Semantic search

Jump to navigation Jump to search
 Issue dateSiteTitle
IR 07100086/202120115 April 202107100086Alpha-Omega Services, Inc., NRC Form 591S Part 1, Inspection Report 07100086/2021201 with Attached Inspector Notes
IR 07100102/202320118 January 202407100102Spec Inspection Report 71-0102/2023-201 Corrective Actions Status Call
IR 07100935/20202013 November 202007109168
07109204
07100935
07109321
07109320
Energysolutions - NRC Form 591S, Part 2, Inspection Reports 07100935/2020-201, 07109268/2020201, 07109204/2020201, 07109320/2020201 and 07109321/2020201
ML09110088215 April 2009Perry
07200069
Email Fwd: Perry Independent Spent Fuel Storage Installation Inspection Document Request
ML0912607696 May 2009Perry
07200069
Email Inspection Document Request for Perry ISFSI
ML1006804729 March 2010PerryEmail FW Control of Heavy Loads Request for Information (RFI)
ML10327037323 November 2010ZionE-mail - Zion Dry Fuel Storage Cask Requested Information
ML18129A3089 May 2018E-Mail Conversation from J. Tapp/Dsfm to P. Whaley/Utexas NRC Part 71 QAP Application
ML18275A04317 August 201807100703Nordion (Canada) Inc. - NRC Form 591S Part 1 and Part 2, Inspection Report 07100703/2018201
ML19255F62217 September 2019Presentation Slides: Spent Nuclear Fuel Transportation - Inspection Readiness
ML19255F62318 September 2019Presentation Slides: Status Update of 72.48 Program Changes
ML19331A6862 December 2019ISFSI Inspection Program Enhancement Initiative Overview Presentation
ML19357A0036 January 2020ISFSI Inspection Enhancement Initiative Public Meeting Summary
ML20066L2329 March 2020ISFSI Inspection Program Enhancement Webinar
ML20097C69514 April 2020Summary of Public Webinar to Discuss the Independent Spent Fuel Storage Installation Inspection Enhancement Initiative Recommendations
ML20105A16414 April 2020RIC 2020 ISFSI Inspection Program Enhancement 3-5-2020
ML20177A41411 September 2020IP 60853 On-Site Fabrication of Components and Construction of an ISFSI
ML20177A53320 October 2020IP 60854 Preoperational Testing of an Independent Spent Fuel Storage Installation
ML20178A38820 October 2020IP 60856 Review of 10 CFR 72.212(b) Evaluations
ML20227A10523 December 202007100708Westinghouse Form 311, Rev 9
ML20232D09820 October 2020IP 60857 Review of 10 CFR 72.48 Evaluations
ML20294A51925 November 2020IP 60855 Operation of an Independent Spent Fuel Storage Installation
ML20294A52012 November 2020IP 60858 Away from Reactor ISFSI Inspection Guidance
ML20309A5033 November 202007109168
07109204
07100935
07109321
07109320
Energysolutions - NRC Form 591S, Part 1, Inspection Reports 07100935/2020-201, 07109268/2020201, 07109204/2020201, 07109320/2020201 and 07109321/2020201
ML20309A5053 November 202007109168
07109204
07100935
07109321
07109320
Inspector Notes Cover Sheet
ML20338A19215 December 2020IMC 2690, Inspection Program for Storage of Spent Reactor Fuel and Reactor-Related Greater-Than-Class C Waste at Independent Spent Fuel Storage Installations and for 10 CFR Part 71 Transportation Packagings
ML20338A1937 December 2020IMC 2691 Technical Basis for the Independent Spent Fuel Storage Installation Inspection Program
ML20343A18931 August 2020Cover, Table of Contents and Introduction
ML20343A19031 August 2020Chapter 1 General Evaluation Information
ML20343A19131 August 2020Chapter 2 Structural Evaluation
ML20343A19231 August 2020Attachment 2A Computational Modeling Software Technical Review Guidance
ML20343A19331 August 2020Chapter 3 Thermal Evaluation
ML20343A19431 August 2020Chapter 4 Containment Evaluation
ML20343A19531 August 2020Chapter 5 Shielding Evaluation
ML20343A19631 August 2020Chapter 6 Criticality Evaluation
ML20343A19731 August 2020Attachment 6A Technical Recommendations
ML20343A19831 August 2020Chapter 7 Materials Evaluation
ML20343A19931 August 2020Attachment 7A Clarifications, Guidance and Exceptions to ASTM Standard Practice
ML20343A20031 August 2020Attachment 7B Fuel Selection
ML20343A20131 August 2020Chapter 8 Operating Procedures Evaluation
ML20343A20231 August 2020Chapter 9 Acceptance Tests and Maintenance Program Evaluation
ML20343A20331 August 2020Chapter 10 Quality Assurance Evaluation
ML20343A20431 August 2020Chapter 11 Glossary
ML20343A20531 August 2020Appendix a Description, Safety Features, and Areas of Review for Different Types of Radioactive Material Transportation Packages
ML20343A20631 August 2020Appendix B Differences Between Thermal and Radiation Properties of Mixed Oxide and Low-Enriched Uranium Radioactive Materials
ML20343A20731 August 2020Appendix C Differences Between Thermal and Radiation Properties of Mixes Oxide and Low-Enriched Uranium Spent Nuclear Feul
ML20343A20831 August 2020Appendix D Benchmark Considerations for Mixed Oxide Radioactive Materials and Spent Nuclear Fuel
ML20343A20931 August 2020Appendix E Description and Review Procedures for Irradiated Tritium-Producing Burnable Absorber Rods Packages
ML20343A21031 August 2020Attachment a Physical and Chemical Properties of Tritium
ML20343A21131 August 2020Attachment B Biological Properties of Tritium and Tritium Health Physics