Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
05000271/FIN-2010008-01 | Fire Scenario Resulting in Loss of Reactor Core Isolation Cooling System | |
05000271/LER-2011-001 | Inoperability of High Pressure Coolant Injection System due to Failure to Follow Procedures | |
BVY 04-008, Vermont Yankee July 2008 Evidentiary Hearing - Staff Exhibit 17, Letter Bvy 04-008, Dated January 31, 2004 | 31 January 2004 | Vermont Yankee July 2008 Evidentiary Hearing - Staff Exhibit 17, Letter Bvy 04-008, Dated January 31, 2004 |
BVY 04-058, 2008-08/12-Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E3-04-VY Attachment 2 to Supplement 8 to VY EPU Application | 12 August 2008 | 2008-08/12-Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E3-04-VY Attachment 2 to Supplement 8 to VY EPU Application |
BVY 04-106, Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 18 Extended Power Uprate - ECCS Pump Net Positive Suction Head Margin | 5 October 2004 | Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 18 Extended Power Uprate - ECCS Pump Net Positive Suction Head Margin |
BVY 04-109, Vermont Yankee Nuclear Power Station - Technical Specification Proposed Change No. 263 - Supplement No. 19 Extended Power Uprate - Initial Plant Test Program | 7 October 2004 | Vermont Yankee Nuclear Power Station - Technical Specification Proposed Change No. 263 - Supplement No. 19 Extended Power Uprate - Initial Plant Test Program |
BVY 04-117, Emergency Response Data System (ERDS) Data Point Library Update | 26 October 2004 | Emergency Response Data System (ERDS) Data Point Library Update |
BVY 05-017, Vermont Yankee Hearing - Staff Exhibit 9, Letter from Jay K. Thayer to NRC Document Control Desk Transmitting Supplement No. 23 to Entergy'S Extended Power Uprate Application - Response to Request for Additional Information | 24 February 2005 | Vermont Yankee Hearing - Staff Exhibit 9, Letter from Jay K. Thayer to NRC Document Control Desk Transmitting Supplement No. 23 to Entergy'S Extended Power Uprate Application - Response to Request for Additional Information |
BVY 05-046, Vermont Yankee Hearing - Staff Exhibit 10, Letter from Jay K. Thayer to Document Control Desk Transmitting Supplement No. 28 to Entergy'S Extended Power Uprate Application - Response to Request for Additional Information | 22 April 2005 | Vermont Yankee Hearing - Staff Exhibit 10, Letter from Jay K. Thayer to Document Control Desk Transmitting Supplement No. 28 to Entergy'S Extended Power Uprate Application - Response to Request for Additional Information |
BVY 08-001, Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications | 12 February 2008 | Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications |
BVY 08-062, Technical Specifications Proposed Change No. 273, Supplement 2, Response to Request for Additional Information | 15 September 2008 | Technical Specifications Proposed Change No. 273, Supplement 2, Response to Request for Additional Information |
BVY 08-071, Nine-Month Response to Generic Letter 2008-01 | 14 October 2008 | Nine-Month Response to Generic Letter 2008-01 |
BVY 08-075, Technical Specifications Proposed Change No. 273, Supplement 4, Response to Request for Additional Information Related to Supplement 2 | 15 December 2008 | Technical Specifications Proposed Change No. 273, Supplement 4, Response to Request for Additional Information Related to Supplement 2 |
BVY 09-009, Technical Specifications Proposed Change No. 273, Supplement 7 Response to Request for Additional Information | 9 April 2009 | Technical Specifications Proposed Change No. 273, Supplement 7 Response to Request for Additional Information |
BVY 09-035, Technical Specifications Proposed Change No. 273, Supplement 8, Transmittal of Final Technical Specification Pages | 20 May 2009 | Technical Specifications Proposed Change No. 273, Supplement 8, Transmittal of Final Technical Specification Pages |
BVY 09-072, Technical Specification Bases Pages Associated with License Amendment 236 | 9 December 2009 | Technical Specification Bases Pages Associated with License Amendment 236 |
BVY 10-059, Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool | 8 November 2010 | Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool |
BVY 11-068, Revision of Technical Specification Bases Pages Due to License Amendment 248 | 30 September 2011 | Revision of Technical Specification Bases Pages Due to License Amendment 248 |
BVY 12-018, Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change | 17 April 2012 | Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change |
BVY 13-008, Inservice Testing Program Plan for the Fifth Ten-Year Interval | 1 February 2013 | Inservice Testing Program Plan for the Fifth Ten-Year Interval |
BVY 13-043, Technical Specifications Proposed Change No. 304, Revision to Low Pressure Safety Limit | 14 May 2013 | Technical Specifications Proposed Change No. 304, Revision to Low Pressure Safety Limit |
BVY 13-062, Revised of Technical Specification Bases Pages | 26 June 2013 | Revised of Technical Specification Bases Pages |
BVY 14-010, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition | 28 March 2014 | Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition |
BVY 14-036, Response to Request for Additional Information on Technical Specifications Proposed Change No. 306, Eliminate Certain ESF Requirements During Movement of Irradiated Fuel - Supplement 1 | 9 June 2014 | Response to Request for Additional Information on Technical Specifications Proposed Change No. 306, Eliminate Certain ESF Requirements During Movement of Irradiated Fuel - Supplement 1 |
