Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RS-02-034, Withdrawal of Request for NRC Approval of Physical Security & Guard Force Training & Qualification Plan Changes13 February 2002Withdrawal of Request for NRC Approval of Physical Security & Guard Force Training & Qualification Plan Changes
RS-02-055, Response to Commission Order to Modify License for Interim Safeguards & Security Measures15 March 2002Response to Commission Order to Modify License for Interim Safeguards & Security Measures
RS-02-059, Submittal of Security Plan, Revision 67 for LaSalle County Station, Units 1 & 2. No Enclosures25 March 2002Submittal of Security Plan, Revision 67 for LaSalle County Station, Units 1 & 2. No Enclosures
RS-02-071, Request for Approval of Quality Assurance Program Changes for Exelon Generation Company, LLC, and Amergen Energy Company, LLC, Nuclear Power Plants9 April 2002Request for Approval of Quality Assurance Program Changes for Exelon Generation Company, LLC, and Amergen Energy Company, LLC, Nuclear Power PlantsSafe Shutdown
Shutdown Margin
Non-Destructive Examination
Offsite Dose Calculation Manual
Commercial Grade Dedication
Safe Shutdown Earthquake
Coatings
Nondestructive Examination
Temporary Modification
Incorporated by reference
Condition Adverse to Quality
Process Control Program
Operability Determination
Maintenance Rule Program
Liquid penetrant
Fire Protection Program
Early Warning Fire Detection
RS-02-074, Second 10-Year Inservice Inspection Interval End Dates9 April 2002Second 10-Year Inservice Inspection Interval End Dates
RS-02-110, Request for Amendment to Technical Specifications Table 3.3.8.1-1, Loss of Power Instrumentation.8 July 2002Request for Amendment to Technical Specifications Table 3.3.8.1-1, Loss of Power Instrumentation.Reactor Vessel Water Level
RS-02-122, Justification for Continued Use of Technical Specifications, Section 3.4.11, RCS Pressure & Temperature (P/T) Limits.19 July 2002Justification for Continued Use of Technical Specifications, Section 3.4.11, RCS Pressure & Temperature (P/T) Limits.
RS-02-123, Response to Regulatory Issue Summary 2002-09, Preparation and Scheduling of Operator Licensing Examinations.18 July 2002Response to Regulatory Issue Summary 2002-09, Preparation and Scheduling of Operator Licensing Examinations.Generic Fundamentals Examination
RS-02-140, Supplemental Response to Commission Order to Modify License for Interim Safeguards and Security Measures for Interim Compensatory Measure B.4.e1 August 2002Supplemental Response to Commission Order to Modify License for Interim Safeguards and Security Measures for Interim Compensatory Measure B.4.e
RS-02-146, Revised Supplemental Response to Commission Order to Modify License for Interim Safeguards & Security Measures for Interim Compensatory Measure B.4.e14 August 2002Revised Supplemental Response to Commission Order to Modify License for Interim Safeguards & Security Measures for Interim Compensatory Measure B.4.e
RS-02-148, Long Term Solution Stability System Oscillation Power Range Monitor Revised Implementation Plan27 August 2002Long Term Solution Stability System Oscillation Power Range Monitor Revised Implementation Plan
RS-02-158, Confirmation of Completion of Actions Implementing the Interim Compensatory Measures of the February 25, 2002, Commission Order to Modify License for Interim Safeguards and Security Measures12 September 2002Confirmation of Completion of Actions Implementing the Interim Compensatory Measures of the February 25, 2002, Commission Order to Modify License for Interim Safeguards and Security Measures
RS-02-160, Request for Amendment to TS 5.6.5, Core Operating Limits Report for Addition of New Analytical Methodology19 September 2002Request for Amendment to TS 5.6.5, Core Operating Limits Report for Addition of New Analytical Methodology
RS-02-164, Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.24 October 2002Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.Safe Shutdown
High winds
Fire Barrier
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Coatings
Tornado Generated Missile
Large early release frequency
Earthquake
Maintenance Rule Program
Turbine Missile
RS-02-165, Response to Request for Additional Information Re Excess Flow Check Valve Testing Surveillance and Relief Request RV-124 October 2002Response to Request for Additional Information Re Excess Flow Check Valve Testing Surveillance and Relief Request RV-12
RS-02-167, Request for Amendment to Technical Specifications Justification for the Continued Use of Technical Specifications, Section 3.4.11, RCS Pressure and Temperature (P/T) Limits.21 October 2002Request for Amendment to Technical Specifications Justification for the Continued Use of Technical Specifications, Section 3.4.11, RCS Pressure and Temperature (P/T) Limits.
