Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000004/201301226 April 2012IR 05000413-012-002, 05000414-012-002; 1/1/2012 - 3/31/2012; Catawba Nuclear Station, Units 1 and 2; Flood Protection Measures
IR 05000413/19860329 September 1986Insp Repts 50-413/86-32 & 50-414/86-35 on 860811-15.No Violations or Deviations Noted.Major Areas Inspected:Plant Chemistry
IR 05000413/19880088 March 1988Insp Repts 50-413/88-08 & 50-414/88-08 on 880126-0225. Violations Noted.Major Areas Inspected:Surveillance Observation,Maint,Review of Licensee Nonroutine Event Repts & Followup of Previously Identified Items
IR 05000413/198800926 May 1988Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-413/88-09 & 50-414/88-09.Disagrees W/Util Assessment That Measures Were Adequate to Control Eddy Current Testing of Tubes
IR 05000413/19880124 April 1988Insp Repts 50-413/88-12 & 50-414/88-12 on 880222-26. Violation Noted.Major Areas Inspected:Radiation Protection Area of Unit 2 Outage,Including Audits,Surveillances, Planning,Preparation,Training,Qualification & IE Notices
IR 05000413/198803212 September 1988Insp Repts 50-413/88-32 & 50-414/88-32 on 880815-19.No Violations Noted.Major Areas Inspected:Steam Generator Tube Leak,Integral Simulation Test of Pumps & Valves,Temporary Instruction & Action on Previous Insp Findings
IR 05000413/198901811 August 1989Insp Repts 50-413/89-18 & 50-414/89-18 on 890717-21. Violation Re Turbine Bldg Sump Analyses Noted But Not Cited. Major Areas Inspected:Chemistry,Liquid Waste Controls & Previously Identified Inspector Followup Items
IR 05000413/199202723 November 1992Insp Repts 50-413/92-27 & 50-414/92-27 on 921011-1107.No Violations Noted.Major Areas Inspected:Plant Operations & Standy Makeup Pump Operability Verification & Review
IR 05000413/199302017 November 1993Discusses SALP Insp Repts 50-413/93-20 & 50-414/93-20 on 920503-931002.Informs That Overall Performance at Plant Improved Since Previous Assessment
IR 05000413/200100615 January 2002IR 05000413/2001-006 & IR 05000414/2001-006, Catawba Nuclear Station, Quarterly Integrated Resident Inspection on 09/23-12/22/2001. No Violations Noted
IR 05000413/200300228 April 2003IR 05000413-03-002, IR 05000414-03-002, on 12/29/2002-3/29/2003; Duke Energy Corporation; Catawba Nuclear Station, Units 1 and 2; Other Activities and Investigations Report 2-2002-021
IR 05000413/200300516 January 2004IR 05000413-03-005 & 05000414-03-005, on 09/28/03 Through 12/20/03, for Catawba Nuclear Station; Maintenance Effectiveness, Post-Maintenance & Surveillance Testing & Other Activities
IR 05000413/200400627 January 2005IR 05000413-04-006 and IR 05000414-04-006 on 09/19 - 12/31/04 for Catawba Nuclear Station, Units 1 & 2; Event Followup and Other Activities
IR 05000413/200500328 July 2005IR 05000413-05-003, IR 05000414-05-003, IR 0720045-05-001; 4/1/2005 - 6/30/2005; Catawba Nuclear Station, Units 1 and 2; Operability Evaluations
IR 05000413/200600328 July 2006IR 05000413-06-003, 05000414-06-003; 4/1/2006 - 6/30/2006; Catawba Nuclear Station, Units 1 and 2; Event Followup
IR 05000413/200700531 January 2008IR 05000413-07-005, 05000414-07-005 on 10/01/2007 - 12/31/2007 for Catawba, Units 1 and 2; Inservice Inspection Activities, Maintenance Risk Assessments, Permanent Plant Modifications, and Post-Maintenance Testing
IR 05000413/200800330 July 2008IR 05000413-08-003, 05000414-08-003, on 4/1/2008 - 6/30/2008, Catawba Nuclear Station, Units 1 and 2, Integrated Inspection Report
IR 05000413/200900228 April 2009IR 05000413-09-002, 05000414-09-002, on 01/01/2009 - 03/31/2008, Catawba Nuclear Station, Units 1 and 2; Design Control Integrated Inspection
IR 05000413/200900528 January 2010IR 05000413-09-005, 05000414-09-005; 10/1/2009 - 12/31/2009; Catawba Nuclear Station, Units 1 and 2; Mitigating Systems
IR 05000413/201000228 April 2010IR 05000413-10-002, 05000414-10-002, on 1/1/2010 - 3/31/2010, Catawba Nuclear Station, Units 1 and 2, Routine Integrated Report
