Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML010460230 | 26 February 2001 | Issuance of License Amendment 195 New Sump Pump System in Engineered Safety Features Building (Tac No. MA9365) | Hydrostatic Maintenance Rule Program |
ML012920217 | 20 September 1996 | License Amendment, Issuance of Amendment Relating to Performance-Base Containment Leakage Testing - (TAC M945057) | |
ML013310523 | 4 January 2002 | Issuance of Amendment Emergency Diesel Generator Allowed Outage Time (Tac No. MB2196) | |
ML013370406 | 1 February 2002 | Issuance of Amendment 264 Revising the Technical Specifications and Bases Related to Reactor Coolant Pump Flywheel Inspection Requirements and Reactor Coolant System Structural Integrity (Tac No. MB1818) | Probabilistic Risk Assessment |
ML013440338 | 11 January 2002 | Issuance of Amendment 263 Changes to TS Definitions for Core Alteration & Refueling Operations (Tac No. MB1779) | Reactor Vessel Water Level |
ML020520225 | 20 February 2002 | Issuance of Amendment, Fuel Handling Accidents Inside Containment and Ventilation Systems (Tac No. MA9364) | Reactor Vessel Water Level |
ML020660079 | 29 April 2002 | Issuance of Amendment Re Steam Generator Tube Rupture Radiological Dose Consequences (Tac No. MB0866) | |
ML020700197 | 9 May 2002 | Completion of Staff Review Related to Ampacity Derating Issues Associated with Generic Letter 92-08 | Safe Shutdown Fire Barrier |
ML020730271 | 22 March 2002 | Safety Evaluation of Relief Request RR-89-35, Temporary Installation of Mechanical Seal Assemblies on Preesurizer Heater Penetration Nozzles (Tac No. MB4039) | Boric Acid VT-2 Incorporated by reference Code Reconciliation Pressure Boundary Leakage |
ML020870765 | 8 May 2002 | Issuance of Amendments Relocating Various Reactor Coolant System Technical Specifications to the Respective Unit'S Technical Requirements Manual (Tac Nos. MB2273 and MB2240) | Probabilistic Risk Assessment Incorporated by reference |
ML021050398 | 15 May 2002 | Issuance of Amendment Containment Airlock (Tac No. MB2930) | |
ML021210592 | 7 June 2002 | Issuance of Amendment Containment Air Lock | |
ML021570380 | 24 July 2002 | License Amendment 206, Changing the Term in TS Once Each Refueling Interval to Once Per 24 Months in Several Surveillance Requirements | Probabilistic Risk Assessment |
ML021680298 | 30 July 2002 | Amendment 207 to NPF-49, Relocating Control Rod Position Indication System Requirements to Technical Requirements Manual | Probabilistic Risk Assessment |
ML021900577 | 7 August 2002 | Issuance of License Amendment Safety Injection Tanks | |
ML022000322 | 17 September 2002 | License Amendment, Incorporate Administrative & Editorial Changes (TAC Nos. MB3394, MB3395 & MB3396) | |
ML022030480 | 20 August 2002 | Code Relief, Relief from ASME Code Requirements Related to the Inservice Inspection Program, Second 10-Year Interval, Relief Request IR-2-21 Through IR-2-26 | High Radiation Area Incorporated by reference Dissimilar Metal Weld Scaffolding |
ML022040154 | 21 August 2002 | Issuance of Amendment No. 209, Reactor Coolant System Operational Leakage (Tac No. MB3126) | Probabilistic Risk Assessment |
ML022170673 | 23 August 2002 | Review of Steam Generator Tube Inservice Inspection Report for the 2001 Oustage | Nondestructive Examination |
ML022260415 | 8 August 2002 | Issuance of License Amendments Physical Protection License Condition and Plant Name | Safe Shutdown Fire Protection Program |
ML022280126 | 2 October 2002 | Safety Evaluation of Relief Requests RR-89-34 and RR-89-36, Repair of Reactor Pressure Vessel Head Penetration Nozzles | Boric Acid Non-Destructive Examination Hydrostatic Nondestructive Examination Incorporated by reference Finite Element Analysis Liquid penetrant Dissimilar Metal Weld |
ML022390118 | 26 August 2002 | License Amendment, Increase Emergency Diesel Generator Allowed Outage Time, MB31255 | Safe Shutdown Internal Flooding Probabilistic Risk Assessment Reserve Station Service Transformer Large early release frequency Earthquake Maintenance Rule Program Offsite Circuit |
ML022470399 | 16 September 2002 | License Amendment, Revise Final Safety Analysis Report Licensing Basis for Post-Accident Operation of Supplementary Leakage Collection & Release System | Emergency Lighting |
ML022480082 | 15 October 2002 | Issuance of Amendment 271 Missed Surveillances Using Consolidated Line Item Improvement Process | Enforcement Discretion Probabilistic Risk Assessment Missed surveillance Large early release frequency |
ML022480369 | 5 September 2002 | Request for Approval of a Quality Assurance Program Change Related to the Frequency of Review by the Independent Review Team | |