RS-02-169, Request for License Amendment Related to Appendix B, Environmental Protection Plan (Non-Radiological)27 September 2002Request for License Amendment Related to Appendix B, Environmental Protection Plan (Non-Radiological)
RS-02-189, Withdrawal of Requested Amendment to Technical Specifications Excess Flow Check Valve Testing Surveillance and Relief Request RV-1230 October 2002Withdrawal of Requested Amendment to Technical Specifications Excess Flow Check Valve Testing Surveillance and Relief Request RV-12
RS-02-196, Revised Request for Amendment to Technical Specifications Justification for the Continued Use of Technical Specifications, Section 3.4.11, RCS Pressure and Temperature (P/T) Limits.8 November 2002Revised Request for Amendment to Technical Specifications Justification for the Continued Use of Technical Specifications, Section 3.4.11, RCS Pressure and Temperature (P/T) Limits.Hydrostatic
RS-02-214, Response to Request for Additional Information Addressing Request for Amendment to Technical Specification 5.6.5, Core Operating Limits Report (Colr), for Addition of New Analytical Methodology26 December 2002Response to Request for Additional Information Addressing Request for Amendment to Technical Specification 5.6.5, Core Operating Limits Report (Colr), for Addition of New Analytical Methodology
RS-03-006, Response to Task Interface Agreement 2001-14, Evaluation of LaSalle Water Hammer Analysis.13 January 2003Response to Task Interface Agreement 2001-14, Evaluation of LaSalle Water Hammer Analysis.Safe Shutdown
Significance Determination Process
Pressure Boundary Leakage
Backfit
RS-03-016, Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization27 January 2003Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization
RS-03-029, Request for Amendment to Technical Specifications Table 3.3.5.1-1, Emergency Core Cooling System Instrumentation.31 March 2003Request for Amendment to Technical Specifications Table 3.3.5.1-1, Emergency Core Cooling System Instrumentation.
RS-03-040, Request for Amendment to Technical Specifications Section 5.7, High Radiation Area.31 March 2003Request for Amendment to Technical Specifications Section 5.7, High Radiation Area.High Radiation Area
RS-03-061, Revision to Exelon Nuclear Standardized Radiological Emergency Plan & Emergency Plan Procedure24 March 2003Revision to Exelon Nuclear Standardized Radiological Emergency Plan & Emergency Plan ProcedureFitness for Duty
Nuclear Accident Reporting System
Severe Accident Management Guideline
RS-03-068, Revised Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization26 March 2003Revised Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization
RS-03-073, Report on Status of Decommissioning Funding for Reactors, Braidwood, Units 1 & 2, Byron, Units 1 & 2, Dresden, Units 1, 2 & 3, LaSalle, Units 1 & 2, Limerick, Units 1 & 2, Peach Bottom, Units 1, 2 & 3 Salem, Units 1 & 2, Quad Cities, Units31 March 2003Report on Status of Decommissioning Funding for Reactors, Braidwood, Units 1 & 2, Byron, Units 1 & 2, Dresden, Units 1, 2 & 3, LaSalle, Units 1 & 2, Limerick, Units 1 & 2, Peach Bottom, Units 1, 2 & 3 Salem, Units 1 & 2, Quad Cities, Units
RS-03-075, Request for Amendment to TS Table 3.3.6.1-1, Primary Containment Isolation Instrumentation18 April 2003Request for Amendment to TS Table 3.3.6.1-1, Primary Containment Isolation Instrumentation
RS-03-079, Request for Amendment to Technical Specifications, Surveillance Requirement 3.7.7.1 for Turbine Bypass Valve Testing19 May 2003Request for Amendment to Technical Specifications, Surveillance Requirement 3.7.7.1 for Turbine Bypass Valve TestingSafety Limit Minimum Critical Power Ratio
Feedwater Controller Failure
RS-03-095, Revised Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization6 May 2003Revised Response to Commission Order to Modify License for Compensatory Measures Related to Access Authorization
RS-03-106, Supplement to Request for Amendment to TS Surveillance Requirement 3.6.1.3.810 June 2003Supplement to Request for Amendment to TS Surveillance Requirement 3.6.1.3.8Squib
RS-03-107, Response to Task Interface Agreement 2001-14, Evaluation of LaSalle Water Hammer Analysis, Revision 1.20 June 2003Response to Task Interface Agreement 2001-14, Evaluation of LaSalle Water Hammer Analysis, Revision 1.
