IR 05000302/2011003 | 19 July 2011 | Crystal River | IR 05000302-11-003, on 04/01/2011-06/30/2011; Crystal River Unit 3; Routine Integrated Report |
IR 05000324/1998006 | 6 July 1998 | Brunswick | Insp Repts 50-324/98-06 & 50-325/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support |
IR 05000324/1998007 | 11 August 1998 | Brunswick | Insp Repts 50-324/98-07 & 50-325/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support |
IR 05000324/2009002 | 30 April 2009 | Brunswick 07200006 | IR 05000325-09-002, 05000324-09-002, & 07200006-09-001; Carolina Power and Light; 01/01/2009 - 03/31/2009; Brunswick Steam Electric Plant, Units 1 & 2, Brunswick Independent Spent Fuel Storage Installation, NRC Integrating Inspection Report |
IR 05000324/2013008 | 15 April 2013 | Brunswick | IR 05000324-13-008; March 11 - 15, 2013; Brunswick Steam Electric Plant, Unit 2; Post- Approval Site Inspection for License Renewal, Phase 1 |
IR 05000324/2015003 | 6 November 2015 | Brunswick | IR 05000324/2015003 and 05000325/2015003; July 1, 2015 Through September 30, 2015; Brunswick Steam Electric Plant; NRC Integrated Inspection Report and Exercise of Enforcement Discretion |
IR 05000324/2018003 | 2 November 2018 | Brunswick | NRC Integrated Inspection Report 05000325/2018003 and 05000324/2018003; 05000325/2018502 and 05000324/2018502 |
IR 05000324/2022003 | 7 November 2022 | Brunswick | Integrated Inspection Report 05000324/2022003 and 05000325/2022003 |
IR 05000325/2013008 | 15 April 2013 | Brunswick | IR 05000324-13-008; March 11 - 15, 2013; Brunswick Steam Electric Plant, Unit 2; Post- Approval Site Inspection for License Renewal, Phase 1 |
IR 05000369/1982017 | 11 June 1982 | Mcguire McGuire | IE Insp Repts 50-369/82-17 & 50-370/82-12 on 820417-0515. Noncompliance Noted:Failure to Comply W/Housekeeping & Cleanliness Requirements |
IR 05000369/1985044 | 22 January 1986 | Mcguire McGuire | Insp Repts 50-369/85-44 & 50-370/85-45 on 851216-20. Violation Noted:Failure to Perform Weekly Radiological Surveys |
IR 05000369/1987019 | 2 July 1987 | Mcguire McGuire | Insp Repts 50-369/87-19 & 50-370/87-19 on 870521-0620.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint activities,follow-up of Previous Enforcement Actions,Refueling & Design Change Activities |
IR 05000369/1987023 | 7 August 1987 | Mcguire McGuire | Insp Repts 50-369/87-23 & 50-370/87-23 on 870720-21.No Violations or Deviations Noted.Major Areas Inspected:Plant Chemistry |
IR 05000369/1988016 | 26 July 1988 | Mcguire McGuire | Insp Repts 50-369/88-16 & 50-370/88-16 on 880620-24.No Violations or Deviations Noted.Major Areas Inspected: Occupational Exposure During Extended Outages |
IR 05000369/1989007 | 17 April 1989 | Mcguire McGuire | Insp Repts 50-369/89-07 & 50-370/89-07 on 890320-24.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp,Including Review of Procedures,Observation of Work Activities & Evaluation of Eddy Current Testing |
IR 05000369/1989008 | 6 April 1989 | Mcguire McGuire | Insp Repts 50-369/89-08 & 50-370/89-08 on 890327-31.No Violations Noted.Major Areas Inspected:Steam Generator Tubing Eddy Current Exam & Activities Associated W/Unit 1 Steam Generator B Ruptured Tube |
IR 05000369/1989026 | 30 August 1989 | Mcguire McGuire | Insp Repts 50-369/89-26 & 50-370/89-26 on 890807-11.No Violations or Deviations Noted.Major Areas Inspected:Plant Chemistry,Previously Identified Items & Status of Steam Generator Blowdown Recycle Sys |
