RS-02-034, Withdrawal of Request for NRC Approval of Physical Security & Guard Force Training & Qualification Plan Changes | 13 February 2002 | Withdrawal of Request for NRC Approval of Physical Security & Guard Force Training & Qualification Plan Changes | |
RS-02-055, Response to Commission Order to Modify License for Interim Safeguards & Security Measures | 15 March 2002 | Response to Commission Order to Modify License for Interim Safeguards & Security Measures | |
RS-02-059, Submittal of Security Plan, Revision 67 for LaSalle County Station, Units 1 & 2. No Enclosures | 25 March 2002 | Submittal of Security Plan, Revision 67 for LaSalle County Station, Units 1 & 2. No Enclosures | |
RS-02-071, Request for Approval of Quality Assurance Program Changes for Exelon Generation Company, LLC, and Amergen Energy Company, LLC, Nuclear Power Plants | 9 April 2002 | Request for Approval of Quality Assurance Program Changes for Exelon Generation Company, LLC, and Amergen Energy Company, LLC, Nuclear Power Plants | Safe Shutdown Shutdown Margin Non-Destructive Examination Offsite Dose Calculation Manual Commercial Grade Dedication Safe Shutdown Earthquake Coatings Nondestructive Examination Temporary Modification Incorporated by reference Condition Adverse to Quality Process Control Program Operability Determination Maintenance Rule Program Liquid penetrant Fire Protection Program Early Warning Fire Detection |
RS-02-074, Second 10-Year Inservice Inspection Interval End Dates | 9 April 2002 | Second 10-Year Inservice Inspection Interval End Dates | |
RS-02-110, Request for Amendment to Technical Specifications Table 3.3.8.1-1, Loss of Power Instrumentation. | 8 July 2002 | Request for Amendment to Technical Specifications Table 3.3.8.1-1, Loss of Power Instrumentation. | Reactor Vessel Water Level |
RS-02-122, Justification for Continued Use of Technical Specifications, Section 3.4.11, RCS Pressure & Temperature (P/T) Limits. | 19 July 2002 | Justification for Continued Use of Technical Specifications, Section 3.4.11, RCS Pressure & Temperature (P/T) Limits. | |
RS-02-123, Response to Regulatory Issue Summary 2002-09, Preparation and Scheduling of Operator Licensing Examinations. | 18 July 2002 | Response to Regulatory Issue Summary 2002-09, Preparation and Scheduling of Operator Licensing Examinations. | Generic Fundamentals Examination |
RS-02-140, Supplemental Response to Commission Order to Modify License for Interim Safeguards and Security Measures for Interim Compensatory Measure B.4.e | 1 August 2002 | Supplemental Response to Commission Order to Modify License for Interim Safeguards and Security Measures for Interim Compensatory Measure B.4.e | |
RS-02-146, Revised Supplemental Response to Commission Order to Modify License for Interim Safeguards & Security Measures for Interim Compensatory Measure B.4.e | 14 August 2002 | Revised Supplemental Response to Commission Order to Modify License for Interim Safeguards & Security Measures for Interim Compensatory Measure B.4.e | |
RS-02-148, Long Term Solution Stability System Oscillation Power Range Monitor Revised Implementation Plan | 27 August 2002 | Long Term Solution Stability System Oscillation Power Range Monitor Revised Implementation Plan | |
RS-02-158, Confirmation of Completion of Actions Implementing the Interim Compensatory Measures of the February 25, 2002, Commission Order to Modify License for Interim Safeguards and Security Measures | 12 September 2002 | Confirmation of Completion of Actions Implementing the Interim Compensatory Measures of the February 25, 2002, Commission Order to Modify License for Interim Safeguards and Security Measures | |
RS-02-160, Request for Amendment to TS 5.6.5, Core Operating Limits Report for Addition of New Analytical Methodology | 19 September 2002 | Request for Amendment to TS 5.6.5, Core Operating Limits Report for Addition of New Analytical Methodology | |
RS-02-164, Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program. | 24 October 2002 | Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program. | Safe Shutdown High winds Fire Barrier Tornado Missile Internal Flooding Probabilistic Risk Assessment Coatings Tornado Generated Missile Large early release frequency Earthquake Maintenance Rule Program Turbine Missile |
RS-02-165, Response to Request for Additional Information Re Excess Flow Check Valve Testing Surveillance and Relief Request RV-12 | 4 October 2002 | Response to Request for Additional Information Re Excess Flow Check Valve Testing Surveillance and Relief Request RV-12 | |