BVY 14-037, Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 2 | 9 June 2014 | Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 2 |
BVY 14-078, Post Shutdown Decommissioning Activities Report and Site Site Specific Decommissioning Cost Estimate | 19 December 2014 | Post Shutdown Decommissioning Activities Report and Site Site Specific Decommissioning Cost Estimate |
BVY 15-024, Revision of Technical Specifications Bases Pages | 25 March 2015 | Revision of Technical Specifications Bases Pages |
BVY-92-103, Forwards Revised Survey & Data Point Library Ref File, Containing Hardware,Communications,Data Point & Administrative Info,As Part of ERDS | 31 August 1992 | Forwards Revised Survey & Data Point Library Ref File, Containing Hardware,Communications,Data Point & Administrative Info,As Part of ERDS |
BVY-92-117, Responds to GL 92-04, Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs Pursuant to 10CFR50.54(f) | 28 September 1992 | Responds to GL 92-04, Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs Pursuant to 10CFR50.54(f) |
BVY-93-123, Responds to Hardware Mod Requested in Ieb 93-003, Resolution of Issues Re Reactor Vessel Water Level Instrumentation in Bwrs | 8 November 1993 | Responds to Hardware Mod Requested in Ieb 93-003, Resolution of Issues Re Reactor Vessel Water Level Instrumentation in Bwrs |
ENS 40827 | Unusual Event Declared Due to a Main Transformer Fire Lasting Fire Longer than 10 Minutes. | |
ENS 41868 | Automatic Reactor Trip Caused by Failure in Switchyard | |
ENS 43610 | Automatic Reactor Scram on Turbine Stop Valve Closure | |
FVY-84-144, Responds to Request for Info Re Generic Ltr 84-23 on Reactor Vessel Water Level Instrumentation.Detailed Engineering Analysis of Water Level Measurement Sys Complete.Analysis Focused on Listed Areas | 6 December 1984 | Responds to Request for Info Re Generic Ltr 84-23 on Reactor Vessel Water Level Instrumentation.Detailed Engineering Analysis of Water Level Measurement Sys Complete.Analysis Focused on Listed Areas |
FVY-87-117, Application for Amend to License DPR-28,consisting of Proposed Change 143,revising Tech Spec Pages 39,53,61,65 & 67 to Address Addition of Equipment to Automatic Depressurization Sys.Fee Paid | 9 December 1987 | Application for Amend to License DPR-28,consisting of Proposed Change 143,revising Tech Spec Pages 39,53,61,65 & 67 to Address Addition of Equipment to Automatic Depressurization Sys.Fee Paid |
IR 05000271/1985034 | 26 November 1985 | Insp Rept 50-271/85-34 on 851028-1101.No Violation Noted. Major Areas Inspected:Surveillance Testing & Calibr Control Program,Startup Testing of Modified Sys & Licensee Actions on Previous NRC Findings |
IR 05000271/1987009 | 23 June 1987 | Insp Rept 50-271/87-09 on 870407-0601.No Violations Noted. Major Areas Inspected:Physical Security,Plant Operations, Maint Activities & Fuel Handling Activities.Recurrent Problem in Low Level Radioactive Matl Control Noted |
IR 05000271/1987016 | 25 February 1988 | Insp Rept 50-271/87-16 on 870801-1030.Violations Noted. Major Areas Inspected:Licensee Action on Previous Insp Findings,Outage Mgt,Operational Safety Verification,Physical Security Observations,Fitness for Duty Program & LERs |
IR 05000271/1988002 | 26 February 1988 | Insp Rept 50-271/88-02 on 880201-05.No Violations or Deviations Noted.Major Areas Inspected:Radiological Controls,Including Control of Radioactive Matls,Respiratory Protection & External Exposure Controls |
IR 05000271/1988008 | 8 July 1988 | Insp Rept 50-271/88-08 on 880517-0630.No Violations Noted. Major Areas Inspected:Actions on Previous Insp Findings, Operational Safety,Security,Plant Operations,Maint & Surveillance,Engineering Support & Radiological Controls |
IR 05000271/1988013 | 3 October 1988 | Insp Rept 50-271/88-13 on 880830-0901.No Violations Noted. Major Areas Inspected:Annual Emergency Preparedness Exercise Conducted on 880831 |
IR 05000271/1989002 | 4 May 1989 | Insp Rept 50-271/89-02 on 890214-0417.No Violations Noted. Major Areas Inspected:Actions on Previous Insp Findings, Operational Safety,Security,Plant Operations,Maint, Surveillance & Engineering Support |
IR 05000271/1993030 | 3 January 1994 | Insp Rept 50-271/93-30 on Stated Dates.No Violations Noted.Major Areas Inspected:Licensee Mgt Control Program in Area of Design Change & Mods,Technical Adequacy of Design Changes & Progress in SE Improvement Program |
IR 05000271/1996009 | 2 December 1996 | Insp Rept 50-271/96-09 on 960901-1019.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support |
IR 05000271/1998009 | 10 July 1998 | Insp Rept 50-271/98-09 on 980609-19.Violations Noted.Major Areas Inspected:Personnel Actions & Equipment Response Associated w/980609 Event,In Which There Was Rv High Level Water Level Turbine Trip & Reactor Scram |
IR 05000271/2006007 | 29 September 2006 | IR 05000271-06-007; Entergy Nuclear Vermont Yankee, LLC; 07/10/2006 - 08/17/2006; Vermont Yankee Power Station; Component Design Bases Inspection |
IR 05000271/2010003 | 29 July 2010 | IR 05000271-10-003, on 04/01/2010 - 06/30/2010; Vermont Yankee Nuclear Power Station; Refueling and Other Outage Activities |
IR 05000271/2010008 | 8 November 2010 | IR 05000271-10-008; 09/13/2010 - 10101/2010; Vermont Yankee Nuclear Power Station; Triennial Fire Protection Team Inspection |
IR 05000271/2014002 | 8 May 2014 | IR 05000271-14-002; 01/01/2014 - 03/31/2014; Vermont Yankee Nuclear Power Station; Maintenance Effectiveness |
Information Notice 1990-22, Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units | 23 March 1990 | Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units |