IR 05000369/1993012 | 2 September 1993 | Mcguire McGuire | Insp Repts 50-369/93-12 & 50-370/93-12 on 930719-23 & 0802- 06.No Violations or Deviations Noted.Major Areas Inspected: Unit 2 10-yr ISI of Rpv,Eddy Current Exam of SGs & Ultrasonic Exam of FW Nozzles & Related Piping Welds |
IR 05000369/1997015 | 20 October 1997 | Mcguire McGuire | Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support |
IR 05000369/2004004 | 9 July 2004 | Mcguire McGuire | IR 05000369-04-004 & 05000370-04-004, on 03/14/04 Through 06/12/04, for McGuire Nuclear Station Units 1 & 3; Fire Protection, Maintenance Effectiveness, Surveillance Testing, Access Control to Radiologically Significant Area & ALARA Plannin |
IR 05000369/2005002 | 28 April 2005 | Mcguire McGuire | IR 05000369-05-002, IR 05000370-05-002, and IR 07200038-05-001, on 01/01/2005 - 03/31/2005 for McGuire, Units 1 and 2; Operability Evaluations, Surveillance Testing, Access Controls to Radiologically Significant Areas, Radiation Monitoring. |
IR 05000369/2005003 | 22 July 2005 | Mcguire McGuire | IR 05000369-05-03 and IR 05000370-05-03, on 04/01/2005 - 06/30/2005, McGuire Nuclear Station, Units 1 and 2; Fire Protection and Other Activities |
IR 05000369/2007003 | 24 July 2007 | Mcguire McGuire | IR 05000369-07-003, 05000370-07-003, on 04/01/2007 - 06/30/2007; McGuire Nuclear Station, Units 1 and 2; Routine Integrated Report |
IR 05000369/2009003 | 30 July 2009 | Mcguire McGuire | IR 05000369-09-003, 05000370-09-003 on 04/01/2009 - 06/30/2009 for McGuire, Units 1 & 2, Integrated Inspection |
IR 05000369/2009004 | 29 October 2009 | Mcguire McGuire | IR 05000369-09-004 05000370-09-004; on 7/1/2009 - 9/30/2009; McGuire Nuclear Station, Surveillance Testing, and Radiation Monitoring Instrumentation and Protective Equipment |
IR 05000369/2010002 | 28 April 2010 | Mcguire McGuire | IR 05000369-10-002, IR 05000370-10-002; 1/1/2010 - 03/31/2010: McGuire Nuclear Station, Fire Protection, Plant Modifications, Event Follow-Up |
IR 05000369/2010003 | 26 July 2010 | Mcguire McGuire | IR 05000369-10-003 and 05000370-10-003, on 04/01/10 - 06/30/10; McGuire Nuclear Station Maintenance Risk Assessment, Radiological Hazard Assessment and Exposure Controls |
IR 05000369/2011002 | 6 May 2011 | Mcguire McGuire | IR 05000369-11-002, 05000370-11-002, on 1/1/2011 - 3/31/2011, McGuire Nuclear Station, Licensed Operator Requalification Program, Follow-up of Events and Notices of Enforcement Discretion |
IR 05000369/2012002 | 26 April 2012 | Mcguire McGuire | IR 05000369-12-002 and 05000370-12-002; Duke Energy Carolinas, LLC; 01/01/2012 - 03/31/2012; McGuire Nuclear Station, Units 1 and 2, NRC Integrated Inspection Report |
IR 05000369/2012005 | 25 January 2013 | Mcguire McGuire | IR 05000369-12-005, 05000370-12-005, 05000369-12-502, 05000370-12-502; 10/01/2012 - 12/31/2012; McGuire Nuclear Station, Units 1 and 2; Fire Protection |
IR 05000369/2014005 | 3 February 2015 | Mcguire McGuire | IR 05000369/2014005, IR 05000370/2014005; 10/01/2014 - 12/31/2014; McGuire Nuclear Station, Units 1 and 2; Fire Protection and Refueling and Other Outage Activities |
IR 05000369/2016002 | 22 July 2016 | Mcguire McGuire | NRC Integrated Inspection Report 05000369/2016002 and 05000379/2016002 |
