Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20056D957 | 29 July 1993 | Informs That NRR Will Conduct Insp at GE Nuclear Energy Ofcs in San Jose,Ca on 930809-13.Insp Will Review QA Programs & Controls Implemented During Tests Conducted at gravity-driven Cooling Sys Integral Sys Test Facility | License Renewal |
ML20056G753 | 1 September 1993 | Provides Summary of Most Significant Insp Findings in Advance of Insp Rept So That Appropriate & Timely Corrective Action Can Be Taken,Per Insp Rept 99900403/93-01 on 930809- 13 | License Renewal Backfit |
ML20056H139 | 23 August 1993 | Forwards K Jones Describing Quality Deficiencies Re GE Testing Activities at Inel Gist Facility | License Renewal |
ML20057D227 | 27 September 1993 | Forwards for Review & Comment,Draft Rept Prepared by Llnl Entitled a Defense-in-Depth & Diversity Assessment of GE Sbwr Protection Sys,Task 12. Requests Comments Be Provided within 30 Days of Ltr Receipt | |
ML20057E205 | 20 August 1993 | Forwards Request for Addl Info Re Simplified BWR Design, Specifically Giraffe Testing Program & Panthers Facility (Q950.1-Q950.26) | |
ML20058A811 | 18 November 1993 | Forwards Notice of Nonconformance & Insp Rept 52-004/93-01 on 930809-13 | |
ML20058L223 | 9 November 1993 | Forwards Request for Addl Info on Simplified BWR Design Certification.Response Requested within 90 Days of Ltr Date | High Radiation Area Anticipated operational occurrence License Renewal Overexposure |
ML20058N150 | 1 September 1993 | Forwards Request for Addl Info Re Simplified BWR Design Certification.Response Requested within 90 Days of Ltr Date | |
ML20058N153 | 26 August 1993 | Forwards Request for Addl Info Re Simplified BWR Design, Specifically Neutronic Info (Q440.1-Q440.5).Response Requested within 60 Days of Ltr Date | |
ML20059D200 | 29 November 1993 | Forwards Request for Addl Info Re Sbwr Design Certification & Requests That Written Response to Encl Questions Be Provided within 60 Days of Dtd Ltr | |
ML20059D221 | 26 November 1993 | Forwards Request for Addl Info Re Sbwr Design Certification & Requests That Response to Encl Questions Be Provided within 30 Days of Dtd Ltr | Probabilistic Risk Assessment |
ML20059F896 | 28 September 1993 | Requests for Addl Info to Support Review Activities Re Sbwr Design Certification | |
ML20059F903 | 15 September 1993 | Requests Addl Info Needed to Support Review Re Sbwr Design Certification.Response Requested within 120 Days of Ltr Date | |
ML20059K315 | 9 November 1993 | Discusses GE Relief from NRC Metrication Policy for Both ABWR & Sbwr Designs | Exemption Request |
ML20062J425 | 28 September 1993 | Requests for Addl Info to Support Review Activities Re Sbwr Design Certification.Record Copy | |
ML20126A436 | 15 December 1992 | Advises That NRC Must Review Modified Tracg Computer Code for thermal-hydraulic Analyses Prior to Acceptance of Design Certification for Simplified Bwr.Initial Survey of Tracg Must Be Arranged in Jan 1993 | |
ML20128B428 | 28 January 1993 | Forwards Requests for Info for Simplified BWR Design Application | Safe Shutdown Shutdown Margin High Radiation Area Internal Flooding Probabilistic Risk Assessment Coatings Squib Incorporated by reference License Renewal Earthquake Power-Operated Valves Liquid penetrant |
ML20128G018 | 9 February 1993 | Forwards SECY-92-339, Evaluation of GE Test Program to Support Design Certification for Simplified Bwr | Squib |
