Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20003C255 | 24 February 1981 | Forwards Interim Rept, Technical Evaluation of Electrical, Instrumentation & Control Design Aspects of Override Containment Purge Valve Isolation & Other Engineered Safety Feature Signals. | |
ML20040B893 | 13 August 1981 | FOIA Request for Listed Documents for Use in Providing Technical Analyses & Expert Testimony in Hearings Before Ny Public Svc Commission Re Oct 1980 Containment Bldg Flooding at Facility | |
ML20049J436 | 16 July 1981 | Requests Investigation Repts Re 710307,731113 & 770702 Containment Flooding Incidents at Facility | |
ML20054L897 | 30 June 1982 | Forwards Corrected Transcript of 820601 Telephone Conference in Washington,Dc.Page Numbers Amended to Ensure Consecutive Pagination | |
ML20071D490 | 1 March 1983 | Clarifies & Documents Independence from Issues Re Probabilistic Safety Study,Before Being Engaged as ASLB Technical Consultant | |
ML20084N077 | 1 June 1983 | Forwards Final Rept, Analysis of PRA Testimony:Indian Point ASLB Hearings,Commission Question 1. Rept Conclusions Coincide W/Conclusions in | |
ML20085D788 | 1 July 1983 | Presents Results of Review of Testimony on Commission Question 5.Testimony on Question 5 Is as Complete as Possible But Suffers from Same Deficiencies Re Relative Risk | |
ML20107K281 | 26 November 1984 | FOIA Request for Encls to NRC Re Reactor Vessel Flaws at Facility to Be Made Available in PDR | |
ML20107K883 | 16 November 1984 | FOIA Request for Six Categories of Documents to Be Available in Pdr,Including Control of Heavy Loads at Indian Point Unit 2 & VEPCO Re IE Bulletin 80-11 | Control of Heavy Loads |
ML20126M508 | 22 February 1985 | FOIA Request for Encls to NRC to PASNY Re Redundant DHR Capability Tech Specs | |
ML20207K015 | 19 December 1986 | FOIA Request That Encls to Insp Rept 50-247/86-26,Byron Semiannual Radioactive Effluent Rept & Millstone 1 & 2 SALP Rept Be Placed in PDR | |
ML20209D169 | 29 October 1986 | Forwards Rev 3 to EGG-EA-7035, Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Braidwood Units 1 & 2,Bryon Station Units 1 & 2,Callaway Plant Unit 1,Indian Point.... Licensees Conform to All Items W/Exception of Trojan | |
ML20235A125 | 16 December 1987 | Forwards Info Re Resource Technical Svcs,Inc,Including Summary of NRC Contract Work,Nrc Form 26 for Three Existing Contracts,Audit Info,Work History & Lists of Expertise Available for Special Insps & of Current Resource Svcs | |
ML20235K873 | 9 July 1987 | Informs That Tayloe Assoc Cannot Produce Mag or nine-track Tapes of Hearing Transcripts Until NRC Finalizes Arrangements W/Others to Provide Lexis Format,Including Library & File Numbers & Segmentation Info | |
ML20235L708 | 15 May 1983 | Forwards New 830322 Indian Point Transcript Due to Blank Pages in Original NRC Copy.Blank Pages Caused by Malfunction of Baron Computer Printer |