PNO-III-87-048, on 870402,util Informed Region III That Some Licensed Operators May Not Have Attended All of Required Lectures of Requalification Program.Unit Will Not Restart, Pending Review of Program | 3 April 1987 | PNO-III-87-048:on 870402,util Informed Region III That Some Licensed Operators May Not Have Attended All of Required Lectures of Requalification Program.Unit Will Not Restart, Pending Review of Program | |
PNO-III-87-048A, on 870406-10,NRC Special Insp Concluded That All Licensed Reactor Operators,Currently on Shift,Duty Up to Date W/Util Operator Requalification Program.Addl Review of Past Requalification Program Will Be Conducted | 13 April 1987 | PNO-III-87-048A:on 870406-10,NRC Special Insp Concluded That All Licensed Reactor Operators,Currently on Shift,Duty Up to Date W/Util Operator Requalification Program.Addl Review of Past Requalification Program Will Be Conducted | |
PNO-III-87-055, on 870410-11,licensee Identified Several Steam Leaks in Main Steam Line & HPCI & RCIC Sys Declared Inoperable.Caused by Cracked Welds & Blown Fuse, Respectively.Reactor Shut Down for Steam Line Repairs | 13 April 1987 | PNO-III-87-055:on 870410-11,licensee Identified Several Steam Leaks in Main Steam Line & HPCI & RCIC Sys Declared Inoperable.Caused by Cracked Welds & Blown Fuse, Respectively.Reactor Shut Down for Steam Line Repairs | |
PNO-III-87-075, on 870521,licensee Shut Unit Down from 7% Power to Repair Valve Packing Leak Detected on 870520 in Rwcu.Source of Leak Determined & Valve Opened & Closed to Stop Leakage Through Packing | 22 May 1987 | PNO-III-87-075:on 870521,licensee Shut Unit Down from 7% Power to Repair Valve Packing Leak Detected on 870520 in Rwcu.Source of Leak Determined & Valve Opened & Closed to Stop Leakage Through Packing | Packing leak |
PNO-III-87-101, on 870726,licensee Received Bomb Threat from Caller Angry Because Place of Residence Lost Power During Storm.Security Personnel Notified & Search Procedures Implemented.No Bomb Discovered | 27 July 1987 | PNO-III-87-101:on 870726,licensee Received Bomb Threat from Caller Angry Because Place of Residence Lost Power During Storm.Security Personnel Notified & Search Procedures Implemented.No Bomb Discovered | |
PNO-III-87-103, on 870727,licensee Reduced Power to Approx 2% to Repair Feedwater Check Valve Which Was Leaking. Unusual Event Under Licensee Emergency Plan Was Declared,Due to Required Shutdown | 31 July 1987 | PNO-III-87-103:on 870727,licensee Reduced Power to Approx 2% to Repair Feedwater Check Valve Which Was Leaking. Unusual Event Under Licensee Emergency Plan Was Declared,Due to Required Shutdown | |
PNO-III-87-116, on 870831,maint Personnel Discovered Evidence of Pipe Movement & Damage to Pipe Hangers & Supports on Emergency Drain Lines.Cause Undetermined. Investigation Continuing.Unit in Maint Since 870731 | 3 September 1987 | PNO-III-87-116:on 870831,maint Personnel Discovered Evidence of Pipe Movement & Damage to Pipe Hangers & Supports on Emergency Drain Lines.Cause Undetermined. Investigation Continuing.Unit in Maint Since 870731 | |
PNO-III-87-116A, updates Discovery of Turbine Bldg Pipe Support Damage.Addl Damage to Feedwater Heater Emergency Drain Lines Identified.Cause Undetermined.Damage Under Evaluation & Repair Plans Developed | 8 September 1987 | PNO-III-87-116A:updates Discovery of Turbine Bldg Pipe Support Damage.Addl Damage to Feedwater Heater Emergency Drain Lines Identified.Cause Undetermined.Damage Under Evaluation & Repair Plans Developed | |
PNO-III-87-130, on 871006,loaded .25 Caliber Automatic Pistol Found During Search of tractor-trailer Delivering Empty Radwaste Container to Plant Protected Area.Individual Denied Site Access & Detained Until Arrival of Police | 6 October 1987 | PNO-III-87-130:on 871006,loaded .25 Caliber Automatic Pistol Found During Search of tractor-trailer Delivering Empty Radwaste Container to Plant Protected Area.Individual Denied Site Access & Detained Until Arrival of Police | |
PNO-III-87-133, on 871009,licensee Authorized to Resume Operations Following Maint Outage.Limitation of 50% Power Remains in Effect.Licensee Will Provide Monthly Repts on Status of Preventive Maint Program & Improvement Plans | 13 October 1987 | PNO-III-87-133:on 871009,licensee Authorized to Resume Operations Following Maint Outage.Limitation of 50% Power Remains in Effect.Licensee Will Provide Monthly Repts on Status of Preventive Maint Program & Improvement Plans | |
