Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20211L215 | 3 October 1997 | Safety Evaluation Supporting Licensee Relief Request,Per 10CFR50.55a(a)(3)(i) | Ultimate heat sink Design basis earthquake Earthquake |
ML20212A744 | 10 September 1999 | Safety Evaluation Concluding That Alternatives Contained in Relief Request 12R-07 Provide Acceptable Level of Quality & Safety | Hydrostatic VT-2 Incorporated by reference Finite Element Analysis Liquid penetrant |
ML20212H185 | 6 March 1998 | SE Approving Temporary Use of Current Procedure for Containment Repair & Replacement Activities Instead of Requirements in Amended 10CFR50.55a Rule | |
ML20214N720 | 9 September 1986 | Safety Evaluation Conditionally Supporting Rod Swap Technique & Util Nuclear Analysis Methods for Control Rod Worth Measurements | |
ML20214R548 | 26 November 1986 | Safety Evaluation Accepting Projected Values of Matl Properties for Fracture Toughness Requirements for Protection Against PTS Events | |
ML20215D734 | 1 October 1986 | Safety Evaluation Re Util 860623 Request That One Startup Test Be Modified & Five Startup Tests Be Eliminated.Mod to Rod Drop Measurement Test & Elimination of Certain Other Startup Tests Acceptable | |
ML20216F492 | 11 March 1998 | Correction to Safety Evaluation Re Revised SG Tube Rapture Analysis | |
ML20217C168 | 22 September 1997 | Safety Evaluation Accepting Request for Relief from ASME Code,Section Iii,Div 2 for Repair of Damaged Concrete Reinforcement Steel | |
ML20217G996 | 14 October 1999 | SER Accepting First 10-year Interval Inservice Insp Requests for Relief for Plant,Units 1 & | VT-2 Incorporated by reference |
ML20217K633 | 20 April 1998 | Safety Evaluation Accepting Methodology & Criteria Used in Generating Flaw Evaluation Charts for RPV of Braidwood IAW Section XI of ASME Code | |
ML20217K717 | 20 April 1998 | Safety Evaluation Accepting Requests for Relief NR-22,NR-23 & NR-24 for First 10-yr Insp Interval | VT-2 Incorporated by reference |
ML20236A785 | 15 January 1986 | Safety Evaluation Providing Risk Perspective of Util May 1983 Proposal to Change Tech Specs Re Allowed Outage Times from 3 to 7 Days for Nine Safety Sys,Including Charging, Safety Injection & RHR Pumps & Emergency Diesel Generators | Probabilistic Risk Assessment |
ML20236L200 | 30 October 1987 | Safety Evaluation Supporting Amends 11 to Licenses NPF-37 & NPF-66,respectively & Amend 1 to License NPF-72 | |
ML20237G856 | 10 August 1987 | SER on Util 870303 & 0522 Ltr Re Optpipe Computer Code Used in Snubber Reduction Program.Code Acceptable for Piping Dynamic Analysis Using Both Uniform & Independent Support Motion Response Spectrum | |
ML20238F328 | 31 August 1998 | SER Approving Second 10-year Interval Inservice Insp Program Request for Relief 12R-14 for Braidwood Station,Units 1 & 2 | |
ML20238F655 | 28 August 1998 | SE Authorizing Licensee Request for Relief NR-20,Rev 1 & NR-25,Rev 0 Re Relief from Examination Requirement of Applicable ASME BPV Code,Section XI for First ISI Interval Exams | VT-2 Incorporated by reference |
ML20244A722 | 11 April 1989 | Safety Evaluation Concluding That Rev 1 to First 10-yr Interval Inservice Insp Program Plan Constitutes Basis for Compliance w/10CFR50.55a & Tech Spec 4.0.5.Response to Items 2.2.2 & 2.2.3 of Inel Technical Evaluation Rept Requested | Incorporated by reference |
ML20244D819 | 13 June 1989 | SER Supporting Util ATWS Mitigating Sys Actuation Circuitry Designs | Anticipated operational occurrence |
ML20247B328 | 24 April 1989 | Safety Evaluation Re Mechanical Draft Cooling Tower Tests | Ultimate heat sink |
ML20247D147 | 18 July 1989 | SER Supporting Util Proposed Implementation of ATWS Design, Per 10CFR50.62 Requirements | Anticipated operational occurrence Loss of condenser vacuum |
ML20248D591 | 7 August 1989 | SER Accepting Util 881130,890411,27 & 0523 Submittals Re Seismic Qualification of Byron Deep Wells | Safe Shutdown Ultimate heat sink Earthquake |
NUREG-1335, Staff Evaluation Rept Concluding That Licensee IPE Complete Wrt Info Requested by GL 88-20 & Associated Guidance, NUREG-1335 | 28 August 1997 | Staff Evaluation Rept Concluding That Licensee IPE Complete Wrt Info Requested by GL 88-20 & Associated Guidance, NUREG-1335 | Internal Flooding |