Issue date | Title | |
---|---|---|
05000263/FIN-2006009-02 | Failure to Perform a 50.59 Evaluation | |
05000263/FIN-2011002-04 | Licensee-Identified Violation | |
05000263/FIN-2015002-07 | Operations with a Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment Operable | |
05000263/LER-2015-003 | 1 of 4 | |
05000263/LER-2015-005 | 1 of 4 | |
IR 05000263/2006009 | 3 August 2006 | IR 05000263-06-009(DRS); Nuclear Management Generating Company, LLC; 05/08/2006 - 06/23/2006; Monticello Nuclear Generating Plant; Component Design Bases Inspection |
IR 05000263/2008009 | 16 December 2008 | Monticello Nuclear Generating Plant Special Inspection Report 05000263/2008009 |
IR 05000263/2012004 | 5 November 2012 | IR 05000263-12-004, 07/01/2012 - 09/30/2012, Monticello Nuclear Generating Plant; Maintenance Risk Assessment and Emergent Work Control, Follow-Up of Events and Notices of Enforcement Discretion |
IR 05000263/2015002 | 12 August 2015 | IR 05000263/2015002; on 04/01/15-06/30/15; Monticello Nuclear Generating Plant; Integrated; Fire Protection, Inservice Inspection Activities, Maintenance Risk Assessments and Emergent Work Control, Operability Evaluations, Drill Evaluations |
IR 05000363/2011005 | 1 February 2012 | IR 05000363-11-005, on 10/01/2011 - 12/31/2011, Monticello Nuclear Generating Plant. Maintenance Risk Assessment and Emergent Work Control, Outage Activities, Follow Up of Events and Notices of Enforcement Discretion, and Occupational Dose |
Information Notice 1990-22, Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units | 23 March 1990 | Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units |
Information Notice 1992-16, Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown | 25 February 1992 | Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown |
Information Notice 1993-27, Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization | 8 April 1993 | Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization |
Information Notice 1993-62, Thermal Stratification of Water in BWR Reactor Vessels | 10 August 1993 | Thermal Stratification of Water in BWR Reactor Vessels |
Information Notice 1993-89, Potential Problems with BWR Level Instrumentation Backfill Modifications | 26 November 1993 | Potential Problems with BWR Level Instrumentation Backfill Modifications |
Information Notice 1994-36, Undetected Accumulation of Gas in Reactor Coolant System | 24 May 1994 | Undetected Accumulation of Gas in Reactor Coolant System |
Information Notice 1994-52, Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1 | 15 July 1994 | Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1 |
Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel | 18 January 1996 | Partial Bypass of Shutdown Cooling Flow from Reactor Vessel |
Information Notice 1996-37, Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown | 18 June 1996 | Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown |
Information Notice 1996-42, Unexpected Opening of Multiple Safety Relief Valves | 5 August 1996 | Unexpected Opening of Multiple Safety Relief Valves |
Information Notice 1996-56, Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power | 22 October 1996 | Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power |
Information Notice 1996-65, Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown | 11 December 1996 | Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown |
Information Notice 1997-83, Recent Events Involving Reactor Coolant System Inventory Control During Shutdown | 5 December 1997 | Recent Events Involving Reactor Coolant System Inventory Control During Shutdown |
Information Notice 1999-14, Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick | 5 May 1999 | Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick |
L-MT-03-039, Revised Monticello Nuclear Generating Plant Technical Specifications Bases Pages | 22 May 2003 | Revised Monticello Nuclear Generating Plant Technical Specifications Bases Pages |
L-MT-04-017, Emergency Response Data System (ERDS) - Revision to Previously Submitted Data Point Library Information | 3 March 2004 | Emergency Response Data System (ERDS) - Revision to Previously Submitted Data Point Library Information |
L-MT-04-023, License Amendment Request: Selective Scope Application of an Alternative Source Term Methodology for Re-evaluation of the Fuel Handling Accident | 29 April 2004 | License Amendment Request: Selective Scope Application of an Alternative Source Term Methodology for Re-evaluation of the Fuel Handling Accident |
L-MT-05-009, Emergency Response Data System (ERDS) - Revision to Previously Submitted Data Point Library Information | 26 January 2005 | Emergency Response Data System (ERDS) - Revision to Previously Submitted Data Point Library Information |
L-MT-05-097, Additional Information to Support Technical Specification Changes for 24-Month Fuel Cycle License Amendment Request | 27 September 2005 | Additional Information to Support Technical Specification Changes for 24-Month Fuel Cycle License Amendment Request |