IR 05000413/201000528 January 2011IR 05000413-10-005, 05000414-10-005; 10/1/2010 - 12/31/2010; Catawba Nuclear Station, Units 1 and 2; Licensed Operator Requalification, Radiological Hazard Assessment and Exposure Controls, and Radiation Monitoring Instrumentation
IR 05000413/201100327 July 2011IR 05000413-11-003, 05000414-11-003; 4/1/2011 - 6/30/2011; Catawba Nuclear Station, Units 1 and 2; Fire Protection, Maintenance Effectiveness
IR 05000413/201200226 April 2012IR 05000413-012-002, 05000414-012-002; 1/1/2012 - 3/31/2012; Catawba Nuclear Station, Units 1 and 2; Flood Protection Measures
IR 05000413/201300225 April 2013IR 05000413-13-002 & 05000414-13-002, 01/01/2013 - 03/31/2013, Catawba Nuclear Station Units 1 and 2, NRC Integrated Inspection Report
IR 05000413/20140031 August 2014IR 05000413-14-003, 05000414-14-003; on 4/1/2014 - 6/30/2014; Catawba Nuclear Station, Units 1 and 2, Integrated Inspection Report
IR 05000413/201600316 February 2017Errata for Catawba Nuclear Station - NRC Integrated Inspection Report 05000413/2016003 and 05000414/2016003 and Exercise of Enforcement Discretion
IR 05000413/20210025 August 2021Integrated Inspection Report 05000413/2021002 and 05000414/2021002
IR 05000413/202300225 July 2023Integrated Inspection Report 05000413/2023002 and 05000414/2023002
IR 05000414/200900328 July 2009IR 05000413-9-003 & 05000414-09-003 on 04/01/09 - 06/30/08 for Catawba, Units 1 & 2
ML02227065214 August 2002Chapter 3 Draft SER with Open Items, Aging Management Review Results
ML0307306323 March 2003Duke Power Co 20-Day Response to NRC Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors
ML0328804569 October 2003Notice of Enforcement Discretion (NOED) Request Technical Specification (TS) 3.6.6 Containment Spray System (CSS)
ML0328904051 October 2003Response to Request for Additional Information Regarding the Use of Mixed Oxide Fuel Lead Assemblies
ML03290113715 October 2003Duke Energy Corp, Catawba, Unit 1, Proposed Technical Specification Amendment (Ts), TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation and TS 3.6.6, Containment Spray System
ML03294051715 October 2003Proposed Technical Specifications (TS) Amendment TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation TS 3.6.6, Containment Spray System
ML04023033515 January 2004December 2003 Monthly Operating Report for Oconee, McGuire, and Catawba Nuclear Stations
ML04141030413 May 2004April 2004 Monthly Operating Report for Oconee, McGuire and Catawba Nuclear Power Plants
ML0414201284 May 2004Steam Generator Outage Summary Report for End of Cycle 14 Refueling Outage
ML04328041015 November 2004October 2004 Monthly Operating Report for Oconee Nuclear Station, McGuire Nuclear Station, & Catawba Nuclear Station
ML08052017520 March 2008Request to Relax Nondestructive Examination of Reactor Pressure Vessel Head Penetration Nozzles in First Revised Order EA-03-009
ML09138025124 March 2009EOC 16 Stream Generator Inspection Results NRC Update - March 24, 2009
ML12054A69212 March 2012Issuance of Amendment Nos. 267 and 263, Revise Technical Specifications for Permanent Alternate Repair Criteria for Steam Generator Tubes
ML12334A36429 November 2012Notification of Inspection and Request for Inspection
ML13071A63221 February 2010Monthly Operating Reports Data
ML13176A4008 July 2013Proposed Relief Request 13-CN-001, Use of Alternate Depth Sizing Criteria
ML15286A32626 October 2015Proposed Relief Request 14-CN-003, American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (ASME Code), Code Case N-695
ML16120A08727 April 2016Notification of Inspection and Request for Information
ML16307A0042 November 2016NRC Integrated Inspection Report 05000413/2016003 and 05000414/2016003 and Exercise of Enforcement Discretion
ML19128A32620 June 2019Alternative to Depth Sizing Qualification Examination of Welds
ML19148A63628 May 2019Notification of Inspection and Request for Information