Emergency Planning Document Update
ML032801581
Person / Time
Site: Indian Point 
Issue date: 09/15/2003
From:
Entergy Nuclear Indian Point 2
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
28631 IP-2003, Rev 7
Download: ML032801581 (19)


Text

15-SEP-03 Page: 19 DISTRIBUTION CONTROL LIST S cument Name: EMER PLAN CCNAME NAME DEPT LOCATION 2 EP/TRAINING ADMINISTRATOR TRAINING (ALL EP'S) #48 3 RES DEPARTMENT MANAGER RES (UNIT 3/IPEC ONLY) 45-4-A 4 REFERENCE LIBRARY REC/TRN(UNT 3/IPEC ONLY) BLDG/17 9 JOINT NEWS CENTER EMER PLN (ALL EP'S) EOF 10 SHIFT MGR.(LUB-001-GEN) OPS (UNIT 3/IPEC ONLY) IP3 11 CONTROL ROOM & MASTER OPS(3PT-D001/6(U3/IPEC) IP3(ONLY) 14 EOF E-PLAN (ALL EP'S) EOF 16 AEOF/A.GROSJEAN(ALL EP'S) E-PLAN (EOP'S ONLY) WPO-12D 19 NUC ENGINEERING LIBRARY DOC (UNIT 3/IPEC ONLY) WPO/7A 21 TSC RECORDS 45-3-F 22 RESIDENT INSPECTOR US NRC(UNIT 3/IPEC ONLY) 45-2-B 23 SILK DAVID NRC (ALL EP'S) OFFSITE 24,-SLaK _PAVID ,NRC,(ALL EP'S) _OFFSITE L25 DOCUMENT CONTROL DESK NRC (ALL EP'S) OFFSITE 28 A'VI AXXOTS N J A(UNIT 3fIPEC ONLY) OFFSITE 29 E-PLAN STAFF E-PLAN (ALL EP'S) EOF 30 E-PLAN STAFF E-PLAN (ALL EP'S) EOF 31 BARANSKI J(VOLUME I ONLY) ST. EMERG. MGMT. OFFICE OFFSITE 32 SUTTON A -(VOLUME I ONLY) DISASTER & EMERGENCY WESTCHESTR 10 33 LONGO N (VOLUME I ONLY) EMERGENCY SERVICES ROCKLAND 34 GREENE D (VOLUME I ONLY) DISASTER & CIVIL DEFENSE ORANGE 35 RAMPOLLA M(VOLUME I ONLY) OFFICE OF EMERG MANAGE PUTNAM 41 SIMULATOR TRAIN(UNIT 3/IPEC ONLY) 48-2-A 107 QA MANAGER QA (UNIT 3/IPEC) K-IP2-4302 319 C.STELLATO(NRQ-OPS TRN) NRQ (UNIT 3/IPEC ONLY) #48 354 L.GRANT(LRQ-OPS/TRAIN) LRQ (UNIT 3/IPEC ONLY) #48 376 E-PLAN STAFF E-PLAN (ALL EP'S) EOF 424 J.CHIUSANO(OPS INSTR) (UNIT 3/IPEC ONLY) #48 510 L.GRANT(LRQ-OPS/TRAIN) LRQ (UNIT 3/IPEC ONLY) #48 511 L.GRANT(LRQ-OPS/TRAIN) LRQ (UNIT 3/IPEC ONLY) #48 512 C.STELLATO(NRQ-OPS TRN) NRQ (UNIT 3/IPEC ONLY) #48 513 C.STELLATO(NRQ-OPS TRN) NRQ (UNIT 3/IPEC ONLY) #48 517 PLANT MANAGER'S OFFICE ADMIN/(UNIT 2/IPEC ONLY) IP2 518 DOCUMENT CONTROL UNIT 2(UNIT 2/IPEC ONLY) IP2 520 CONTROL ROOM (UNIT 2) OPS (UNIT 2 & IPEC ONLY) IP2 521 SIMULATOR TRAIN (UNIT 2/IPEC ONLY) IP2 522 NRC RESIDENT US NRC(UNIT 2/IPEC ONLY) IP2 523 ROBERT VOGLE (UNIT 2) TRAIN/LIB (ALL EP'S) TODDVILLE 524 JOHN MCCANN (UNIT 2) NUC SAFETY/LIC(ALL EP'S) IP2 552 TORRES DAMARIS(MASTER) DOCUMENTS (EEC BLDG) IP2 A4W 5