RS-02-167, Request for Amendment to Technical Specifications Justification for the Continued Use of Technical Specifications, Section 3.4.11, RCS Pressure and Temperature (P/T) Limits. | 21 October 2002 | Request for Amendment to Technical Specifications Justification for the Continued Use of Technical Specifications, Section 3.4.11, RCS Pressure and Temperature (P/T) Limits. | |
RS-02-169, Request for License Amendment Related to Appendix B, Environmental Protection Plan (Non-Radiological) | 27 September 2002 | Request for License Amendment Related to Appendix B, Environmental Protection Plan (Non-Radiological) | |
RS-02-189, Withdrawal of Requested Amendment to Technical Specifications Excess Flow Check Valve Testing Surveillance and Relief Request RV-12 | 30 October 2002 | Withdrawal of Requested Amendment to Technical Specifications Excess Flow Check Valve Testing Surveillance and Relief Request RV-12 | |
RS-02-196, Revised Request for Amendment to Technical Specifications Justification for the Continued Use of Technical Specifications, Section 3.4.11, RCS Pressure and Temperature (P/T) Limits. | 8 November 2002 | Revised Request for Amendment to Technical Specifications Justification for the Continued Use of Technical Specifications, Section 3.4.11, RCS Pressure and Temperature (P/T) Limits. | Hydrostatic |
RS-02-214, Response to Request for Additional Information Addressing Request for Amendment to Technical Specification 5.6.5, Core Operating Limits Report (Colr), for Addition of New Analytical Methodology | 26 December 2002 | Response to Request for Additional Information Addressing Request for Amendment to Technical Specification 5.6.5, Core Operating Limits Report (Colr), for Addition of New Analytical Methodology | |
RS-03-006, Response to Task Interface Agreement 2001-14, Evaluation of LaSalle Water Hammer Analysis. | 13 January 2003 | Response to Task Interface Agreement 2001-14, Evaluation of LaSalle Water Hammer Analysis. | Safe Shutdown Significance Determination Process Pressure Boundary Leakage Backfit |
RS-03-016, Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization | 27 January 2003 | Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization | |
RS-03-029, Request for Amendment to Technical Specifications Table 3.3.5.1-1, Emergency Core Cooling System Instrumentation. | 31 March 2003 | Request for Amendment to Technical Specifications Table 3.3.5.1-1, Emergency Core Cooling System Instrumentation. | |
RS-03-040, Request for Amendment to Technical Specifications Section 5.7, High Radiation Area. | 31 March 2003 | Request for Amendment to Technical Specifications Section 5.7, High Radiation Area. | High Radiation Area |
RS-03-061, Revision to Exelon Nuclear Standardized Radiological Emergency Plan & Emergency Plan Procedure | 24 March 2003 | Revision to Exelon Nuclear Standardized Radiological Emergency Plan & Emergency Plan Procedure | Fitness for Duty Nuclear Accident Reporting System Severe Accident Management Guideline |
RS-03-068, Revised Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization | 26 March 2003 | Revised Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization | |
RS-03-073, Report on Status of Decommissioning Funding for Reactors, Braidwood, Units 1 & 2, Byron, Units 1 & 2, Dresden, Units 1, 2 & 3, LaSalle, Units 1 & 2, Limerick, Units 1 & 2, Peach Bottom, Units 1, 2 & 3 Salem, Units 1 & 2, Quad Cities, Units | 31 March 2003 | Report on Status of Decommissioning Funding for Reactors, Braidwood, Units 1 & 2, Byron, Units 1 & 2, Dresden, Units 1, 2 & 3, LaSalle, Units 1 & 2, Limerick, Units 1 & 2, Peach Bottom, Units 1, 2 & 3 Salem, Units 1 & 2, Quad Cities, Units | |
RS-03-075, Request for Amendment to TS Table 3.3.6.1-1, Primary Containment Isolation Instrumentation | 18 April 2003 | Request for Amendment to TS Table 3.3.6.1-1, Primary Containment Isolation Instrumentation | |
RS-03-079, Request for Amendment to Technical Specifications, Surveillance Requirement 3.7.7.1 for Turbine Bypass Valve Testing | 19 May 2003 | Request for Amendment to Technical Specifications, Surveillance Requirement 3.7.7.1 for Turbine Bypass Valve Testing | Safety Limit Minimum Critical Power Ratio Feedwater Controller Failure |
RS-03-095, Revised Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization | 6 May 2003 | Revised Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization | |
RS-03-106, Supplement to Request for Amendment to TS Surveillance Requirement 3.6.1.3.8 | 10 June 2003 | Supplement to Request for Amendment to TS Surveillance Requirement 3.6.1.3.8 | Squib |
RS-03-107, Response to Task Interface Agreement 2001-14, Evaluation of LaSalle Water Hammer Analysis, Revision 1. | 20 June 2003 | Response to Task Interface Agreement 2001-14, Evaluation of LaSalle Water Hammer Analysis, Revision 1. | |
