Issue date | Title | Topic | |
---|---|---|---|
ML20042F108 | 31 December 1989 | Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan:Perry Nuclear Power Plant,Unit 1. | Incorporated by reference |
ML20054E567 | 31 May 1982 | Control of Heavy Loads at Nuclear Power Plants,Perry Nuclear Power Plant Units 1 & 2,Cleveland Electric Illuminating Co, Draft | Safe Shutdown Control of Heavy Loads |
ML20072D979 | 15 June 1994 | Ipe:Step 1 Front-End Audit | Internal Flooding |
ML20072E032 | 30 June 1994 | Plant TER of IPE Submittal,Human Reliability Analysis,Draft Rept | Internal Flooding Probabilistic Risk Assessment Time Critical Operator Action |
ML20080A661 | 30 September 1994 | Technical Evaluation Rept:Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01 | Reactor Vessel Water Level |
ML20090K290 | 31 August 1989 | Final Technical Evaluation Rept on Response from Cleveland Electric Illuminating Co to Generic Ltr 88-01 Pertaining to Perry Nuclear Power Plant | Packing leak Weld Overlay Pressure Boundary Leakage |
ML20100B273 | 30 April 1983 | Control of Heavy Loads at Nuclear Power Plants,Cleveland Electric Illuminating Co,Perry Nuclear Power Plant,Units 1 & 2 (Phase I) | Safe Shutdown Control of Heavy Loads |
ML20101D241 | 30 November 1984 | Audit of Pump & Valve Operability Assurance Program for Perry Nuclear Power Plant Unit 1 | Anchor Darling Scram Discharge Volume |
ML20101N132 | 30 November 1984 | Sqrt Visit Rept, Informal Rept | Safe Shutdown Earthquake Finite Element Analysis Earthquake |
ML20107M635 | 28 February 1985 | Review of Operability & Reliability of Tdi Diesel Generators at Perry Nuclear Power Plant Unit 1, Technical Evaluation Rept | Nondestructive Examination Liquid penetrant |
ML20115G813 | 31 March 1985 | Demonstration of Containment Purge & Vent Valve Operability for Perry Nuclear Power Plant,Units 1 & 2, Informal Rept | |
ML20126E986 | 31 May 1985 | Review of Emergency Diesel Generator Engine & Auxiliary Module Wiring & Terminations, Technical Evaluation Rept | |
ML20128H779 | 30 June 1985 | Rev 1 to Review of Engine Base & Bearing Caps for Tdi DSRV-12,DSRV-16 & DSRV-20 Diesel Engines, Technical Evaluation Rept | |
ML20133P948 | 10 July 1985 | Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28...,Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Util, Draft Technical Evaluation Rept | |
ML20134J846 | 8 August 1985 | Rev 1 to Technical Evaluation Rept of Dcrdr for Cleveland Electric Illuminating Co,Perry Nuclear Power Plant Unit 1 | |
ML20136F653 | 31 December 1985 | Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept | Nondestructive Examination |
ML20206L894 | 31 August 1986 | Rev 1 to Review of Effect of 860131 Earthquake on Perry Nuclear Power Plant | Safe Shutdown Earthquake Earthquake |
ML20207S510 | 30 November 1985 | Technical Evaluation Rept for Perry Nuclear Power Plant on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) | Hydrostatic |
ML20210T251 | 19 April 1999 | Technical Evaluation Rept,Second Ten-Year Interval Pump & Valve Inservice Testing Program, for Perry Nuclear Power Plant | Safe Shutdown Stroke time Incorporated by reference Scram Discharge Volume Cold shutdown justification Power-Operated Valves Pressure Boundary Leakage Grace period |
ML20212H299 | 31 August 1986 | Rev 1 to Review of Effect of 860131 Earthquake on Perry Nuclear Power Plant | Safe Shutdown Earthquake Earthquake |
ML20215M066 | 31 May 1987 | Final Conformance to Generic Ltr 83-28,Item 2.2.2--Vendor Interface Programs for All Other Safety-Related Components: Perry Unit 1, Informal Rept | |
ML20235V152 | 31 August 1987 | Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 | |
ML20245A448 | 30 September 1986 | Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 | |
NRC-92-1106, Step 1 TER of Perry IPE Back End Submittal,Final Rept | 30 June 1994 | Step 1 TER of Perry IPE Back End Submittal,Final Rept |