Is IPEC SITE QUALITY RELATED IP-SMM-AD-103 Revision 0
  • Entergy MANAGEMENT ADMINISTRATIVE PROCEDURE MANUAL INFORMATIONAL USE Page 13 of 21 ATTACHMENT 10.1 SMM CONTROLLED DOCUMENT TRANSMITTAL FORM SITE MANAGEMENT MANUAL CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES Paae I of 1

@Entergy TO: DISTRIBUTION DATE: 912412003 TRANSMITTAL NO: 28631 (Circle one)

FROM: IPEC DOCUMENT CONTROL: E EEC or IP2 53'EL PHONE NUMBER: 271-7056 The Document(s) identified below are forwarded for use. In accordance with IP-SMM-AD-103, please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, void, or inactive document(s). Sign and return the receipt acknowledgement below within fifteen (15) working days.

AFFECTED DOCUMENT: EMERGENCY PLANNING DOC # REV # TITLE INSTRUCTIONS

                • SEE ATTACHED INSTRUCTIONS**********
                    • PLEASE NOTE EFFECTIVE DATE*********

RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S) (IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S).

NA_ (_IT SINTR _ _ _

DAT NAME (PRINT) SIGNATURE DATE Cc#Y

I.- ft

Needs #2AR&S /

TO: Nuclear Regulatory Commission FROM: IPEC Emergency Planning

SUBJECT:

Emergency Planning Document Update Date: 09/19/03 Please update your controlled copy of the documents listed below as specified with the copy(s) attached.

New Rev./ -Old Rev. #J Document# Document Name' De t - Instructions I

Un13V II. 7 Emergency.Plan Implementing Procedures TOC Unit 3 Volume II 9/18103 7/03 Replace old with new IP-2003 CR Watch Chemist Rev. 7 Rev. 6 Replace old with new 9/18103 7/02

VOLUME II TABLE OF CONTENTS 09/18/03 ENTERGY NUCLEAR NORTHEAST INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN - VOLUME II EMERGENCY RESPONSE ACTIVATION TABLE OF CONTENTS REV. I / DATE IC/EAL'S INITIATING CONDITIONS AND EMERGENCY ACTION LEVELS 9 - 07/02 CONTROL ROOM IP-2000 Emergency Activation of the Control Room (CR) 4 - 09/98 IP-2001 Emergency Director (ED), Plant Operations Manager 18 - 05/03 (POM), Shift Manager (SM) Procedure IP-2002 CR Health Physics Technician 3 - 02/99 IP-2003 CR Watch Chemist 7 - 09/03 IP-2004 CR Clerk 3 - 09/00 IP-2005 CR Offsite Communicator VOID N/A 06/01 IP-2006 CR Direct-Line Communicator 4 - 10/99 TECHNICAL SUPPORT CENTER (TSC)

IP-2100 Emergency Activation of the Technical Support 4 - 11/00 Center (TSC)

IP-2101 Technical Support Center (TSC) Manager 9 02/01 IP-2102 TSC Communicator(s) 3 12/98 IP-2103 TSC SPDS Computer Operator 4 08/99 IP-2104 TSC Video Operator 2 06/01 IP-2105 TSC Accountability Officer VOID N/A IP-2106 TSC Clerk 5 06/99 OPERATIONS SUPPORT CENTER (OSC)

IP-2200 Emergency Activation of the Operations 7 - 8/02 Support Center (OSC)

IP-2201 Operations Support Center (OSC) Manager 10 - 07/03 IP-2202 OSC Direct-Line Communicator 2 - 12/98 IP-2203 OSC Dispatcher 3 - 07/02 IP-2204 OSC Team Leaders 4 - 07/03 IP-2205 OSC H.P. Team Leader 9 - 07/03 IP-2206 OSC Accountability Officer VOID - N/A IP-2207 OSC Clerk 5 - 06/99 IP-2208 OSC Security Team Leader 4 - 03/02 IP-2209 OSC H.P. Technician 5 - 12/02 IP-2210 OSC Dosimetry Technician 3 - 06/98 IP-2211 OSC Chemistry Team Leader 2 - 03/00 i

