Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
05000366/LER-2016-001 | 8 June 2016 | 2C EDG Fuel Oil Relief Valve Leakage Caused Train Inoperability LER 16-001-00 for E.I. Hatch, Unit 2, Regarding 2C EDG Fuel Oil Relief Valve Leakage Caused Train Inoperability |
HL-2074, Ei Hatch Nuclear Plant - Units 1 & 2 Annual Operating Rept, 1991 | 31 December 1991 | Ei Hatch Nuclear Plant - Units 1 & 2 Annual Operating Rept, 1991 |
HL-2399, Forwards Suppl to 920821 Response to GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46. Seismic Margin Assessment Program Successfully Completed | 16 September 1992 | Forwards Suppl to 920821 Response to GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46. Seismic Margin Assessment Program Successfully Completed |
HL-4468, Forwards Response to NRC 931229 RAI Re 931001 Request to Revise TS for Increase in Allowable MSIV Leakage Rate & Deleton of MSIV Leakage Control Sys.Revised Proposed TS Pages & Suppl Piping Earthquake...Data Also Encl | 6 January 1994 | Forwards Response to NRC 931229 RAI Re 931001 Request to Revise TS for Increase in Allowable MSIV Leakage Rate & Deleton of MSIV Leakage Control Sys.Revised Proposed TS Pages & Suppl Piping Earthquake...Data Also Encl |
HL-4493, Forwards Response to NRC 940127 RAI Re Util 931001 Request to Revise TS to Increase Allowable MSIV Leakage Rate & Delete Requirements for Currently Installed MSIV Leakage Control Sys | 3 February 1994 | Forwards Response to NRC 940127 RAI Re Util 931001 Request to Revise TS to Increase Allowable MSIV Leakage Rate & Delete Requirements for Currently Installed MSIV Leakage Control Sys |
HL-4513, Ei Hatch Nuclear Plant Units 1 & 2 Annual Operating Rept 1993 | 31 December 1993 | Ei Hatch Nuclear Plant Units 1 & 2 Annual Operating Rept 1993 |
HL-4781, Submits Addl Info Requested by NRC Re Recent Core Shroud Mod on Plant Unit 1 | 20 February 1995 | Submits Addl Info Requested by NRC Re Recent Core Shroud Mod on Plant Unit 1 |
HL-4787, 1994 Annual Operating Period | 31 December 1994 | 1994 Annual Operating Period |
HL-4832, Requests Exemption from Testing Criteria of 10CFR50,App J | 20 June 1995 | Requests Exemption from Testing Criteria of 10CFR50,App J |
HL-4877, Forwards Core Shroud Stabilizer Design Submittal,Providing Analyses & Conclusions Supporting Implementation of Facility Shroud Repair.Ge Proprietary Info Also Encl.Ge Proprietary Info Withheld Per 10CFR2.790 | 3 July 1995 | Forwards Core Shroud Stabilizer Design Submittal,Providing Analyses & Conclusions Supporting Implementation of Facility Shroud Repair.Ge Proprietary Info Also Encl.Ge Proprietary Info Withheld Per 10CFR2.790 |
HL-5115, Ei Hatch Nuclear Plant - Units 1 & 2 Annual Operating Rept 1995 | 31 December 1995 | Ei Hatch Nuclear Plant - Units 1 & 2 Annual Operating Rept 1995 |
HL-5154, Forwards Response to NRC RAI Re Util 960221 Request to Revise TS to Change Drywell Air Temp LCO | 1 May 1996 | Forwards Response to NRC RAI Re Util 960221 Request to Revise TS to Change Drywell Air Temp LCO |
HL-5227, Forwards Response to RAI Re Unresolved Safety Issue A-46 | 23 August 1996 | Forwards Response to RAI Re Unresolved Safety Issue A-46 |
HL-5282, Forwards Response to NRC Request to Provide Info Re Adequacy & Availability of Design Bases Info for Ei Hatch Nuclear Plant | 30 January 1997 | Forwards Response to NRC Request to Provide Info Re Adequacy & Availability of Design Bases Info for Ei Hatch Nuclear Plant |
HL-5320, 1996 Annual Operating Rept for Edwin I Hatch Npp,Units 1 & 2 | 31 December 1996 | 1996 Annual Operating Rept for Edwin I Hatch Npp,Units 1 & 2 |
HL-5377, Forwards Addl Info Re Resolution of USI A-46,per NRC 970130 Request & Util | 25 April 1997 | Forwards Addl Info Re Resolution of USI A-46,per NRC 970130 Request & Util |
HL-5538, Forwards Response to Request for Addl Info Re USI A-46.Util Response to Remaining Requests Will Be Provided by 980213 | 30 December 1997 | Forwards Response to Request for Addl Info Re USI A-46.Util Response to Remaining Requests Will Be Provided by 980213 |
HL-5572, Forwards Nonproprietary Vols 1 & 3 of Response to NRC 971031 Request for Addl Info on Resolution of Unresolved Safety Issue A-46.Vol 2 Consists of Proprietary Calculations.Vol 2 Withheld,Per 10CFR2.790 | 6 February 1998 | Forwards Nonproprietary Vols 1 & 3 of Response to NRC 971031 Request for Addl Info on Resolution of Unresolved Safety Issue A-46.Vol 2 Consists of Proprietary Calculations.Vol 2 Withheld,Per 10CFR2.790 |
