IR 05000333/20080047 November 2008IR 05000333-08-004; on 07/01/08 to 09/30/08; James A. FitzPatrick Nuclear Power Plant; Refueling and Other Outage Activities; and Identification and Resolution of Problems
IR 05000333/200800717 December 2008IR 05000333-08-007, on 11/20/2008, James A. FitzPatrick Nuclear Power Plant, Temporary Instruction 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 & 3 Mitigating Strategies. - Letter OnlyB.5.b Mitigating Strategies
IR 05000333/20084035 December 2008IR 05000333-08-403, on 11/03/2008 - 11/07/2008, for James A. FitzPatrick, Access Authorization (Letter Only)Significance Determination Process
Affidavit
JAFP-08-0102, Request for Relief (RR-7 Revision 1) - Proposed Alternative to ASME Code Requirements for Weld Overlay Repairs1 October 2008Request for Relief (RR-7 Revision 1) - Proposed Alternative to ASME Code Requirements for Weld Overlay RepairsWeld Overlay
Hydrostatic
Nondestructive Examination
VT-2
Liquid penetrant
Dissimilar Metal Weld
JAFP-08-0103, Certificate of Compliance Not Met During Receipt of Low-Level Radioactive Waste Shipment at Barnwell, Sc Disposal Facility2 October 2008Certificate of Compliance Not Met During Receipt of Low-Level Radioactive Waste Shipment at Barnwell, Sc Disposal FacilityRAMQC
JAFP-08-0106, Core Operating Limits Report, Revision 2410 October 2008Core Operating Limits Report, Revision 24
JAFP-08-0107, Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems14 October 2008Nine-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray SystemsSafe Shutdown
Mission time
Scaffolding
JAFP-08-0109, Submittal of the Final Ultrasonic Test Results on the N2C-SE Weld Overlay20 October 2008Submittal of the Final Ultrasonic Test Results on the N2C-SE Weld OverlayWeld Overlay
JAFP-08-0112, Response to Request for Additional Information Regarding: Application for Amendment to Technical Specifications Regarding Diesel Fuel Oil, Lube Oil, and Starting Air Consistent with TSTF-501 and Diesel Fuel Oil22 October 2008Response to Request for Additional Information Regarding: Application for Amendment to Technical Specifications Regarding Diesel Fuel Oil, Lube Oil, and Starting Air Consistent with TSTF-501 and Diesel Fuel Oil
JAFP-08-0128, James A. FitzPatrick, Revised Submittal Date for the Stress Analysis Summary for the N2C-SE Weld Overlay4 December 2008James A. FitzPatrick, Revised Submittal Date for the Stress Analysis Summary for the N2C-SE Weld OverlayWeld Overlay
Dissimilar Metal Weld
JAFP-08-0128, Revised Submittal Date for the Stress Analysis Summary for the N2C-SE Weld Overlay4 December 2008Revised Submittal Date for the Stress Analysis Summary for the N2C-SE Weld OverlayWeld Overlay
JAFP-08-0131, Enclosure 2, Structural Integrity Associates, Inc. Calculation 0800769.311 Crack Growth Analysis for Recirculation Inlet Nozzle N-2C4 December 2008Enclosure 2, Structural Integrity Associates, Inc. Calculation 0800769.311 Crack Growth Analysis for Recirculation Inlet Nozzle N-2CWeld Overlay
Dissimilar Metal Weld
JAFP-08-0131, Enclosure 3, Structural Integrity Associates, Inc. Calculation 0800769.316 Reconciliation of Recirculation Inlet N2 Nozzle-to-Safe End Weld Overlay Repair with Nozzle Stress Report3 December 2008Enclosure 3, Structural Integrity Associates, Inc. Calculation 0800769.316 Reconciliation of Recirculation Inlet N2 Nozzle-to-Safe End Weld Overlay Repair with Nozzle Stress ReportWeld Overlay
Finite Element Analysis
Dissimilar Metal Weld
JAFP-08-0131, James A. FitzPatrick Nuclear Power Plant - Submittal of the Stress Analysis Summary for the N2C-SE Weld Overlay17 December 2008James A. FitzPatrick Nuclear Power Plant - Submittal of the Stress Analysis Summary for the N2C-SE Weld OverlayWeld Overlay
Finite Element Analysis
Dissimilar Metal Weld
JAFP-08-0133, 10 CFR 50.46 Annual Report - Errors in Emergency Core Cooling System (ECCS) Evaluation Models22 December 200810 CFR 50.46 Annual Report - Errors in Emergency Core Cooling System (ECCS) Evaluation Models
ML0826303653 October 2008Issuance of Amendment Relocation of Pressure and Temperature Curves to the Pressure and Temperature Limits Report Consistent with TSTF-419-APost Accident Monitoring
Hydrostatic
Incorporated by reference
Pressure and Temperature Limits Report
ML08282020321 October 2008Extension Request for Response to GL 2008-01
ML0828203903 October 2008Technical Specification Relocation of Pressure and Temperature Curves to the Pressure and Temperature Limits Report Consistent with TSTF-419-APost Accident Monitoring
Hydrostatic
Pressure and Temperature Limits Report
ML08289052115 October 2008MD9780, Acceptance Review for Relief Request RR-7
ML08291007316 October 2008TAC MD8717, Draft Rais, Relief Requests Plant ISI Program Third 10-year CloseoutLiquid penetrant
ML08294026224 October 2008James a FitzPatrick Nuclear Power Plant-Request for Withholding Information from Public Disclosure Core Operating Limits Report, Revision 24 for Cycle 19 Using GNF-2 Fuel Assemblies
ML08295047124 October 2008Closeout of Generic Letter 2007-01 Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.
ML08310066319 November 2008Request for Additional Information Third 10-Year Interval Inservice Inspection Program Plan Relief Request RR-CRV-01Liquid penetrant
ML0834603374 December 2008James A. FitzPatrick, Revised Submittal Date for the Stress Analysis Summary for the N2C-SE Weld OverlayWeld Overlay
Dissimilar Metal Weld
ML08353045212 December 2008the State of New York, V USNRC and Entergy Nuclear Operations Inc; 08-3903-ag(L)/08-4833-ag(CON) - Motion Out of Time
ML08359033817 December 2008James A. FitzPatrick Nuclear Power Plant - Submittal of the Stress Analysis Summary for the N2C-SE Weld OverlayWeld Overlay
Finite Element Analysis
Dissimilar Metal Weld
ML0835903394 December 2008Enclosure 2, Structural Integrity Associates, Inc. Calculation 0800769.311 Crack Growth Analysis for Recirculation Inlet Nozzle N-2CWeld Overlay
Dissimilar Metal Weld
TAC:MD432924 October 2008
TAC:MD782821 October 2008
TAC:MD871716 October 2008