VOLUME II TABLE OF CONTENTS 09/18/03 ENTERGY NUCLEAR NORTHEAST INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN - VOLUME II EMERGENCY RESPONSE ACTIVATION TABLE OF CONTENTS EMERGENCY OPERATIONS FACILITY (EOF) REV. # / DATE IP-2300 Emergency Activation of the Emergency VOID - N/A Operations Facility (EOF)

Replaced by IP-EP-250 IP-2301 Emergency Director VOID - N/A Replaced by IP-EP-255 IP-2302 EOF Technical Advisor and Information Liaison VOID - N/A Replaced by IP-EP-250 IP-2303 EOF Radiological Assessment Team Leader (RATL) VOID - N/A Replaced by IP-EP-250 IP-2304 EOF Dose Assessment Health Physicist VOID - N/A Replaced by IP-EP-250 IP-2305 EOF MIDAS Operator VOID - N/A Replaced by IP-EP-250 IP-2306 EOF Security Officer VOID - N/A Replaced by IP-EP-250 IP-2307 EOF Clerk VOID - N/A Replaced by IP-EP-250 IP-2308 EOF Direct-Line Communicator VOID - N/A Replaced by IP-EP-250 IP-2309 EOF Offsite Communicator VOID - N/A Replaced by IP-EP-250 IP-2310 EOF Onsite Radiological Communicator VOID - N/A Replaced by IP-EP-250 IP-2311 EOF Offsite Radiological Communicator Void - N/A IP-2312 EOF Public Relations Liaison VOID - N/A IP-2313 EOF Public Relations Technical Advisor VOID - N/A IP-2314 EOF Radiological Assessment Monitor VOID - N/A ALTERNATE EMERGENCY OPERATIONS FACILITY (AEOF)

IP-2400 Emergency Activation of the Alternate Emergency VOID - N/A Operations Facility (AEOF)

Replaced by IP-EP-251 SECURITY ACTIVATION IP-2500 Security Emergency Activation Responsibilities 13 - 07/03 RECOVERY/TERMINATION IP-2600 Emergency Termination and Transition to Recovery VOID - N/A Replaced by IP-EP-610 IP-2601 Recovery Manager VOID - N/A Replaced by IP-EP-610 IP-2602 Development of a Recovery Action Plan VOID - N/A Replaced by IP-EP-610 IP-2603 Recovery Support Group Manager 1 - 07/02 EP-FORMS SECTION - Index 07/02 ii

VOLUME II TABLE OF CONTENTS 09/18/03 ENTERGY NUCLEAR NORTHEAST INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN - VOLUME II EMERGENCY RESPONSE ACTIVATION TABLE OF CONTENTS APPENDIX 'A' ROSTER I Void Replaced by IPEC ETD ROSTER II Void Replaced by IPEC ETD ROSTER III Void No longer used for Emergency Response Activities APPENDIX 'B' Emergency Offsite Telephone List Void Replaced by IPEC ETD APPENDIX 'C' Emergency Response Facility Telephone List Void Replaced by IPEC ETD iii

NEW YORK POWER AUTHORITY INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN - VOLUME II EMERGENCY RESPONSE ACTIVATION LIST OF ATTACHMENTS IP-2000 Emergency Activation of the Control Room (CCR) 5.1 CCR Setup 5.2* CCR Floor plan IP-2001 Emergency Director (ED), Plant Operations Manager (POM),

Shift Supervisor (SS) Procedure 5.1* Notification of Unusual Event Classification Flowchart 5.2* Alert Classification Flowchart 5.3* Site Area Emergency Classification Flowchart 5.4* General Emergency Classification Flowchart 5.5 Emergency Director Turnover Checklist 5.6 Relocation to AEOF Checklist IP-2005 CCR Offsite Communicator 5.1* Offsite Communications System Diagram IP-2006 CCR Direct Line Communicator 5.1* Communications System Diagram IP-2100 Emergency Activation of the Technical Support Center (TSC) 5.1 TSC Setup 5.2* TSC Floor plan IP-2102 TSC Communicator(s) 5.1* Communications System Diagram IP-2103 TSC SPDS Computer Operator 5.1 Accessing and Using SPDS IP-2104 TSC Video Operator 5.1 Video Cameras IP-2200 Emergency Activation of the Operations Support Center (OSC) 5.1 OSC Setup 5.2* OSC Floor plan IP-2202 OSC Direct Line Communicator 5.1* Communications System Diagram ii