HL-5581, Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 2 | 31 December 1997 | Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 2 |
IR 05000321/1989008 | 17 August 1989 | Insp Repts 50-321/89-08 & 50-366/89-08 on 890515-19,0605-09 & 19.Violations Noted.Major Areas Inspected:Operational Readiness of Emergency Diesel Generators & Support Sys to Meet Intended Functions Under All Postulated Conditions |
IR 05000321/1993017 | 22 September 1993 | Insp Repts 50-321/93-17 & 50-366/93-17 on 930808-0904.No Violations or Deviations Noted.Major Areas Inspected: Operations,Surveillance Testing,Maint Activities,Rv Water Level Instrumentation Mods & Review of Open Items |
ML020640450 | 27 February 2002 | Annual Operating Report for 2001 |
ML022060215 | 19 July 2002 | Emergency Implementing Procedures Revision |
ML023290006 | 9 January 2003 | October 2002 Exam 50-321/2002-301 Final SRO Writtem Exam with Answers & References |
ML062490242 | 29 August 2006 | Enclosure 1, E. I. Hatch Request to Implement an Alternative Source Term - AST Safety Assessment |
ML062490492 | 28 July 2006 | Enclosure 8, E. I. Hatch, Request to Implement an Alternative Source Term - Unit 1 Main Steam Isolation Valve Alternate Leakage Path Seismic Evaluation |
ML062490498 | 28 July 2006 | Enclosure 9, E. I. Hatch, Request to Implement Alternative Source Term - Unit 1 Seismic Verification of Potential Secondary Containment Bypass Leakage Paths Terminating at Main Condenser |
ML062850366 | 10 October 2006 | Part 21 Notification - BWR Core Shroud Tie Rod Upper Support Cracking |
ML081770075 | 28 August 2008 | Issuance of Amendment Nos. 256 and 200, Alternate Source Term |
ML081970392 | 14 July 2008 | Edwin I. Hatch, Transmittal of Responses to Request for Additional Information Addition of License Conditions to Operating Licenses for Request to Implement an Alternative Source Term |
ML090440578 | 13 February 2009 | Safety Evaluation and Request for Additional Information, Reactor Core Shroud Relief Request |
ML11320A119 | 24 October 2011 | 2011 Updated Final Safety Analysis Report, Revision 29, Chapter 6, Engineered Safety Features Through Chapter 7, Instrumentation and Control |
ML12215A283 | 17 April 2015 | G20110563 - LTR to Lochbaum -- Draft Director'S Decision Re 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs |
ML12215A314 | 17 April 2015 | Proposed Director'S Decision - 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs |
ML12355A631 | 26 November 2012 | SNCH082-RPT-02, Ver. 1.0, Edwin I. Hatch, Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 2 of 11 |
ML12355A637 | 26 November 2012 | SNCH082-RPT-02, Ver. 1.0, Edwin I. Hatch Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 1 of 11 |
ML13015A268 | 17 December 2012 | Draft Submittal Order EA-12-049 - February 2013 FLEX Integrated Plan- Hatch |
ML13025A301 | 29 January 2013 | NRC Comments on Draft Integrated Plans, Hatch |
ML13364A202 | 27 February 2014 | Interim Staff Evaluation Related to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) |
ML14045A147 | 12 February 2014 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2, TAC Nos.: MF0712 and MF0713 |
ML14052A040 | 18 February 2014 | Hatch Order EA-13-109 (HCVS) Phase 1 OIP Revision |
ML14324A424 | 1 May 2005 | Version 19 to Emergency Plan. ML051580245 |
ML14324A425 | 22 July 2014 | Revision 34 to Emergency Plan. ML14252A291 |
ML14335A137 | 25 March 2015 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents) |
ML15069A112 | 17 April 2015 | G20110563 - Licensee Letter Regarding Draft Director'S Decision to Licensee'S with Mark I and II Containment Design |
ML15106A265 | 17 April 2015 | April 22, 2015, Meeting with Southern Nuclear Company, Draft Standard Emergency Plan Annex for Vogtle Electric Generating Plant, Units 1 and 2 |
ML15138A229 | 15 April 2015 | Emergency Plan, Revision 37 |
ML15233A074 | 10 August 2015 | SPRA Relief - Information to Support Reconsideration of Hatch U1 for Inclusion in SPRA Relief Due to Seismic Robustness and Similarities to Hatch U2 |
ML15236A120 | 25 August 2015 | Order EA-13-109 (HCVS) Phase 1 and 2 OIP Rev 0H3A - August 25, 2015 |
ML15246A059 | 31 August 2015 | Enclosure 14 - Vogtle (Units 3 and 4) Standard Emergency Plan Annex & Enclosure 15- Vogtle (Units 3 and 4) Justification Matrix |