| Q | CCA | Title |
---|
05000440/FIN-2014005-01 | 2014Q4 | H.5 | Unevaluated Preconditioning of Emergency Service Water Motor-Operated Valves and Check Valves Prior to Conducting As-Found Inservice Surveillance Testing |
05000440/FIN-2014005-02 | 2014Q4 | | Inadequate Procedure for Performing an Acceptable Technical Specification Required Channel Check |
05000440/FIN-2014005-03 | 2014Q4 | H.3 | Failure to Follow Licensee Procedure to Properly Screen and Evaluate Temporary Changes to Plant Facilities / Structures, Systems, or Components |
05000440/FIN-2014403-01 | 2014Q4 | H.13 | Security |
05000440/FIN-2014005-04 | 2014Q4 | | Failure to Follow Procedures During Dry Cask Operations |
05000440/FIN-2015001-01 | 2015Q1 | H.5 | Failure to Initiate A Transient Combustible Permit |
05000440/FIN-2015001-02 | 2015Q1 | | Liquid Penetrant Testing Procedure Was Not Qualified for Its Full Applicability Range |
05000440/FIN-2015007-02 | 2015Q3 | H.12 | Failure to Adequately Evaluate Damaged CRD Flange |
05000440/FIN-2015003-01 | 2015Q3 | H.6 | Inadequate Operating Procedure for Diesel Generator Building Ventilation System |
05000440/FIN-2015003-02 | 2015Q3 | H.12 | Failure to Properly Implement Steps Outlined in a Technical Specification Surveillance Proce |
05000440/FIN-2015007-01 | 2015Q3 | | ASME Code Pressure Tests of Reactor Vessel Flange Seal Leak-Off Line Were Not Performed |