Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000335/200800718 April 2008IR 05000335-08-007, IR 05000389-08-007, and IR 07200061-08-001, on 02/25/2008 - 03/14/2008, for St. Lucie, Units 1 and 2, and ISFSI, Inspector Notes
IR 05000335/20100093 November 2010IR 05000335-10-009; 9/27/2010-9/30/2010; St. Lucie Nuclear Plant, Unit 1; Supplemental Inspection - Inspection Procedure (IP) 95002
L-2004-029, Supplemental Information to Spent Fuel Pool Cask Pit Rack Amendments3 February 2004Supplemental Information to Spent Fuel Pool Cask Pit Rack Amendments
L-2004-109, Supplemental Response Following SL1-19 Refueling Outage Generic Letter 96-06 Waterhammer Issues25 May 2004Supplemental Response Following SL1-19 Refueling Outage Generic Letter 96-06 Waterhammer Issues
L-2011-493, Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request23 November 2011Response to NRC Reactor Systems Branch and Nuclear Performance Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request
L-2012-158, Supplemental Response to NRC Mechanical and Civil Engineering Branch (Emcb) Regarding Extended Power Uprate License Amendment Request19 April 2012Supplemental Response to NRC Mechanical and Civil Engineering Branch (Emcb) Regarding Extended Power Uprate License Amendment Request
L-2012-361, Report of 10 CFR 50.59 Plant Changes1 October 2012Report of 10 CFR 50.59 Plant Changes
L-2012-427, Q4116-R-002, Rev. 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Force Recommendation 2.3: Seismic30 November 2012Q4116-R-002, Rev. 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Force Recommendation 2.3: Seismic
L-2012-428, FPL060-PR-001, Rev. 0, Flooding Walkdown Report, in Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Flooding26 November 2012FPL060-PR-001, Rev. 0, Flooding Walkdown Report, in Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Flooding
L-2013-084, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events28 February 2013Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
L-2013-099, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)22 March 2013Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition)
L-2013-175, Report of 10 CFR 50.59 Plant Changes23 May 2013Report of 10 CFR 50.59 Plant Changes
L-2015-048, to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Cover Page to Page 1096 February 2015to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Cover Page to Page 109
L-2015-297, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated Plan10 December 2015Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated Plan
L-2016-173, License Amendment Request - Radiation Monitor Changes16 September 2016License Amendment Request - Radiation Monitor Changes
L-2017-074, Redacted - St. Lucie, Unit 1, Updated Final Safety Analysis Report, Amendment No. 28, Chapter 10, Steam and Power Conversion System3 May 2017Redacted - St. Lucie, Unit 1, Updated Final Safety Analysis Report, Amendment No. 28, Chapter 10, Steam and Power Conversion System
L-2017-074, Redacted - St. Lucie, Unit 1, Updated Final Safety Analysis Report, Amendment No. 28, Chapter 6, Engineered Safety Features3 May 2017Redacted - St. Lucie, Unit 1, Updated Final Safety Analysis Report, Amendment No. 28, Chapter 6, Engineered Safety Features
L-2017-074, St. Lucie, Unit 1, Updated Final Safety Analysis Report, Amendment No. 28, Chapter 1, Introduction and General Description of Plant Site Characteristics3 May 2017St. Lucie, Unit 1, Updated Final Safety Analysis Report, Amendment No. 28, Chapter 1, Introduction and General Description of Plant Site Characteristics
L-2017-074, St. Lucie, Unit 1, Updated Final Safety Analysis Report, Amendment No. 28, Chapter 9, Auxiliary Systems3 May 2017St. Lucie, Unit 1, Updated Final Safety Analysis Report, Amendment No. 28, Chapter 9, Auxiliary Systems
L-2018-172, Redacted St. Lucie, Unit 1, Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features4 October 2018Redacted St. Lucie, Unit 1, Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features
L-2021-177, Amendment 31 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant Site Characteristics11 November 2021Amendment 31 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant Site Characteristics
