Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML15163A280 | 1 June 2015 | Final Safety Analysis Report (Fsar)/Fire Protection Evaluation Report (Fper), Updated Through May 31, 2015, Cover | |
ML16166A053 | 25 May 2016 | Submittal of Final Safety Analysis Report (FSAR) Updated Through May 31, 2016 | Boric Acid Loop seal FLEX B.5.b Mitigating Strategies |
ML16166A070 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | Safe Shutdown Post Accident Monitoring Hydrostatic Incorporated by reference |
ML16166A073 | 25 May 2016 | Virgil C. Summer, Unit 1 - Updated Final Safety Analysis Report, Chapter 2, Site Characteristics | |
ML16166A074 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 2, Figure 2.1-26 | |
ML16166A075 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-10 | |
ML16166A077 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-13 | |
ML16166A078 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-3 | |
ML16166A079 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-25 | |
ML16166A080 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-27 | |
ML16166A081 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-77 | |
ML16166A082 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-78 | |
ML16166A083 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-79 | |
ML16166A085 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 2, Figures 2F-2 - 2F-86 | B.5.b Mitigating Strategies |
ML16166A107 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems | Safe Shutdown Boric Acid Shutdown Margin Packing leak Ultimate heat sink Fire Barrier Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Finite Element Analysis Tornado Generated Missile Design basis earthquake Earthquake Fuel cladding Power change |
ML16166A108 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 4, Reactor | Shutdown Margin |
ML16166A110 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features | Safe Shutdown Hydrostatic |
ML16166A111 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls | Anticipated operational occurrence Post Accident Monitoring Earthquake |
ML16166A114 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System | Safe Shutdown Boric Acid Shutdown Margin Safe Shutdown Earthquake Weld Overlay Hydrostatic Operating Basis Earthquake Liquid penetrant Dissimilar Metal Weld Flow Induced Vibration |
ML16166A122 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems | |
ML16166A123 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 9, Figures 9.2 | |
ML16166A124 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 9, Figures 9.4 | |
ML16166A136 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | |
ML16166A148 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System | Boric Acid Grab sample Hydrostatic |
ML16166A154 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 12, Radiation Protection | High Radiation Area |
ML16166A167 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 12, Figure 12.1-8 | |
ML16166A231 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 13 | High winds High Radiation Area |
ML16166A232 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 14 | Boric Acid Shutdown Margin Stroke time Hydrostatic Emergency Lighting |
ML16166A233 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 15 | Post Accident Monitoring Emergency Lighting |
ML16166A234 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 16 | |
ML16166A235 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 17 | Hydrostatic Nondestructive Examination |
ML16166A237 | 25 May 2016 | Updated Final Safety Analysis Report, Chapter 18 | Boric Acid Fire Barrier Coatings Aging Management Moisture barrier Liquid penetrant Fire Protection Program |
ML16166A239 | 25 May 2016 | Approved Updated Final Safety Analysis Report/Fire Protection Evaluation Report Notices | Boric Acid Loop seal FLEX B.5.b Mitigating Strategies |
ML18221A134 | 31 July 2018 | Submittal of Updated Final Safety Analysis Report, Updated Through May 31, 2018 | FLEX |
ML18221A145 | 31 May 2018 | Submittal of Updated Final Safety Analysis Report, Updated Through May 31, 2018, Cover Sheet | |
ML18221A147 | 31 May 2018 | Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | Safe Shutdown Post Accident Monitoring Hydrostatic |
ML18221A151 | 31 May 2018 | Updated Final Safety Analysis Report, Figure 2.1-26, Land Use within 10 Miles of the Site, 1966-1968 | |
ML18221A152 | 31 May 2018 | Updated Final Safety Analysis Report, Figure 2.4-6, Site Improvements | |
ML18221A153 | 31 May 2018 | Updated Final Safety Analysis Report, Figure 2.5-10, Regional Erts Photo Linear Map | |
ML18221A154 | 31 May 2018 | Updated Final Safety Analysis Report, Figure 2.5-13, Areal Geological Map | |
ML18221A155 | 31 May 2018 | Updated Final Safety Analysis Report, Figure 2.5-25, Structure Map of Reactor Building and Staging Area Excavations | |
ML18221A156 | 31 May 2018 | Updated Final Safety Analysis Report, Figure 2.5-27, Structure Map of Control Building Excavation | |
ML18221A157 | 31 May 2018 | Updated Final Safety Analysis Report, Figure 2.5-3, Regional Geologic Map | |
ML18221A158 | 31 May 2018 | Updated Final Safety Analysis Report, Figure 2.5-77, Cross Section A-A' | |
ML18221A159 | 31 May 2018 | Updated Final Safety Analysis Report, Figure 2.5-78, Cross Section B-B' | |
ML18221A160 | 31 May 2018 | Updated Final Safety Analysis Report, Figure 2.5-79, Cross Section C-C' | |
ML18221A162 | 31 May 2018 | Updated Final Safety Analysis Report, Figures 2F, Key to Soil Symbols and Terms | B.5.b Mitigating Strategies |
ML18221A165 | 31 May 2018 | Updated Final Safety Analysis Report, Chapter 3.0, Design of Structures, Components, Equipment and Systems | Safe Shutdown Boric Acid Shutdown Margin Packing leak Ultimate heat sink Non-Destructive Examination Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Post Accident Monitoring Hydrostatic Enforcement Discretion Coatings Operating Basis Earthquake Finite Element Analysis Tornado Generated Missile Abnormal operational transient Tornado Missile Protection Design basis earthquake Earthquake Maintenance Rule Program Control of Heavy Loads Turbine Missile Fuel cladding Liquid penetrant Pressure Boundary Leakage Through-Wall Leakage Power change |
ML18221A166 | 31 May 2018 | Updated Final Safety Analysis Report, Chapter 4.0, Reactor | Boric Acid Shutdown Margin Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Earthquake Fuel cladding Power change |
ML18221A167 | 31 May 2018 | Updated Final Safety Analysis Report, Chapter 5.0, Reactor Coolant System | Safe Shutdown Boric Acid Shutdown Margin Safe Shutdown Earthquake Weld Overlay Hydrostatic Operating Basis Earthquake Nondestructive Examination Earthquake Fuel cladding Liquid penetrant Pressure Boundary Leakage Dissimilar Metal Weld Power change Flow Induced Vibration |