IR 05000369/2020012 | 31 July 2020 | Mcguire McGuire | NRC Post-Approval Site Inspection for License Renewal, Inspection Report 05000369/2020012 and 05000370/2020012 |
IR 05000400/2004004 | 26 July 2004 | Harris | IR 05000400-04-004 on 03/28/2004 - 06/26/2004 for Shearon Harris, Unit 1; Inservice Inspection |
IR 05000400/2007007 | 10 September 2007 | Harris | IR 05000400-07-007 on 07/09/2007 - 07/27/2007, Shearon Harris Nuclear Power Plant, Unit 1, License Renewal Inspection Program, Aging Management Program |
IR 05000400/2010003 | 22 July 2010 | Harris | IR 05000400-10-003, Carolina Power and Light Company; April 1, 2010 - June 30, 2010; Shearon Harris Nuclear Power Plant, Unit 1; Post Maintenance Testing, and Event Follow-up |
IR 05000400/2010005 | 28 January 2011 | Harris | IR 05000400-10-005; October 1, 2010 - December 31, 2010; Shearon Harris Nuclear Power Plant, Unit 1; Equipment Alignment, Maintenance Effectiveness, Plant Modifications, Post-Maintenance Testing, Surveillance Testing |
IR 05000400/2013003 | 1 August 2013 | Harris | IR 05000400-13-003, Carolina Power and Light Company on April 1, 2013 June 30, 2013, Shearon Harris Nuclear Power Plant, Unit 1, Equipment Alignment |
IR 05000400/2015002 | 29 July 2015 | Harris | IR 05000400/2015002; April 1, 2015, - June 30, 2015; Shearon Harris Nuclear Power Plant, Unit 1, Operability Determinations and Functionality Assessments, Plant Modifications |
IR 05000400/2016002 | 27 July 2016 | Harris | NRC Integrated Inspection Report 05000400/2016002, April 1, 2016 Through June 30, 2016 |
IR 05000400/2019002 | 5 August 2019 | Harris | Nuclear Regulatory Commission Integrated Inspection Report 05000400/2019002 |
IR 05000400/2019004 | 6 February 2020 | Harris | Integrated Inspection Report 05000400/2019004 |
IR 05000413/1986032 | 9 September 1986 | Catawba | Insp Repts 50-413/86-32 & 50-414/86-35 on 860811-15.No Violations or Deviations Noted.Major Areas Inspected:Plant Chemistry |
IR 05000413/1988008 | 8 March 1988 | Catawba | Insp Repts 50-413/88-08 & 50-414/88-08 on 880126-0225. Violations Noted.Major Areas Inspected:Surveillance Observation,Maint,Review of Licensee Nonroutine Event Repts & Followup of Previously Identified Items |
IR 05000413/1988009 | 26 May 1988 | Catawba | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-413/88-09 & 50-414/88-09.Disagrees W/Util Assessment That Measures Were Adequate to Control Eddy Current Testing of Tubes |
IR 05000413/1988012 | 4 April 1988 | Catawba | Insp Repts 50-413/88-12 & 50-414/88-12 on 880222-26. Violation Noted.Major Areas Inspected:Radiation Protection Area of Unit 2 Outage,Including Audits,Surveillances, Planning,Preparation,Training,Qualification & IE Notices |
IR 05000413/1988032 | 12 September 1988 | Catawba | Insp Repts 50-413/88-32 & 50-414/88-32 on 880815-19.No Violations Noted.Major Areas Inspected:Steam Generator Tube Leak,Integral Simulation Test of Pumps & Valves,Temporary Instruction & Action on Previous Insp Findings |
IR 05000413/1989018 | 11 August 1989 | Catawba | Insp Repts 50-413/89-18 & 50-414/89-18 on 890717-21. Violation Re Turbine Bldg Sump Analyses Noted But Not Cited. Major Areas Inspected:Chemistry,Liquid Waste Controls & Previously Identified Inspector Followup Items |
IR 05000413/1992027 | 23 November 1992 | Catawba | Insp Repts 50-413/92-27 & 50-414/92-27 on 921011-1107.No Violations Noted.Major Areas Inspected:Plant Operations & Standy Makeup Pump Operability Verification & Review |