implementing Procedures,Including Rev 14 to IP-1021, Radiological Medical Emergency & Rev 4 to IP-1056, Directing Fire Fighting Personnel in Controlled Area | Earthquake Potassium iodide |
ML20207S284 | 13 March 1987 | Revised Emergency Plan Implementing Procedures,Including Rev 3 to IP-1028, Core Damage Assessment, Rev 6 to IP-1041, Personnel Monitoring for Eof,Tsc.Osc & Control Room Personnel & Rev 12 to IP-1050, Accountability | Reactor Vessel Water Level Fuel cladding Siren |
ML20210G926 | 20 July 1999 | Proposed Tech Spec 3.2.1.i,revising Senior Reactor License Requirement for Operations Manager | |
ML20210P520 | 22 September 1986 | Revised Emergency Plan Implementing Procedure IP-1050, Accountability | |
ML20211H614 | 17 January 1999 | Rev 8 to Security Force Training & Qualification Plan, for Indian Point 3 Nuclear Power Plant | Contraband Job Performance Measure Safeguards Contingency Plan |
ML20215A080 | 26 November 1986 | Proposed Tech Specs,Incorporating Changes in Facility Organization Structure & Title Changes for Members of Station Nuclear Safety Committee | |
ML20236G490 | 27 July 1987 | Proposed Tech Specs,Deleting Section 3.2.6 & Adding Sections 4.1.7 & 4.1.8 Re Radiation Protection Requirements. Supporting Documentation Encl | High Radiation Area Locked High Radiation Area |
ML20245F844 | 25 July 1989 | Proposed License Conditions D & H,Reflecting Changes,Per Rev 10 to Physical Security Plan | Safe Shutdown Boric Acid Safeguards Contingency Plan |
ML20246H959 | 31 December 1978 | Qualification Tests of Electrical Cables in Simulated Steam-Line-Break & LOCA Environ | |
ML20246H987 | 30 April 1988 | Environ Qualification of Continental Wire & Cable Corp Instrumentation Cable Installed in Beaver Valley Power Station Unit 1 | |
ML20248B283 | 8 September 1989 | Cycle 7 Startup Physics Test Rept,Indian Point Unit 3 | |
ML20248L989 | 18 May 1998 | Rev 7 to, Security Force Training & Qualification Plan | Contraband Job Performance Measure |