Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
LR-N05-0336, Request for Changes to Technical Specifications Relocation of Response Time Testing Time Limits to the Updated Final Safety Analysis Report19 August 2005Request for Changes to Technical Specifications Relocation of Response Time Testing Time Limits to the Updated Final Safety Analysis ReportShutdown Margin
Packing leak
LR-N12-0156, Submittal of Updated Final Safety Analysis Report, Revision 26, Salem Units 1 & 2 Technical Specification Bases Changes, 10 CFR 54.37(b) Review Results and PSEG Nuclear LLC Quality Assurance Topical Report, NO-AA-10, Revision 8221 May 2012Submittal of Updated Final Safety Analysis Report, Revision 26, Salem Units 1 & 2 Technical Specification Bases Changes, 10 CFR 54.37(b) Review Results and PSEG Nuclear LLC Quality Assurance Topical Report, NO-AA-10, Revision 82Safe Shutdown
Boric Acid
Time of Discovery
Shutdown Margin
Packing leak
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Cyber Security
Incorporated by reference
B.5.b
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Design basis earthquake
Annual Radiological Environmental Operating Report
Process Control Program
Safeguards Contingency Plan
License Renewal
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Fire Protection Program
Power change
Unidentified leakage
LR-N17-0034, Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.8-1 Through 3.8-5630 January 2017Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.8-1 Through 3.8-56
LR-N17-0034, Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 6.3-1A Through 6.3-430 January 2017Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 6.3-1A Through 6.3-4
LR-N17-0034, Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.1-1 Through 9.1-930 January 2017Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.1-1 Through 9.1-9
LR-N17-0034, Redacted Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 5.5-1 Through 5.5-730 January 2017Redacted Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 5.5-1 Through 5.5-7
LR-N17-0034, Redacted-Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Section 2.2, Nearby Industrial, Transportation, and Military Facilities30 January 2017Redacted-Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Section 2.2, Nearby Industrial, Transportation, and Military Facilities
LR-N17-0034, Redacted-Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Section 3.6, Figure 3.6-1 Through Figure 3.6-3030 January 2017Redacted-Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Section 3.6, Figure 3.6-1 Through Figure 3.6-30
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Appendix 15.3A, Generic Small Break Analysis30 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Appendix 15.3A, Generic Small Break Analysis
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Appendix 3.6A, Description of Backdraft Damper30 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Appendix 3.6A, Description of Backdraft Damper
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Appendix 3.9A, Bolted Connections for Linear Component Support30 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Appendix 3.9A, Bolted Connections for Linear Component Support
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Appendix 3A, Pse&G Positions on Us NRC Regulatory Guides30 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Appendix 3A, Pse&G Positions on Us NRC Regulatory GuidesShutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Weld Overlay
Coatings
Temporary Modification
Earthquake
Turbine Missile
Liquid penetrant
Pressure Boundary Leakage
Fire Protection Program
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Appendix 7A, Program Element Descriptions Resulting from the Implementation of the May 6, 1983 Order30 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Appendix 7A, Program Element Descriptions Resulting from the Implementation of the May 6, 1983 Order
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Appendix a, TMI Lesson Learned30 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Appendix a, TMI Lesson LearnedBoric Acid
Reactor Vessel Water Level
Loop seal
Grab sample
Anticipated operational occurrence
Unidentified leakage
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 15, Figures 15.4-2 to 15.4-11130 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 15, Figures 15.4-2 to 15.4-111Fuel cladding
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 15, Section 15.5, Anticipated Transients Without Scram30 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 15, Section 15.5, Anticipated Transients Without Scram
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 17, Figures 17.2-1 to 17.2-430 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 17, Figures 17.2-1 to 17.2-4
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.2-1 to 4.2-2530 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.2-1 to 4.2-25
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.3-1 to 4.3-3530 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.3-1 to 4.3-35
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.4-1 to 4.4-1730 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.4-1 to 4.4-17
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.4.1 to 4.4-66d30 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.4.1 to 4.4-66dHydrostatic
Power change
Flow Induced Vibration
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.5-1 to 4.5-430 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.5-1 to 4.5-4
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Section 4.5, Reload Analyses30 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Section 4.5, Reload AnalysesShutdown Margin
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Sections 4.3.1 to 4.3-6130 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Sections 4.3.1 to 4.3-61Boric Acid
Shutdown Margin
Power change
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Sections 5.4.1 to 5.4-1430 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Sections 5.4.1 to 5.4-14Boric Acid
Hydrostatic
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Tables 4.2-1 to 4.2-230 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Tables 4.2-1 to 4.2-2
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Tables 4.3-1 to 4.3-1130 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Tables 4.3-1 to 4.3-11Shutdown Margin
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Tables 4.4-1 to 4.4-430 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Tables 4.4-1 to 4.4-4
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Tables 4.5-1 to 4.5-2 (Deleted)30 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Tables 4.5-1 to 4.5-2 (Deleted)
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Figures 5.1-1 to 5.1-1330 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Figures 5.1-1 to 5.1-13
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Figures 5.2-1 to 5.2-2430 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Figures 5.2-1 to 5.2-24
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems30 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected SystemsReactor Vessel Water Level
Hydrostatic
Pressure Boundary Leakage
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Sections 5.1 to 5.1-830 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Sections 5.1 to 5.1-8Safe Shutdown Earthquake
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Sections 5.2.1 to 5.2-7530 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Sections 5.2.1 to 5.2-75Safe Shutdown
Tornado Missile
Hydrostatic
Design basis earthquake
Earthquake
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Power change
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Sections 5.3.1 to 5.3-230 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Sections 5.3.1 to 5.3-2
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Table 5.1-1, System Design and Operating Parameters30 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Table 5.1-1, System Design and Operating Parameters
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Tables 5.2-1 to 5.2-4230 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Tables 5.2-1 to 5.2-42Safe Shutdown
Boric Acid
Hydrostatic
Operating Basis Earthquake
Design basis earthquake
Earthquake
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 14.6-1 Through 14.6-230 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 14.6-1 Through 14.6-2
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 15.1-1 Through 15.1-930 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 15.1-1 Through 15.1-9
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 15.2-1 Through 15.2-4630 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 15.2-1 Through 15.2-46Fuel cladding
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 15.3-1 Through 15.3-6830 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 15.3-1 Through 15.3-68
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.7.1 Through 3.7-1330 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.7.1 Through 3.7-13Operating Basis Earthquake
Design basis earthquake
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.9-1 Through 3.9-230 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.9-1 Through 3.9-2
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3A-1 Through 3A-430 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3A-1 Through 3A-4
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 7.6-130 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 7.6-1
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 8.2-1 (Intentionally Deleted) and Figure 8.2-230 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 8.2-1 (Intentionally Deleted) and Figure 8.2-2
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 10.2-1 to 10.2-4 Intentionally Deleted30 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 10.2-1 to 10.2-4 Intentionally Deleted
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 10.3-1A Sheets 1 Through 6 of 6 Intentionally Deleted to 10.3-3, Sheets 1 & 230 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 10.3-1A Sheets 1 Through 6 of 6 Intentionally Deleted to 10.3-3, Sheets 1 & 2
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 10.4-1 Sheets 1 & 2 of 2, Intentionally Deleted to 10.4-1930 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 10.4-1 Sheets 1 & 2 of 2, Intentionally Deleted to 10.4-19
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 11.2-1A Sheets 1 Through 5 of 5 to 11.2-1B Intentionally Deleted30 January 2017Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 11.2-1A Sheets 1 Through 5 of 5 to 11.2-1B Intentionally Deleted