TSTF-17-01, Response to NRC Questions on TSTF-505-A, Provide Risk-Informed Extended Completion Times

From kanterella
Revision as of 09:08, 8 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Response to NRC Questions on TSTF-505-A, Provide Risk-Informed Extended Completion Times
ML17270A270
Person / Time
Site: Technical Specifications Task Force
Issue date: 09/27/2017
From: Gustafson O, Morris J, Sparkman W, Vaughan J, Linda Williams
BWR Owners Group, Babcock & Wilcox Co, Combustion Engineering, PWR Owners Group, Technical Specifications Task Force, Westinghouse
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML17290B229 List:
References
TSTF-17-01
Download: ML17270A270 (2)


Text

11921 Rockville Pike, Suite 100, Rockville, MD 20852 Phone: 301-984-4400, Fax: 301-984-7600 Administration by EXCEL Services Corporation TECHNICAL SPECIFICATIONS TASK FORCE A JOINT OWNERS GROUP ACTIVITY TSTF September 27, 2017 TSTF-17-01 PROJ0753 Attn: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Response to NRC Questions on TSTF-505-A, "Provide Risk-Informed Extended Completion Times"

Reference:

Letter from T. McGinty and A. Boland (NRC) to Technical Specifications Task Force (TSTF), "Issues with Technical Specifications Task Force Traveler TSTF-505, Revision 1, 'Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b'," dated November 15, 2016 In the referenced letter, the NRC raised concerns with approved TSTF traveler, TSTF-505-A, Revision 1, "Provide Risk-Informed Extended Completion Times." The NRC published in the Federal Register a notice of availability for the Model Safety Evaluation (SE) for plant-specific adoption of TSTF traveler TSTF-505, Revision 1, on March 15, 2012. Currently, several licensees have License Amendment Requests (LARs) under NRC review to adopt risk-informed Completion Times.

On December 13, 2016, the TSTF and the Nuclear Energy Institute (NEI) met with the NRC to discuss the NRC's concerns. Most of the NRC concerns were related to proposed Technical Specifications (TS) Actions related to all trains of a TS required system being inoperable. The industry proposed the following short-term and long-term actions to resolve the NRC concerns:

1. The industry will pursue development of a companion traveler for TSTF-505-A that addresses the NRC issues with Actions related to inoperability of all trains of a TS required system (referred to by the NRC staff as a loss of safety function). Following approval, plants that have adopted TSTF-505-A without these Actions could submit a LAR to adopt the companion traveler. Following NRC approval of the companion traveler, plants that have not adopted TSTF-505-A can adopt TSTF-505-A and the companion traveler in a single LAR.
2. TSTF-505-A allows licensees to choose which Action changes are included in their LAR.

The TSTF will recommend to the industry that until the companion traveler is approved by the NRC, licensees submitting LARs to adopt TSTF-505 follow the guidance in the attachments to this letter. Actions related to the inoperability of all trains of a TS required system should not be included in LARs submitted prior to approval of the companion

TSTF-17-01 September 27, 2017 traveler. Omitting these Actions and incorporating the other changes recommended in the attachments to this letter should allow timely approval of LARs. Attachment 1 contains a list of the Actions revised by TSTF-505-A that should be omitted in LARs submitted prior to approval of the companion traveler. Attachment 1 also includes conforming changes to the TSTF-505-A Section 1.3 TS example and the TS Section 5.5 Administrative Controls program. Attachment 2 contains a list of Actions revised by TSTF-505-A that have conditions on their inclusion in a plant-specific LAR. Attachment 3 contains a revised Model Application for requesting adoption of TSTF-505-A.

3. The proposed actions only apply to future submittals. The licensees with LARs currently under NRC review will decide how to proceed.

The TSTF requests that the NRC rescind the suspension of the approval of TSTF-505-A, Revision 1, and accept LARs to adopt TSTF-505-A that follow the recommendations in the attachments to this letter.

Should you have any questions, please do not hesitate to contact us.

James R. Morris (PWROG/W)

Lisa L. Williams (BWROG)

Otto W. Gustafson (PWROG/CE)

Jordan L. Vaughan (PWROG/B&W)

Wesley A. Sparkman (APOG)

Enclosure cc:

Mirella Gavrilas, Director of the Division of Safety Systems Anne T. Boland, Director of the Division of Operating Reactor Licensing Jennifer Whitman, Acting Chief of the Technical Specifications Branch Michelle Honcharik, Technical Specifications Branch