ML20128H497 | 7 October 1996 | Advises That GE Giraffe Sys Apparent Test Results Repts Will Be Withheld from Public Disclosure Ref 10CFR2.790,per 960321 Request | |
ML20128H514 | 7 October 1996 | Informs That Licensee 951212 Request That GE Panda steady- State Tests S1 Through S6 Pcc Performance Apparent Test Results,Rev 1 Be Withheld from Public Disclosure,Per 10CFR2.790,granted | |
ML20128H530 | 7 October 1996 | Informs That Licensee 960314 Request to Withhold GE Girafee Helium Tests Apparent Test Results Repts & Data Transmittal for Giraffe Helium Tests H3 & H4 from Public Disclosure,Per 10CFR2.790,granted | |
ML20129C288 | 21 October 1996 | Informs of Review & Determination That Info Identified in Apparent Test Results Contain Trade Secrets or Proprietary Commercial Info & Will Be Withheld from Public Disclosure | |
ML20129E636 | 1 October 1996 | Advises That GE Panda Transient Integral Test Data Transmittal Repts Will Be Withheld from Public Disclosure Ref 10CFR2.790,per 960816 Request | |
ML20129E868 | 1 October 1996 | Informs That Licensee 960222 Request to Withhold GE Panda Steady-State Tests S10-S13 Performance from Public Disclosure Per 10CFR2.790.Request Denied Because No Affidavit Was Submitted | |
ML20129E883 | 2 October 1996 | Informs That GE Panda Steady-State Tests Data Transmittal Rept Will Be Withheld from Public Disclosure,Per 10CFR2.790 (b)(5) & Section 103(b) of AEA of 1954,as Amended | |
ML20129F503 | 3 October 1996 | Advises That Info Submitted in 960109 Rept Entitled, Post-Test Calculations of Panda Pcc Steady-State Test, Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEC of 1954 | |
ML20129F506 | 3 October 1996 | Advises That Info Submitted in 960109 Rept Entitled, Panther/Ic Apparent Test Results Phase 3, Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEC of 1954 | |
ML20129F618 | 2 October 1996 | Advises That Giraffe Sbwr Sys Interactions Test Rept Will Be Withheld from Public Disclosure Ref 10CFR2.790, Per 960617 Request | |
ML20129F634 | 2 October 1996 | Advises That Panthers/Ic Atrs Will Be Withheld from Public Disclosure Ref 10CFR2.790,per 960222 Request | |
ML20129G584 | 2 October 1996 | Advises That,Data Transmittal for Giraffe Helium Tests H1 & H2,as Requested by Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of 1954 AEA | |
ML20129G631 | 1 October 1996 | Advises That Giraffe Helium Series Test Rept,As Requested by Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of 1954 AEA | |
ML20134F386 | 1 November 1996 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp 99900403/96-01 on 960708 | |
ML20134L318 | 19 November 1996 | Advises That GE Pathers/Ic ATRs Submitted w/951025 Ltr Will Be Withheld from Public Disclosure Ref 10CFR2.790,based on Review of Listed Reasons for Maintaining Info as Proprietary | |
ML20247M691 | 18 May 1998 | Forwards Staff Review of Rept, Giraffe Sbwr Sys Interactions Test Rept, (NEDC-3254OP,Revision-0).Informs That Review of Sbwr Was Terminated in 1996 | |
ML20247M702 | 18 May 1998 | Forwards Staff Review of General Electric Panthers - IC Test Rept (Siet 00458RP95).Informs That Sbwr Was Terminated in 1996 | |
ML20248E199 | 28 May 1998 | Informs That Staff Has Identified Six Ltrs (Enclosed) to GE Re Potential Proprietary Disclosure.Ltrs Specifically Requested That GE Review Encl to Determine If Contained GE Proprietary Info.Encl Withheld | Squib |
ML20248F389 | 31 July 1996 | Forwards Rept on Staff Evaluation of GE Tracg Model Description,Rev 1,related to Containment Area,In Response to |