ML20004F025

From kanterella
Jump to navigation Jump to search
Page 4-5a to Tech Specs Change Request 103
ML20004F025
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/10/1981
From:
METROPOLITAN EDISON CO.
To:
Shared Package
ML20004F021 List:
References
NUDOCS 8106160407
Download: ML20004F025 (1)


Text

_

TABLE 4.1-1 (Continued)

[

CllANNEL DESCRIPTION CllECK TEST CALIBRATE REMARKS ep CD 28.

Radiation Monitoring Systems W(1)(3)

M(3)

Q(2)

(1) Using the installed check 4

source when background is less cb than twice the expected increase 4

3 in cpm which would result from 4h the check source alone. Back-C3 ground readings greater than this

'l value are sufficient in themselves to show that the monitor is functioning.

(2) Except area gamma radiation monitors RM-C6, RM-07, and RM-C8 which are located in high radia-tion areas of the Reactor Building.

These monitors will be calibrated i

c-i quarterly or at the next scheduled reactor shutdown following the l

quarter in which calibration would normally be due, if a shut-down during ehe quarter does not l

occur.

I (3) Surveillances are to be performed only when containment integrity is required, This applies to monitors which initiate containment isolation only.

29.

liigh and Low Pressure Injection Systems:

Flow Channels NA NA R

i i

4 i

l 4