NEW YORK POWER AUTHORITY INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN - VOLUME II EMERGENCY RESPONSE ACTIVATION LIST OF ATTACHMENTS, Continued IP-2203 OSC Dispatcher 5.1 OSC Area Communication Setup and Operations IP-2205 OSC H.P. Team Leader 5.1 Post-Accident Emergency Entry Brief, Dress and Undress Sequences IP-2209 OSC H.P. Technician 5.1* Figure 1 Survey Map 5.2 OSC/TSC Interlocking doors IP-2300 Emergency Activation of the Emergency Operations Facility (EOF) 5.1 EOF Setup 5.2* EOF Floor plan IP-2301 Emergency Director 5.1 Emergency Director Turnover Checklist 5.2 Relocation to AEOF Checklist IP-2302 EOF Technical Advisor 5.1 Accessing and Using SPDS IP-2307 EOF Clerks 5.1 Processing EP-Forms Part I and Part II 5.2 Processing EP-Forms #31a, #31b and #31c IP-2308 Direct Line Communicator 5.1* Communications System Diagram IP-2309 EOF Offsite Communicator 5.1* Offsite Communications System Diagram 5.2 AEOF Preparatory Actions ii

IP-2314 EOF Radiological Assessment Monitor 5.1* EOF Floor plah 5.2 EOF Halon System ii

NEW YORK POWER AUTHORITY INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN - VOLUME II EMERGENCY RESPONSE ACTIVATION LIST OF ATTACHMENTS, Continued IP-2400 Emergency Activation of the Alternate Emergency Operations Center (AEOF) 5.1 AEOF Setup 5.2* AEOF Floor plan 5.3 Instructions for White Plains Telephones 5.4 Instructions for AEOF Radios IP-2500 Security Emergency Activation Responsibilities 5.1* Notification of Unusual Event Security Flowchart 5.2* Alert Security Flowchart 5.3* Site Area Emergency Security Flowchart 5.4* General Emergency Security Flowchart 5.5* Offsite Monitor Notification Security CAS Flowchart 5.6* Notification Testing Security CAS Flowchart 5.7* Notifications for IP-2 Events 5.8* Notifications for Security Events IP-2600 Emergency Termination and Transition to Recovery 5.1* Criteria for Emergency Termination 5.2* Emergency Director Turnover to Recovery Manager Checklist ii

  • Indicates that this Attachment is a Drawing, not text.

ii

Enitergy EMERGENCY PLAN PROCEDURES PROCEDURE NO. IP-2003 REV. 7 TITLE: CR Watch Chemist THIS PROCEDURE IS TSR x THIS PROCEDURE IS NOT TSR 03 WRITTEN BY: -

A)C4\, L SWNATU13E/DATE 21II3 REVIEWED BY: V4411- wej

-- /^VG&ATU7TE 7 7 APPROVED BY: "A.. Q _zLe, Mlrg- -

EFFECTIVE DATE: cl /,: .I I o -

v I 4.'

PROCEDURE USE IS REFERENCE

Volume II IP-2003 Rev. 7 CR WATCH CHEMIST TABLE OF CONTENTS Section Title Pane 1.0 PURPOSE .................... 3 2.0 RESPONSIBILITIES .................... 3

3.0 REFERENCES

.................... 3 4.0 PROCEDURE .3

Volume II IP-2003 Rev. 7 CR WATCH CHEMIST 1.0 PURPOSE 1.1 This procedure provides instruction to the Watch Chemistry in the Control Room or Simulator for performing Dose Assessment calculations.

2.0 RESPONSIBILITIES 2.1 Watch Chemists are responsible for Dose Assessment calculations, while the EOF is being staffed and/or while the EOF is being transferred to the AEOF.

2.2 The Watch Chemist position is a normal on-duty staff position, See E-Plan Volume II, Appendix A for current staffing.

