Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20127P426 | 28 June 1985 | PNS-I-85-009:on 850626,alcohol Discovered in Device Used to Measure Absorption of Moisture During Fabrication of Commercial Nuclear Fuel Rods.Sabotage Initially Suspected. Subsequent Info Indicated Contamination Due to Leak | |
ML20133K909 | 17 October 1985 | PNS-I-85-014:on 851017,licensee Notified Region I That Reconciliation of Low Enriched U Inventory Period Ending Sept 1985 Indicated Inventory Difference Exceeded Error Limit.Cause Unknown.Reconciliation Continuing | |
ML20134H791 | 27 August 1985 | PNS-I-85-012:on 850826,shipment of Eight Sample Vials Containing 99 G U Reported Overdue at Hematite,Mo Plant. Samples Mailed on 850723.Mail Loss Rept Filed W/Post Ofc | |
PNO-I-87-101, on 871005-09 & 19-23,programmatic Deficiencies Identified in Radiological Controls During Insp at Plant. Caused by Degraded Plant Conditions.Confirmatory Action Ltr Issued to Address Severe Plant Problems in Program | 28 October 1987 | PNO-I-87-101:on 871005-09 & 19-23,programmatic Deficiencies Identified in Radiological Controls During Insp at Plant. Caused by Degraded Plant Conditions.Confirmatory Action Ltr Issued to Address Severe Plant Problems in Program | |
PNO-I-87-103, on 871105,licensee Discovered Radiation Levels of Up to 0.4 Mrem/H in Unrestricted Area.Contamination Appeared to Be in Soil.Licensee Immediately Restricted Access to & Posted Area | 6 November 1987 | PNO-I-87-103:on 871105,licensee Discovered Radiation Levels of Up to 0.4 Mrem/H in Unrestricted Area.Contamination Appeared to Be in Soil.Licensee Immediately Restricted Access to & Posted Area | |
PNO-I-88-069, on 880630,fuel Fabrication Facility Employees Went on Strike.Fuel Fabrication Facility in Process of Shutting Down for Holiday Weekend.Contingency Plans Re Site Security Implemented & No Addl Bargain Sessions Scheduled | 1 July 1988 | PNO-I-88-069:on 880630,fuel Fabrication Facility Employees Went on Strike.Fuel Fabrication Facility in Process of Shutting Down for Holiday Weekend.Contingency Plans Re Site Security Implemented & No Addl Bargain Sessions Scheduled | |
PNO-I-88-082, on 880812,loss of Offsite Electrical Power Occurred.Cause Not Stated.Inspector Will Be on Site on 880815 to Review Status of Facility | 12 August 1988 | PNO-I-88-082:on 880812,loss of Offsite Electrical Power Occurred.Cause Not Stated.Inspector Will Be on Site on 880815 to Review Status of Facility | |
PNO-I-88-089, on 880825,facility Lost Offsite Electrical Power.Caused by Tree Falling Across Electrical Wires Leading Into Facility.Operations at Facility Terminated,Employees Sent Home & Monitoring Sys Switched to Emergency Power | 25 August 1988 | PNO-I-88-089:on 880825,facility Lost Offsite Electrical Power.Caused by Tree Falling Across Electrical Wires Leading Into Facility.Operations at Facility Terminated,Employees Sent Home & Monitoring Sys Switched to Emergency Power | |
PNO-I-93-002, on 930106,small Fire Noticed in Wall Mounted Air Conditioning Unit in Coring Room.Caused by Buildup & Ignition of Zirconium Fines.State of CT Informed | 6 January 1993 | PNO-I-93-002:on 930106,small Fire Noticed in Wall Mounted Air Conditioning Unit in Coring Room.Caused by Buildup & Ignition of Zirconium Fines.State of CT Informed |