TABLE 4.1-1 (Continued)

CllANNEL DESCRIPTION CllECK TEST CALIBRATE REMARKS

[

ep 4

28. Radiation Monitoring Systems W(1)(3) M(3) Q(2) (1) Using the installed check CD

-. source when background is less 4 cb than twice the expected increase

- 3 . in cpm which would result from

4h the check source alone. Back-C3 ground readings greater than this

'l value are sufficient in themselves to show that the monitor is functioning.

(2) Except area gamma radiation monitors RM-C6, RM-07, and RM-C8 which are located in high radia-tion areas of the Reactor Building.

i c- These monitors will be calibrated i & quarterly or at the next scheduled

" reactor shutdown following the quarter in which calibration l would normally be due, if a shut-down during ehe quarter does not l occur.

I (3) Surveillances are to be performed only when containment integrity is required, This applies to monitors which initiate containment*

isolation only.

29. liigh and Low Pressure Injection Systems: Flow Channels NA NA R i