LR-N05-0336, Request for Changes to Technical Specifications Relocation of Response Time Testing Time Limits to the Updated Final Safety Analysis Report | 19 August 2005 | Request for Changes to Technical Specifications Relocation of Response Time Testing Time Limits to the Updated Final Safety Analysis Report | Shutdown Margin Packing leak |
LR-N12-0156, Submittal of Updated Final Safety Analysis Report, Revision 26, Salem Units 1 & 2 Technical Specification Bases Changes, 10 CFR 54.37(b) Review Results and PSEG Nuclear LLC Quality Assurance Topical Report, NO-AA-10, Revision 82 | 21 May 2012 | Submittal of Updated Final Safety Analysis Report, Revision 26, Salem Units 1 & 2 Technical Specification Bases Changes, 10 CFR 54.37(b) Review Results and PSEG Nuclear LLC Quality Assurance Topical Report, NO-AA-10, Revision 82 | Safe Shutdown Boric Acid Time of Discovery Shutdown Margin Packing leak High Radiation Area Ultimate heat sink Non-Destructive Examination Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Hydrostatic Operating Basis Earthquake Nondestructive Examination Cyber Security Incorporated by reference B.5.b Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Design basis earthquake Annual Radiological Environmental Operating Report Process Control Program Safeguards Contingency Plan License Renewal Fuel cladding Pressure Boundary Leakage Offsite Circuit Fire Protection Program Power change Unidentified leakage |
LR-N17-0034, Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.8-1 Through 3.8-56 | 30 January 2017 | Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.8-1 Through 3.8-56 | |
LR-N17-0034, Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 6.3-1A Through 6.3-4 | 30 January 2017 | Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 6.3-1A Through 6.3-4 | |
LR-N17-0034, Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.1-1 Through 9.1-9 | 30 January 2017 | Redacted - Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 9.1-1 Through 9.1-9 | |
LR-N17-0034, Redacted Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 5.5-1 Through 5.5-7 | 30 January 2017 | Redacted Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 5.5-1 Through 5.5-7 | |
LR-N17-0034, Redacted-Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Section 2.2, Nearby Industrial, Transportation, and Military Facilities | 30 January 2017 | Redacted-Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Section 2.2, Nearby Industrial, Transportation, and Military Facilities | |
LR-N17-0034, Redacted-Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Section 3.6, Figure 3.6-1 Through Figure 3.6-30 | 30 January 2017 | Redacted-Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Section 3.6, Figure 3.6-1 Through Figure 3.6-30 | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Appendix 15.3A, Generic Small Break Analysis | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Appendix 15.3A, Generic Small Break Analysis | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Appendix 3.6A, Description of Backdraft Damper | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Appendix 3.6A, Description of Backdraft Damper | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Appendix 3.9A, Bolted Connections for Linear Component Support | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Appendix 3.9A, Bolted Connections for Linear Component Support | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Appendix 3A, Pse&G Positions on Us NRC Regulatory Guides | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Appendix 3A, Pse&G Positions on Us NRC Regulatory Guides | Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Weld Overlay Coatings Temporary Modification Earthquake Turbine Missile Liquid penetrant Pressure Boundary Leakage Fire Protection Program |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Appendix 7A, Program Element Descriptions Resulting from the Implementation of the May 6, 1983 Order | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Appendix 7A, Program Element Descriptions Resulting from the Implementation of the May 6, 1983 Order | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Appendix a, TMI Lesson Learned | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Appendix a, TMI Lesson Learned | Boric Acid Reactor Vessel Water Level Loop seal Grab sample Anticipated operational occurrence Unidentified leakage |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 15, Figures 15.4-2 to 15.4-111 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 15, Figures 15.4-2 to 15.4-111 | Fuel cladding |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 15, Section 15.5, Anticipated Transients Without Scram | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 15, Section 15.5, Anticipated Transients Without Scram | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 17, Figures 17.2-1 to 17.2-4 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 17, Figures 17.2-1 to 17.2-4 | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.2-1 to 4.2-25 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.2-1 to 4.2-25 | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.3-1 to 4.3-35 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.3-1 to 4.3-35 | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.4-1 to 4.4-17 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.4-1 to 4.4-17 | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.4.1 