ML08109024816 April 2008IR 05000335-08-007, 05000389-08-007 and 07200061-08-001 on 02/25 - 03/14/2008 for St. Lucie, Units 1 and 2 and ISFSI
ML08263041630 September 2008Issuance of Amendments Regarding the Incorporation of Technical Specification Task Force Standard Technical Specification Change Traveller, TSTF-448 Revision 3, Control Room Habitability, (TACs MD6174 and MD617)
ML09078024921 July 2008Initial Exam 2008-301 Draft RO Written Exam
ML12340A35230 November 2012St. Lucie, Unit 1, 12Q4116-RPT-001, Rev. 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Force Recommendation 2.3: Seismic
ML14002A1246 February 2014Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)
ML14023A62922 December 2013Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for St. Lucie Nuclear Plant, Units 1 and 2, TAC Nos.: MF0984 and MF0985
ML14051A6714 March 2014FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014
ML14084A56825 March 2014Updated Final Safety Analysis, Chapter 5, Section 5.0, 5.1, 5.2. 5.4; Includes Up to UFSAR Amendment No. 21
ML15140A39312 May 2015Final Compliance with EA- 12-051 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation
ML16096A33821 March 2016Revised FLEX Final Integrated Plan
ML17171A2393 May 2017St. Lucie, Unit 1, Updated Final Safety Analysis Report, Amendment No. 28, Chapter 1, Introduction and General Description of Plant Site Characteristics
ML17171A2503 May 2017St. Lucie, Unit 1, Updated Final Safety Analysis Report, Amendment No. 28, Chapter 9, Auxiliary Systems
ML17209A50731 December 1980Final Rept, Power Operated Relief Valve Failure Reduction Methods, Prepared for C-E Owners Group.Response to NUREG-0737 Encl
ML17209A65111 February 1981Forwards Info Re Fire Protection Mods for Facility,In Response to NRC 801124 Request.Item 6.0 Re Fire Brigade Size & Training Remains Open.Items Addressed Include Fire Door Evaluation & Smoke Detectors
ML17213A63029 October 1982Forwards Addl Info Requested Re Confirmatory Piping Analysis Open Items
ML17221A55823 December 1987Responds to NRC 871023 Request for Addl Info Re Util 870612 Proposed License Amend to Permit Replacement of Spent Fuel Pool Racks to Ensure That Sufficient Future Capacity Exists for Storage of Spent Fuel
ML17221A60529 January 1988Rev 1 to Spent Fuel Storage Facility Mod Sar.
ML17223A12931 December 1988Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 1.
ML17223A13231 December 1988Technical Evaluation Rept TMI Action NUREG-0737 (II.D.1) Relief & Safety Valve Testing,St Lucie,Unit 2.
ML17223B22916 July 1991Forwards Description & Summary of Safety Evaluation of Plant Changes/Mods Made,Reportable Per 10CFR50.59.Rept Includes Plant Changes/Mods Completed Between 900123-910122
ML17229A9034 November 1998Forwards Initial Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment.
ML17229B00131 January 1998Technical Evaluation Rept on 'Submittal-Only' Review of IPEEE at St Lucie Nuclear Plant,Units 1 & 2.
ML17266A35325 August 1981Forwards Responses to NRC Requests for Addl Info Re Facility.Responses Will Be Incorporated in Future FSAR Amend.Ten Oversize Drawings Encl.Aperture Cards Are Available in PDR
ML17298A0483 May 2017Redacted - St. Lucie, Unit 1, Updated Final Safety Analysis Report, Amendment No. 28, Chapter 6, Engineered Safety Features
ML17298A0503 May 2017Redacted - St. Lucie, Unit 1, Updated Final Safety Analysis Report, Amendment No. 28, Chapter 10, Steam and Power Conversion System
ML17301A00829 October 1982Submits Status & Schedule of Outstanding Seismic Qualification Repts.Plant Located in Lowest Earthquake Zone in Country.Probability of Earthquake W/Ground Accelerations of 0.5 Gravity Over Estimated at Once 3,000 Yrs
ML17308A4686 October 1988Rept of Changes Made Under Provisions of 10CFR50.59 for Period Ending 881006. W/890406 Ltr
ML17308A49922 January 1990Rept of 10CFR50.59 Plant Changes, Covering 890123-900122. W/900713 Ltr
ML17348B00519 July 1991Forwards Probabilistic Seismic Hazard Evaluation & Uniform Hazard Spectra Rept & Executive Summary for St Lucie & Turkey Point Nuclear Power Plant Sites