PNO-III-88-001, on 871231,reactor Scrammed from 75% Power as Result of High Water Level in Reactor,Caused by Personnel Error During Installation of Auxiliary Computer Intended to Monitor Feedwater Heater Temp | 4 January 1988 | PNO-III-88-001:on 871231,reactor Scrammed from 75% Power as Result of High Water Level in Reactor,Caused by Personnel Error During Installation of Auxiliary Computer Intended to Monitor Feedwater Heater Temp | |
PNO-III-88-002, on 880111,reactor Tripped & HPCI & RCIC Sys Triggered Automatically Due to Trip of One Reactor Feedwater Pump.Caused by Feedwater Control Sys Power Supply Failure. Power Supply Replaced | 11 January 1988 | PNO-III-88-002:on 880111,reactor Tripped & HPCI & RCIC Sys Triggered Automatically Due to Trip of One Reactor Feedwater Pump.Caused by Feedwater Control Sys Power Supply Failure. Power Supply Replaced | |
PNO-III-88-003, on 880115,regional Administrator Authorized Licensee to Exceed 75% for First Time & Proceed Up to 100% Power.On 880116,licensee Began Increasing Power But Encountered Vibration Problems on Two Main Steam Lines | 20 January 1988 | PNO-III-88-003:on 880115,regional Administrator Authorized Licensee to Exceed 75% for First Time & Proceed Up to 100% Power.On 880116,licensee Began Increasing Power But Encountered Vibration Problems on Two Main Steam Lines | |
PNO-III-88-014, on 880226,portion of Automatic Start Circuitry for Plant Four Diesel Generators Not Fully Tested. Unusual Event Classification Terminated on 880227 Following Manual Reactor Scram.Maint & Testing Outage Begun | 29 February 1988 | PNO-III-88-014:on 880226,portion of Automatic Start Circuitry for Plant Four Diesel Generators Not Fully Tested. Unusual Event Classification Terminated on 880227 Following Manual Reactor Scram.Maint & Testing Outage Begun | |
PNO-III-88-019, on 880306,weapon Incident Involving Security Guard Occurred When During Verbal Confrontation One Security Guard Pointed Handgun at Second Guard.Individual Suspended & State of Mi Notified | 10 March 1988 | PNO-III-88-019:on 880306,weapon Incident Involving Security Guard Occurred When During Verbal Confrontation One Security Guard Pointed Handgun at Second Guard.Individual Suspended & State of Mi Notified | |
PNO-III-88-022, on 880318,received Bomb Threat Possibly Originating on Site.Site Access Restricted to Essential Personnel & Search of Facility Begun.No Explosive Devices Found & No Explosions Occurred.Investigation Continuing | 18 March 1988 | PNO-III-88-022:on 880318,received Bomb Threat Possibly Originating on Site.Site Access Restricted to Essential Personnel & Search of Facility Begun.No Explosive Devices Found & No Explosions Occurred.Investigation Continuing | |
PNO-III-88-052, on 880528,water Hammer in RWCU Sys Damaged Fitting on 5/8 Inch Instrument Line & Caused Leak of Steam & Water Into RWCU Sys Pump Room.Caused by Water Hammer. Instrument Line Repaired | 1 June 1988 | PNO-III-88-052:on 880528,water Hammer in RWCU Sys Damaged Fitting on 5/8 Inch Instrument Line & Caused Leak of Steam & Water Into RWCU Sys Pump Room.Caused by Water Hammer. Instrument Line Repaired | |
PNO-III-88-064, on 880713,pressure Transient in RWCU Sys Caused Compression Fitting on Instrument Line to Separate, Releasing Water & Steam Contaminated W/Radioactivity in Reactor Bldg.Caused by Failed Fitting.Damaged Line Isolated | 15 July 1988 | PNO-III-88-064:on 880713,pressure Transient in RWCU Sys Caused Compression Fitting on Instrument Line to Separate, Releasing Water & Steam Contaminated W/Radioactivity in Reactor Bldg.Caused by Failed Fitting.Damaged Line Isolated | |
PNO-III-88-065, on 880723,unidentified Drywell Leakage Forces Shutdown.Leakage Believed Coming from RCIC Inboard Steam Isolation Valve & Two Valves in Reactor Water Cleanup Sys. Repairs,Maint & Insp Activities Planned | 25 July 1988 | PNO-III-88-065:on 880723,unidentified Drywell Leakage Forces Shutdown.Leakage Believed Coming from RCIC Inboard Steam Isolation Valve & Two Valves in Reactor Water Cleanup Sys. Repairs,Maint & Insp Activities Planned | |
PNO-III-88-071, on 880809,brick Thrown Through Windshield of Contractor Vehicle & Driver Assaulted by Picketers.Incident Being Investigated by Monroe County Sheriff Dept.State Will Be Informed | 9 August 1988 | PNO-III-88-071:on 880809,brick Thrown Through Windshield of Contractor Vehicle & Driver Assaulted by Picketers.Incident Being Investigated by Monroe County Sheriff Dept.State Will Be Informed | |
PNO-III-89-028, on 890417,fire Occurred in Ofc Switchgear in Room in Bldg within Plant Protected Area.Fire Extinguished. Local Fire Marshall Investigating Incident & Extent of Damage | 18 April 1989 | PNO-III-89-028:on 890417,fire Occurred in Ofc Switchgear in Room in Bldg within Plant Protected Area.Fire Extinguished. Local Fire Marshall Investigating Incident & Extent of Damage | |