to 4.4-66d | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.4.1 to 4.4-66d | Hydrostatic Power change Flow Induced Vibration |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.5-1 to 4.5-4 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.5-1 to 4.5-4 | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Section 4.5, Reload Analyses | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Section 4.5, Reload Analyses | Shutdown Margin |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Sections 4.3.1 to 4.3-61 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Sections 4.3.1 to 4.3-61 | Boric Acid Shutdown Margin Power change |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Sections 5.4.1 to 5.4-14 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Sections 5.4.1 to 5.4-14 | Boric Acid Hydrostatic |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Tables 4.2-1 to 4.2-2 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Tables 4.2-1 to 4.2-2 | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Tables 4.3-1 to 4.3-11 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Tables 4.3-1 to 4.3-11 | Shutdown Margin |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Tables 4.4-1 to 4.4-4 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Tables 4.4-1 to 4.4-4 | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Tables 4.5-1 to 4.5-2 (Deleted) | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Tables 4.5-1 to 4.5-2 (Deleted) | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Figures 5.1-1 to 5.1-13 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Figures 5.1-1 to 5.1-13 | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Figures 5.2-1 to 5.2-24 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Figures 5.2-1 to 5.2-24 | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems | Reactor Vessel Water Level Hydrostatic Pressure Boundary Leakage |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Sections 5.1 to 5.1-8 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Sections 5.1 to 5.1-8 | Safe Shutdown Earthquake |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Sections 5.2.1 to 5.2-75 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Sections 5.2.1 to 5.2-75 | Safe Shutdown Tornado Missile Hydrostatic Design basis earthquake Earthquake Fuel cladding Liquid penetrant Pressure Boundary Leakage Power change |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Sections 5.3.1 to 5.3-2 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Sections 5.3.1 to 5.3-2 | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Table 5.1-1, System Design and Operating Parameters | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Table 5.1-1, System Design and Operating Parameters | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Tables 5.2-1 to 5.2-42 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 5, Tables 5.2-1 to 5.2-42 | Safe Shutdown Boric Acid Hydrostatic Operating Basis Earthquake Design basis earthquake Earthquake |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 14.6-1 Through 14.6-2 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 14.6-1 Through 14.6-2 | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 15.1-1 Through 15.1-9 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 15.1-1 Through 15.1-9 | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 15.2-1 Through 15.2-46 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 15.2-1 Through 15.2-46 | Fuel cladding |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 15.3-1 Through 15.3-68 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 15.3-1 Through 15.3-68 | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.7.1 Through 3.7-13 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.7.1 Through 3.7-13 | Operating Basis Earthquake Design basis earthquake |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.9-1 Through 3.9-2 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3.9-1 Through 3.9-2 | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3A-1 Through 3A-4 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 3A-1 Through 3A-4 | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 7.6-1 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 7.6-1 | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 8.2-1 (Intentionally Deleted) and Figure 8.2-2 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figure 8.2-1 (Intentionally Deleted) and Figure 8.2-2 | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 10.2-1 to 10.2-4 Intentionally Deleted | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 10.2-1 to 10.2-4 Intentionally Deleted | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 10.3-1A Sheets 1 Through 6 of 6 Intentionally Deleted to 10.3-3, Sheets 1 & 2 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 10.3-1A Sheets 1 Through 6 of 6 Intentionally Deleted to 10.3-3, Sheets 1 & 2 | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 10.4-1 Sheets 1 & 2 of 2, Intentionally Deleted to 10.4-19 | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 10.4-1 Sheets 1 & 2 of 2, Intentionally Deleted to 10.4-19 | |
LR-N17-0034, Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 11.2-1A Sheets 1 Through 5 of 5 to 11.2-1B Intentionally Deleted | 30 January 2017 | Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Figures 11.2-1A Sheets 1 Through 5 of 5 to 11.2-1B Intentionally Deleted | |