NRC FORM 195 (2.76) t U.S. NUCLEAR REGULATORY C DISTRIBUTION FQR PART 50 DOCKET MATERIAL, l'RC ISSION DOCKET NUMBER 50-220 FILE NUMBER MONTHLY REPORT TO: FROM: DATE OF DOCUMENT NRC, Niagara Moha~7kt Power Corp. :2/2/77 Syracuse, NY 13202 R. R. Schnhi er DATE RECEIVED

/ 2/8/77 QLETTER 0 NOTOR IZ6 D PROP INPUT FORM NUMBER OF COPIES RECEIVED

@ORIGINAL g UN C LASS IF I E D 1 Cy Q COP Y DESCRIPTION ENCLOSU RE LETTER TRANS THE FOLLOWING: MONTHLY REPORT FOR Januar 197 PLANT & COMPONENT OPERABILITY &

AVAILABILITY, THIS REPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS &

( 0 I ~,PL)

OPERATIONS'ine Mile Point Unit 1 ACgyp~

DGgg)

DP >PT REMOVE FOR ACTION/INFORMATION X MIPC CYS FOR AC ON INTERNAL DISTRIBUTION PDR

-BRANCH CHIEF L arrish EXTERNAL DISTRIBUTION CONTROL NUMBE R 1360 NRC FORM 196 I2.76)

'k 'll

,t g+ ~

J\

NIAGARA MOHAWK POWER CORPORATION NIAGARA

~ MOHAWK 300 ERIE BOULEVARD. WEST SYRACUSE. N. Y. I3202 R'egutatory Docket FiIi Feb~y 2, 1977 0(gce, o$ Plane 8 Schedule V~mto~e, of Unkted ~u olaehingkon, V.C.

Licerukng Nuef~ Regulatory 20555 CommQ ak on

~

FEBS

.~

)yy.

RHGUMQAE i

.RE: 'Dock& No. 50-220 GmtLemen:

Sub~ed hneuMh. ~ Che, Oping S~ RepoM Joe She, moeth o$ 3anuaIIIJ 1977 Joe Che,, N~ne KQ!e, Po~ Nues~ PouIW S~on Unit'l.

Very ~y you@6, R.R. SckmufeII, VL ce PauM~-

Efmtru,c Paodu~on (fAS/atm

~chme~

APPENDIX C OPERATING DATA REPORT DOCKET NO 50-220 UN) T Nine Ni 1 e P DATE 02/03/77 COMPLETED BY T.J. er ins TEI EPHONE 315 343-OPERATING STATUS .

1. REPORTING PERIOD: 770101 770131 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (MIN: 5 MAX. DEPEND. CAPACITY (MWe Nei): 610 DESIGN ELECTRICAL RATING (bIWe.Net):
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe.Net):
4. REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIV E

6. NUMBER OF HOURS REACTOR WAS CRITICAL 744 744 46,469.4
6. REACTOR RESERVE SHUTDOWN HOURS 1,188.0
7. HOURS GENERATOR ON LINE 744 744 44,250.8
8. UNIT RESERVE SIIUTDOWN HOURS 20.2
9. GROSS THERMAL ENERGY GFNERATED (MWH) 1338 810 1 338 810 70 640 317
10. GROSS ELECTRICAL ENERGY GENERATED (MiWH) 442,689 442,689 23,180,744 11 NET ELECTRICAL ENERGY GENERATED (MWH) 428,572 428,572 22,459,493
12. REACTOR SLRVICE FACTOR 100 100
13. REACTOR AVAILABILITYFACTOR 100 100 75:0
14. UNIT SERVICE FACTOR,
16. UNIT AVAILABILITY FACTOR 100 100 69.6
16. UNIT CAPACITY FACTOR (Using MDC) 94.4 94.4 57.9 94 ' 94.4 5P.9
17. UNIT CAPACITY FACTOR (Using Design 0/IWc)
16. UNIT FORCED OUTAGE RATE 12.4
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MiONTHS (TYPE, DATE, AND DURATION OF EACH):

REFUELING -'March 6, 1977 - 12 wee's

20. IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPF RATION): FORFCAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

NINE >1ILE PODilT NUCLEAR STATION

. NT.AG 'OHKRX POt'ER CORPORAT.TO l AVERAGE DAILYUbllT PO)VER LEYEL DOCKET"NO. 50-220 Nine Mi 1e Point 81 DATE 02/03/77 COMPLETED BY T.J.'erkins TELEPHONE (315) 343-2110 ext. 1312

~

fOXTrI Januar 1977 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPONER LFVEL

(~I)Ye-X~'et) PI%'e-N e t) 1 580.9 578.0 584.4 576.8 582. 7 19 582.1 20 577.0 583. 5 574.7 572.8 23

. 584.4 523.5 582.0 10 578.7 'S 58 582.5 27 581.8.

581.1 581. 9 13 583.4 581.6 582.1 30 578.2 584.5 31 574.7 581.8

NINP. MILE POINT NUCLEAR STATION NIAGARA MOHAMK POWER CORPORATION DOCKET NO. 50-220 UN(T SHUTDOWNS AND POWER REDUCT)ONS Nine Nile Point 81 DATE COMPLETED BY TELEPpOgp (315)343-2110 ext. 1312 P

@EPOPT MOgT[-(

METHOD OF TYPE SHUTTING DOmtN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) COB R ECTIVE ACTIONS/COMMENTS (I) REASON h: Eoulf MEvr FAILURE (Exr LAIN) (2) METHOD II: MAINT. OR TEST I: MANUAL SEIMARY:

C: REFUELING 2: MANUALSCRhibf.

. D: REGULhTORY RESTRICrION 3: AUTOMATICSCRAM L: OPERATOR TRAININGAND 4; OTIIEI<<ExfLAIN)

LICENSE EXAMINATION Pl ADMINISI'RATIVE G; Ol'LRATlONAf.ERROR (EXPLAIN)

H: OTHER (EXPLAIN)

~ ~ h>>