3.0 REFERENCES

3.1 E-Plan, Volume I, Section 5.0, "Organizational Control of Emergencies" 3.2 EP Form, #4, "Control Room Emergency Staffing Chart" 3.3 Form EP-1, Part I, 'NYS Radiological Emergency Data Form" 3.4 Form EP-2, Part II, UNYS Radiological Emergency Data Form" 3.5 IP-EP-310, "Dose Assessment' 3.6 IP-EP-410, "Protective Action Recommendations" 3.7 IP-2000, "Emergency Activation of the Control Room" 3.8 IP-EP-51 0, "Meteorological, Radiological and Plant Data Acquisition System" 4.0 PROCEDURE NOTE Initial the blank lines upon completion of the designated step 4.1 Card in if appropriate for accountability.

4.2 Obtain the Watch Chemist E-Plan position book.

4.3 Get a turnover on the event from the Control Room crew to determine if a release is in progress and if so determine the release point (document on Event Log Sheets located in the position book).

Page 3 of 8

Volume 11 IP-2003 Rev. 7 4.4 Synchronize your time with the CR flight panel clock or remove watch. L 4.5 Using the PC at the STA location, sign on (using your personal ENN sign-on) and open the desktop E-Plan Folder.

4.6 Obtain Met tower data using one of the following methods:

  • Control Room meteorological display panel.
  • Unit-2 Control Room meteorological display panel (phone 9-734-5294). I

Login as CCREOF and hit enter (Time will be displayed in Eastern Standard Time and wind speed will be in mph [mph x .447 = meter/sec].

  • For any other back-up method refer to IP-EP-510, "Meteorological, Radiological and Plant Data Acquisition System".

4.7 Determine whether or not the release is greater than the IPEC Effluent l Technical Specifications by one of the following methods. I

  • IP-EP-510, "Meteorological, Radiological and Plant Data Acquisition System".
  • The following table:

Release Point Rad Monitor Tech Spec Release Rate Setpoint Plant Vent uCVsec R-27 60,000 uCi/sec NG or 20 uCisec Iodine Plant Vent uCi/cc R-44 (U2) I R-14 (U3) 2E-3 uCi/cc SG Safety or Main Steam Line If there isANY identified Pri to Sec Leak, the Atmospheric Mons Iodine Tech Spec release rate limit is exceeded if a Safety or Atmospheric valve opens.

Hole in the VC R-25126 I R/hr

  • IF an unmonitored release path exists, THEN estimate the release rate and in BLOCK 6 of Form EP-1 Part 1,circle MD" I Page 4 of 8

Volume II IP-2003 Rev. 7 4.8 Determine the magnitude of the release using one of the following:

  • IP-EP-310, "Dose Assessment" and IP-EP-410, "Protective Action Recommendations".

4.9 IF there is no release due to the event AND A General Emergency has not been declared, THEN record the following on Form EP-1 Part I, "NYS Radiological Emergency Data Form" within 15 minutes of the initial E-Plan classification or classification change(s) and every 30 minutes thereafter.

  • In BLOCK 6, circle "A" and record "A" in the box.
  • In BLOCK 7, circle "A" and record "A" in the box.
  • In BLOCK 11, enter wind speed and elevation (10 meters) from Step 4.6.
  • In BLOCK 12, enter wind direction & elevation (10 meters) from Step 4.6.
  • In BLOCK 13, circle stability class and record letter in box per Step 4.6.
  • Provide Form EP-1 Part I to the ED for review.
  • After the ED has reviewed the Form EP-1 Part I, provide the form to the clerk for faxing.

4.10 IF there is a release due to the event that is below IPEC Tech Spec

(< 60,000 ptCi/sec NG and < 20 uCi/sec Iodine) AND the site boundary doses are below Protective Action Recommendations (< I Rem whole body {TEDE}

and < 5 Rem thyroid {TODE}) AND A General Emergency has not been declared, THEN record the following on Form EP-1 Part I, "NYS Radiological Emergency Data Form" within 15 minutes of the initial E-Plan classification or E-Plan classification change(s) and every 30 minutes thereafter.