ML022670388 | 25 November 2002 | License Amendment No. 197, Approve License Termination Plan, TAC No. MA9791 | Offsite Dose Calculation Manual Fuel cladding |
ML023230024 | 15 November 2002 | Issuance of Amendment, Missed Surveillances Using Consolidated Line-Item Improvement Process | Enforcement Discretion Probabilistic Risk Assessment Missed surveillance Large early release frequency |
ML030030636 | 2 January 2003 | Units, 2 and 3, License Amendments, Relocate Selected Millstone Unit 2 and 3 Technical Specification Related to the Reactor Coolant System and Plant Systems to the Technical Requirements Manual, TAC MB4066 and MB4067 | Probabilistic Risk Assessment |
ML030440532 | 13 February 2003 | Issuance of Amendment No. 273, Revising Surveillance Requirements Associated with Containment Isolation Valves (Civs), Reactor Building Closed Cooling Water (RBCCW) System & Service Water (SW) System | Safe Shutdown Power-Operated Valves |
ML030550672 | 24 February 2003 | Relief Request V-6, Extend Surveillance Interval for Seat Leakage Testing of Category a Valves & Relief Request V-7, Extend Surveillance Interval for Pressure Relief Valves, MB6482 & MB6483 | Incorporated by reference |
ML030560496 | 15 May 2003 | License Amendment, Issuance of Amendment, Changes to Selected Radiological-Related Technical Specifications | Time of Discovery High Radiation Area Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Deep Dose Equivalent |
ML030910485 | 1 April 2003 | License Amendment, Issuance of Amendment Spent Fuel Pool Requirements | |
ML030990340 | 7 May 2003 | Issuance of Amendment No. 275, Revising Technical Specification 3.7.1.1, to Reflect Results of a Reanalysis of Overpressurization Events to Allow Plant Operation, at Corresponding Reduced Power Levels as Listed | |
ML031110009 | 25 July 2003 | Issuance of Amendment No. 278, Revising the Technical Specifications Related to Containment Systems | High Radiation Area |
ML031110416 | 21 April 2003 | Yankee Nuclear Power Station - Issuance of Amendment No. 157 Deletion of Operational and Administrative Requirements Following Fuel Transfer to ISFSI | High Radiation Area Process Control Program Fire Protection Program |
ML031390378 | 15 May 2003 | License Amendment, Change to Selected Radiological-Related Technical Specifications | Time of Discovery High Radiation Area Offsite Dose Calculation Manual Process Control Program Deep Dose Equivalent |
ML031640541 | 25 July 2003 | Issuance of License Amendment 277 Emergency Diesel Generator Testing Requirements | Offsite Circuit |
ML031670914 | 29 September 2003 | Issuance of Amendment No. 216, Revising the Technical Specifications Related to Containment System | High Radiation Area |
ML031880182 | 29 July 2003 | Issuance of License Amendment 279 Electrical Power Systems - D.C. Distribution | Probabilistic Risk Assessment |
ML031900203 | 25 September 2003 | Issuance of Amendment No. 281, Revising Technical Specification 6.9.1.8 to Update the List of Documents That Describe the Analytical Methods Used to Determine Core Operating Limits | |
ML032130014 | 25 September 2003 | License Amendment, Issuance of Amendment, Reactivity Control Systems, Power Distribution Limits, and Special Test Exceptions | Shutdown Margin Anticipated operational occurrence Probabilistic Risk Assessment Power change |
ML032270057 | 25 September 2003 | License Amendment, Limiting Safety System Settings and Instrumentation | Probabilistic Risk Assessment |
ML032330392 | 1 October 2003 | Changes to the Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedule | |
ML032390710 | 10 September 2003 | Review of Steam Generator Tube Inservice Inspection Reports for T He 2002 Outage | |
ML032530013 | 1 December 2003 | Proposed Emergency Plan Changes | |
ML032600096 | 1 December 2003 | Proposed Emergency Plan Changes | |
ML032690641 | 14 October 2003 | Relief Request Review, Relaxation of the Requirements of Order EA-03-009 Regarding Reactor Pressure Vessel Head Inspections | Nondestructive Examination |
ML032690717 | 22 October 2003 | Relief Request Review, Safety Evaluation of Relief Request RR-89-42, Visual Examination of Pressure-Retaining Surfaces of the Reactor Vessel Bottom Head Area | Boric Acid Hydrostatic VT-2 |
ML032690807 | 28 October 2003 | Relief Request Review, Safety Evaluation of Relief Request RR-89-43, Temporary Installation of Mechanical Nozzle Seal Assemblies on Pressurizer Heather Penetration Nozzles | Boric Acid VT-2 Incorporated by reference Code Reconciliation Pressure Boundary Leakage |
ML033080003 | 7 January 2004 | Relief Request Review, Second 10-Year Interval Inservice Inspection Plan, Request for Relief IR-2-27 | Nondestructive Examination Incorporated by reference |