PNO-III-89-063, on 890922,picketers Protested Licensee Use of Nonbldg Trade Union Personnel to Perform Insp & Maint Work During Outage by Disrupting Outage Contractor Traffic from Entering Gate.Two Arrests Made by County Sheriff Dept | 22 September 1989 | PNO-III-89-063:on 890922,picketers Protested Licensee Use of Nonbldg Trade Union Personnel to Perform Insp & Maint Work During Outage by Disrupting Outage Contractor Traffic from Entering Gate.Two Arrests Made by County Sheriff Dept | |
PNO-III-90-026, on 900410,reactor Scrammed When Inboard MSIVs Began to Drift Shut Because of Loss of Pressure in Containment Pneumatic Nitrogen Sys | 10 April 1990 | PNO-III-90-026:on 900410,reactor Scrammed When Inboard MSIVs Began to Drift Shut Because of Loss of Pressure in Containment Pneumatic Nitrogen Sys | |
PNO-III-90-040, on 900620,positive Result from Drug Test Administered to Reactor Operator Reported During Routine Annual Physical Exam.Individual Unescorted Site Access Terminated & Referred to Employee Assistance Program | 21 June 1990 | PNO-III-90-040:on 900620,positive Result from Drug Test Administered to Reactor Operator Reported During Routine Annual Physical Exam.Individual Unescorted Site Access Terminated & Referred to Employee Assistance Program | |
PNO-III-90-072, on 901018,engineer Killed During Testing on Reactor Bldg Supply Fan.Investigation Continuing | 19 October 1990 | PNO-III-90-072:on 901018,engineer Killed During Testing on Reactor Bldg Supply Fan.Investigation Continuing | |
PNO-III-93-069A, on 931228,Region III Issued CAL to Licensee Documenting Licensee Agreement to Submit Investigation Plan to NRC for Review Re Update of Extended Shutdown of Facility Due to Failure of low-pressure Turbine | 30 December 1993 | PNO-III-93-069A on 931228,Region III Issued CAL to Licensee Documenting Licensee Agreement to Submit Investigation Plan to NRC for Review Re Update of Extended Shutdown of Facility Due to Failure of low-pressure Turbine | |
PNO-III-94-010, on 940216,licensee Announced Plan to Release Up to 1.5 Million Gals of Slightly Contaminated Water from Plant.Water Associated w/931225 Turbine Accident at Plant | 16 February 1994 | PNO-III-94-010:on 940216,licensee Announced Plan to Release Up to 1.5 Million Gals of Slightly Contaminated Water from Plant.Water Associated w/931225 Turbine Accident at Plant | |
PNO-III-94-078, on 941002,planned anti-nuclear Demonstration Held on Public Highways at Road Intersections Leading to Access Roads & owner-controlled Area Gates to Plant.Media Covered Event.State of Mi Informed | 3 October 1994 | PNO-III-94-078:on 941002,planned anti-nuclear Demonstration Held on Public Highways at Road Intersections Leading to Access Roads & owner-controlled Area Gates to Plant.Media Covered Event.State of Mi Informed | |
PNO-III-94-090, on 941219,reactor Operators Began Startup of Plant 2 Reactor Following Recovery from Turbine Generator Failure & Fire on 931225 | 20 December 1994 | PNO-III-94-090:on 941219,reactor Operators Began Startup of Plant 2 Reactor Following Recovery from Turbine Generator Failure & Fire on 931225 | Shutdown Margin |
PNO-III-98-015, on 980201,reactor Scrammed from 96% Power Following Trip of Main Turbine.Main Turbine Trip Resulted from Main Generator Load Rejection Protective Signal. Investigation Continuing | 4 February 1998 | PNO-III-98-015:on 980201,reactor Scrammed from 96% Power Following Trip of Main Turbine.Main Turbine Trip Resulted from Main Generator Load Rejection Protective Signal. Investigation Continuing | |
PNO-III-98-048, on 981008,Detroit Edison Declared Alert Based on Operator Rept of Smoke & Fire Alarm Coming from EDG 12 Control Panel in Switchgear Room.Operator Tripped EDG 12, Opened Output Breaker & Left Switchgear Room | 21 October 1998 | PNO-III-98-048:on 981008,Detroit Edison Declared Alert Based on Operator Rept of Smoke & Fire Alarm Coming from EDG 12 Control Panel in Switchgear Room.Operator Tripped EDG 12, Opened Output Breaker & Left Switchgear Room | Safe Shutdown |
PNO-III-98-055, on 981113,licensee Shut Unit Down to Repair Steam Leak from Reactor Feedwater Check Valve.Valve Is SR & Would Provide Containment Isolation Function Under Accident Conditions | 13 November 1998 | PNO-III-98-055:on 981113,licensee Shut Unit Down to Repair Steam Leak from Reactor Feedwater Check Valve.Valve Is SR & Would Provide Containment Isolation Function Under Accident Conditions |