Semantic search

Jump to navigation Jump to search
 Issue dateFromTitleProject stage
ML20067D70714 December 1982FirstEnergy
Crouse R
Responds to Concerning Response to Draft Technical Evaluation Rept Re Control of Heavy Loads.Util Reviewing Request to Submit Phase II Rept.Response Will Be Provided 830131Draft Other
ML20077L7899 August 1983FRANKLIN INSTITUTE
Ahmed N
Bomberger C
Control of Heavy Loads (C-10),Toledo Edison Co,Davis-Besse Nuclear Power Station Unit 1, Draft Technical Evaluation ReptDraft Other
ML20079Q1806 May 1983FirstEnergy
Crouse R
Forwards Response to Open Item on Safe Load Paths Contained in NRC 820923 Technical Evaluation Rept of Util 820201 Submittal Re Control of Heavy Loads (NUREG-0612)Other
ML20083D63816 December 1983FirstEnergy
Crouse R
Forwards Response to Section 5.1.1(4) of NUREG-0612, Control of Heavy Loads of Nuclear Power Plants, Consisting of Test Results of Missile Shield Lifting Harness Per DG EisenhutOther
ML20097E09611 September 1984FirstEnergy
Crouse R
Forwards Insp Table Missile Shield Lifting Harness & Generic Load Path for Heavy Loads Not Covered by Specific Procedures.Info Resolves NUREG-0612,Phase I ItemsOther
ML20106A65424 September 1984FRANKLIN INSTITUTE
Bomberger C
Control of Heavy Loads (C-10),Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation ReptOther