RS-03-110, Response to Issuance of Orders to Modify License for Revised Design Basis Threat and Compensatory Measures Related to Security Force Training and Fitness-for-Duty | 3 June 2003 | Response to Issuance of Orders to Modify License for Revised Design Basis Threat and Compensatory Measures Related to Security Force Training and Fitness-for-Duty | |
RS-03-112, Request for Amendment to Technical Specifications Section 5.6.5 Core Operating Limits Report (Colr). | 1 July 2003 | Request for Amendment to Technical Specifications Section 5.6.5 Core Operating Limits Report (Colr). | |
RS-03-122, Response to Request for Additional Information to Support Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program. | 20 June 2003 | Response to Request for Additional Information to Support Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program. | Coatings Large early release frequency Exemption Request |
RS-03-123, Response to Request for Additional Information to Support Request for Amendment to TS Table 3.3.5.1-1, Emergency Core Cooling System Instrumentation | 26 June 2003 | Response to Request for Additional Information to Support Request for Amendment to TS Table 3.3.5.1-1, Emergency Core Cooling System Instrumentation | Reactor Vessel Water Level Hydrostatic Operating Basis Earthquake Grace period |
RS-03-124, Revisions to Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure | 19 June 2003 | Revisions to Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure | Earthquake |
RS-03-145, Request for Amendments to TS Section 5.5.13, Primary Containment Leakage Rate Testing Program | 19 August 2003 | Request for Amendments to TS Section 5.5.13, Primary Containment Leakage Rate Testing Program | |
RS-03-152, Supplemental Response to Issuance of Order to Modify License and Compensatory Measures Related to Security Force Fitness-for-Duty | 25 July 2003 | Supplemental Response to Issuance of Order to Modify License and Compensatory Measures Related to Security Force Fitness-for-Duty | Enforcement Discretion |
RS-03-159, Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure | 7 August 2003 | Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure | Met Tower Nuclear Accident Reporting System |
RS-03-170, Registration of First Use of Cask to Transport Spent Fuel | 28 August 2003 | Registration of First Use of Cask to Transport Spent Fuel | |
RS-03-173, Response to NRC Regulatory Issue Summary 2003-14, (Limerick/Oyster Creek/Peach Bottom/Tmi) Preparation and Scheduling of Operator Licensing Examinations. | 26 September 2003 | Response to NRC Regulatory Issue Summary 2003-14, (Limerick/Oyster Creek/Peach Bottom/Tmi) Preparation and Scheduling of Operator Licensing Examinations. | Generic Fundamentals Examination |
RS-03-174, Notification of Intent to Perform Analyses Using Vendor Safety Analysis Codes | 19 September 2003 | Notification of Intent to Perform Analyses Using Vendor Safety Analysis Codes | Shutdown Margin |
RS-03-184, Revised Procedures, Including, EP-AA-111, Emergency Classification and Protective Action Recommendations, and EP-AA-115, Termination and Recovery. | 19 September 2003 | Revised Procedures, Including, EP-AA-111, Emergency Classification and Protective Action Recommendations, and EP-AA-115, Termination and Recovery. | Earthquake |
RS-03-186, Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure | 19 September 2003 | Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure | |
RS-03-207, Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedures | 30 October 2003 | Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedures | Fitness for Duty Health Physics Network Nuclear Accident Reporting System |
RS-03-208, Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure | 5 November 2003 | Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure | Met Tower Deep Dose Equivalent Fuel cladding |
RS-03-209, Request for Amendment to Technical Specifications to Add Requirement to Modify Linear Heat Generation Rate Limit During Single Recirculation Loop Operation | 3 November 2003 | Request for Amendment to Technical Specifications to Add Requirement to Modify Linear Heat Generation Rate Limit During Single Recirculation Loop Operation | Anticipated operational occurrence Abnormal operational transient Fuel cladding |
RS-03-220, Confirmation of Completion of Actions Implementing the Compensatory Measures Related to Security Force Fitness-for-Duty | 14 November 2003 | Confirmation of Completion of Actions Implementing the Compensatory Measures Related to Security Force Fitness-for-Duty | |
RS-03-226, Security Plan, Revision 68 | 5 December 2003 | Security Plan, Revision 68 | |