RS-03-110, Response to Issuance of Orders to Modify License for Revised Design Basis Threat and Compensatory Measures Related to Security Force Training and Fitness-for-Duty3 June 2003Response to Issuance of Orders to Modify License for Revised Design Basis Threat and Compensatory Measures Related to Security Force Training and Fitness-for-Duty
RS-03-112, Request for Amendment to Technical Specifications Section 5.6.5 Core Operating Limits Report (Colr).1 July 2003Request for Amendment to Technical Specifications Section 5.6.5 Core Operating Limits Report (Colr).
RS-03-122, Response to Request for Additional Information to Support Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.20 June 2003Response to Request for Additional Information to Support Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program.Coatings
Large early release frequency
Exemption Request
RS-03-123, Response to Request for Additional Information to Support Request for Amendment to TS Table 3.3.5.1-1, Emergency Core Cooling System Instrumentation26 June 2003Response to Request for Additional Information to Support Request for Amendment to TS Table 3.3.5.1-1, Emergency Core Cooling System InstrumentationReactor Vessel Water Level
Hydrostatic
Operating Basis Earthquake
Grace period
RS-03-124, Revisions to Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure19 June 2003Revisions to Exelon Nuclear Standardized Radiological Emergency Plan Implementing ProcedureEarthquake
RS-03-145, Request for Amendments to TS Section 5.5.13, Primary Containment Leakage Rate Testing Program19 August 2003Request for Amendments to TS Section 5.5.13, Primary Containment Leakage Rate Testing Program
RS-03-152, Supplemental Response to Issuance of Order to Modify License and Compensatory Measures Related to Security Force Fitness-for-Duty25 July 2003Supplemental Response to Issuance of Order to Modify License and Compensatory Measures Related to Security Force Fitness-for-DutyEnforcement Discretion
RS-03-159, Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure7 August 2003Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing ProcedureMet Tower
Nuclear Accident Reporting System
RS-03-170, Registration of First Use of Cask to Transport Spent Fuel28 August 2003Registration of First Use of Cask to Transport Spent Fuel
RS-03-173, Response to NRC Regulatory Issue Summary 2003-14, (Limerick/Oyster Creek/Peach Bottom/Tmi) Preparation and Scheduling of Operator Licensing Examinations.26 September 2003Response to NRC Regulatory Issue Summary 2003-14, (Limerick/Oyster Creek/Peach Bottom/Tmi) Preparation and Scheduling of Operator Licensing Examinations.Generic Fundamentals Examination
RS-03-174, Notification of Intent to Perform Analyses Using Vendor Safety Analysis Codes19 September 2003Notification of Intent to Perform Analyses Using Vendor Safety Analysis CodesShutdown Margin
RS-03-184, Revised Procedures, Including, EP-AA-111, Emergency Classification and Protective Action Recommendations, and EP-AA-115, Termination and Recovery.19 September 2003Revised Procedures, Including, EP-AA-111, Emergency Classification and Protective Action Recommendations, and EP-AA-115, Termination and Recovery.Earthquake
RS-03-186, Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure19 September 2003Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure
RS-03-207, Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedures30 October 2003Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing ProceduresFitness for Duty
Health Physics Network
Nuclear Accident Reporting System
RS-03-208, Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure5 November 2003Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing ProcedureMet Tower
Deep Dose Equivalent
Fuel cladding
RS-03-209, Request for Amendment to Technical Specifications to Add Requirement to Modify Linear Heat Generation Rate Limit During Single Recirculation Loop Operation3 November 2003Request for Amendment to Technical Specifications to Add Requirement to Modify Linear Heat Generation Rate Limit During Single Recirculation Loop OperationAnticipated operational occurrence
Abnormal operational transient
Fuel cladding
RS-03-220, Confirmation of Completion of Actions Implementing the Compensatory Measures Related to Security Force Fitness-for-Duty14 November 2003Confirmation of Completion of Actions Implementing the Compensatory Measures Related to Security Force Fitness-for-Duty
RS-03-226, Security Plan, Revision 685 December 2003Security Plan, Revision 68