  • In BLOCK 6, circle "B"and determine if the release is to the atmosphere or water and check the appropriate box record "B" in the box.
  • In BLOCK 7, circle "A"and record "A" in the box.
  • In BLOCK 11, enter wind speed and elevation (10 meters) from Step 4.6.
  • In BLOCK 12, enter wind direction from and elevation (10 meters) from Step 4.6.

Page 5 of 8

Volume II IP-2003 Rev. 7

  • In BLOCK 13, circle the stability class and record the letter in the box from Step 4.6.
  • Provide Form EP-1 Part I to the ED for review.
  • After the ED has reviewed the Form EP-1 Part I, provide the form to the l clerk for faxing.

4.11 IF there is a release due to the event that is above IPEC Tech Spec (>60000 uCUsec NG or 20 uCi/sec Iodine) AND Site Boundary Doses are below Protective Action Recommendations (< I Rem whole body {TEDE) and < 5 Rem thyroid {TODE)) AND a General Emergency has not been declared, THEN record the following on Form EP-1 Part I and Forrn EP-2 Part II , "NYS Radiological Emergency Data Forms" within 15 minutes of the initial E-plan classification or E-plan classification change(s) and every 30 minutes thereafter.

Fill out Form EP-1 Part I as follows:

  • In BLOCK 6, circle UCn and determine if the release is to the atmosphere or water and check the appropriate box record 'C" in the box.
  • In BLOCK 7, circle 'A' and record 'A" in the box.
  • In BLOCK 11, enter wind speed and elevation (10 meters) from Step 4.6
  • In BLOCK 12, enter wind direction from and elevation (10 meters) from Step 4.6.
  • In BLOCK 13, circle the stability class and record the letter in the l box from Step 4.6.

4.11.1 Fill out Form EP-2 Part II as follows:

  • In BLOCKS 16, 17, 18, and 19 fill out the known data in the appropriate spaces per the Dose Assessment program. Fill in NIA for the results/data that are unknown.

4.11.2 Provide Form EP-1 Part I and Form EP-2 Part II to the ED for review.

4.11.3 After the ED has reviewed the Form EP-1 Part I and Form EP-2 Part II, provide the form to the clerk for faxing.

Page 6 of 8

Volume II IP-2003 Rev. 7 4.12 IF A General Emergency is declared OR Site Boundary Doses are above Protective Action Recommendations (> 1 Rem whole body (TEDE) or > 5 Rem thyroid (TODE}), THEN record the following on Form EP-1 Part I and Form EP-2 Part II, "NYS Radiological Emergency Data Forms" within 15 minutes of the initial E-plan classification or E-plan classification change(s) and every 30 minutes thereafter.

4.12.1 Fill out Form EP-1 Part I as follows:

  • In BLOCK 6, circle the appropriate letter, which corresponds to the type of release in progress and record that letter in the box.
  • In BLOCK 7, circle "1B and C" and record "B" and "C"in the box. In section "B"circle the appropriate ERPA's per the IP-2003 computer program or applicable E-Plan procedures, IP-EP-510, uMeteorological, Radiological and Plant Data Acquisition System.
  • In BLOCK 11, enter wind speed and elevation (10 meters) from Step 4.6.
  • In BLOCK 12, enter wind direction from and elevation (10 meters) from Step 4.6.
  • In BLOCK 13, circle the stability class and record the letter in the box from Step 4.6.

4.12.2 Fill out Form EP-2 Part II as follows:

  • In BLOCKS 16, 17, 18, and 19 fill out the known data in the appropriate spaces per the Dose Assessment program.

Fill in N/A for the results/data that are unknown.

4.12.3 Provide Form EP-1 Part I and Form EP-2 Part II to the ED for review. -

4.12.4 After the ED has reviewed the Form EP-1 Part I and Form EP-2 Part II, provide the forms to the clerk for faxing.

4.13 Ensure you are signed in on EP-Form #4, "Control Room Emergency Staff Chart".

4.14 Display the plume direction on the 10-mile map using the plume overlay.

Page 7 of 8

Volume II IP-2003 Rev. 7 4.15 Recalculate the Dose Assessment as necessary based on changes in release rate or Met data and re-evaluate the PARs as necessary.

4.16 Update the ED of any changes that could affect the release rate, dose assessment calculation or PARs.

END OF TEXT Page 8 of 8