L-MT-05-107, Reply to Revised Notice of Violation Dated September 22, 2005 | 24 October 2005 | Reply to Revised Notice of Violation Dated September 22, 2005 |
L-MT-06-024, Emergency Response Data System (ERDS) - Revision to Previously Submitted Data Point Library Information | 31 March 2006 | Emergency Response Data System (ERDS) - Revision to Previously Submitted Data Point Library Information |
L-MT-06-034, Copy of Applicable Portions of the Us NRC and Monticello Improved Technical Specifications Conversion Website | 25 April 2006 | Copy of Applicable Portions of the Us NRC and Monticello Improved Technical Specifications Conversion Website |
L-MT-06-040, Emergency Response Data System (ERDS) - Revision to Previously Submitted Data Point Library Information | 25 May 2006 | Emergency Response Data System (ERDS) - Revision to Previously Submitted Data Point Library Information |
L-MT-06-054, Supplemental Submittal Regarding Full Scope Application of an Alternative Source Term (AST) | 21 August 2006 | Supplemental Submittal Regarding Full Scope Application of an Alternative Source Term (AST) |
L-MT-06-071, License Amendment Request: One-Time Low Pressure Coolant Injection Loop Select Logic Time Delay Relay Surveillance Interval Extension | 14 November 2006 | License Amendment Request: One-Time Low Pressure Coolant Injection Loop Select Logic Time Delay Relay Surveillance Interval Extension |
L-MT-07-009, License Amendment Request: Revision to the Allowable Values and Surveillance Intervals for the Low Pressure Coolant Injection Loop Select Logic Time Delay Relays | 29 January 2007 | License Amendment Request: Revision to the Allowable Values and Surveillance Intervals for the Low Pressure Coolant Injection Loop Select Logic Time Delay Relays |
L-MT-07-055, License Amendment Request: Revision to the Allowable Value and Channel Calibration Surveillance Interval for the Recirculation Riser Differential Pressure - High Function | 25 September 2007 | License Amendment Request: Revision to the Allowable Value and Channel Calibration Surveillance Interval for the Recirculation Riser Differential Pressure - High Function |
L-MT-08-018, Extended Power Uprate Startup Test Plan | 31 March 2008 | Extended Power Uprate Startup Test Plan |
L-MT-08-025, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process | 3 April 2008 | Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process |
L-MT-08-034, License Amendment Request: Revision to Required Actions for Specification 3.5.1, Emergency Core Cooling System | 26 June 2008 | License Amendment Request: Revision to Required Actions for Specification 3.5.1, Emergency Core Cooling System |
L-MT-09-006, Response to Request for Additional Information for the License Amendment Request Revising the Required Actions to Specification 3.5.1, Emergency Core Cooling System | 27 January 2009 | Response to Request for Additional Information for the License Amendment Request Revising the Required Actions to Specification 3.5.1, Emergency Core Cooling System |
L-MT-09-009, Technical Requirements Manual | 28 January 2009 | Technical Requirements Manual |
L-MT-09-048, Extended Power Uprate: Response to NRC Containment and Ventilation Review Branch (Scvb) Request for Additional Information (RAI) Dated March 19, 2009, and March 26,2009 | 13 July 2009 | Extended Power Uprate: Response to NRC Containment and Ventilation Review Branch (Scvb) Request for Additional Information (RAI) Dated March 19, 2009, and March 26,2009 |
L-MT-10-008, Technical Requirements Manual | 18 February 2010 | Technical Requirements Manual |
L-MT-10-055, License Amendment Request: Revise the Minimum Critical Power Ratio Safety Limit in Reactor Core Safety Limit 2.1.1.2 | 17 September 2010 | License Amendment Request: Revise the Minimum Critical Power Ratio Safety Limit in Reactor Core Safety Limit 2.1.1.2 |
L-MT-11-022, 002 Monticello - Technical Requirements Manual, Revision 7 | 27 April 2011 | 002 Monticello - Technical Requirements Manual, Revision 7 |
L-MT-12-035, Emergency Response Data System-Data Point Library Update | 18 April 2012 | Emergency Response Data System-Data Point Library Update |
L-MT-12-040, Notification of Changes to the Emergency Response Data System (ERDS) and MNGP Data Point Library (Dpl) | 26 April 2012 | Notification of Changes to the Emergency Response Data System (ERDS) and MNGP Data Point Library (Dpl) |
L-MT-12-091, Extended Power Uprate: Supplement to Revise Technical Specification Setpoint for the Automatic Depressurization System Bypass Timer | 30 October 2012 | Extended Power Uprate: Supplement to Revise Technical Specification Setpoint for the Automatic Depressurization System Bypass Timer |
L-MT-13-010, License Amendment Request: Reduce the Reactor Steam Dome Pressure Specified in the Reactor Core Safety Limits | 11 March 2013 | License Amendment Request: Reduce the Reactor Steam Dome Pressure Specified in the Reactor Core Safety Limits |