ML20078G488

From kanterella
Revision as of 21:14, 24 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1983
ML20078G488
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/01/1983
From: Kennedy D, Peterson D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC
References
NUDOCS 8310120254
Download: ML20078G488 (4)


Text

.

OPERATING DATA REPORT DOCKET NO 50-255 DATE 10-1-83 COMPLETED DY DAPeterson TELEPHONE (616)764-8913 OPERATING STATUS Notes

1. Unit Name: Palisades
2. Reporting Period: 830901-830930 3.' Licensed Thermal Power (MWt): 2530

,4 Nameplate Rating (Gross MWe): 811.7 .

- 5. Design Electrical Rating (Net MWa):

805

6. Maximum Dependable Capacity (Gross MWe): *675

'7.: Maximum Dependable Capacity (Net MWe): *635

8. If Changes Occur.in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:
9. - Power Level to Which Restricted, if any (Net MWe):

- 10. . Reasons for Restrictions, if any:

This Month Yr-to-Date Cumulative

11. Hours In Reporting Period 720 6551 103,286
12. Number of Hours Reactor Was Critical 0 5336.7 59,259.7
13. Reactor Reserve Shutdown Hours - - -
14. Hours Generator On-Line 0 5283.6 56,278.5

-15. ' Unit Reserve Shutdown Hours - - -

16. Gross Thermal Energy Generated (MWH) 0 12,723,432 115,360,224
17. -Gross Electrical Energy Generated (MWH) 0 3,980,520 35,750,440

- 18. Net Electrical Energy _ Generated (MWH) 0 __ 3,769,958 33,628,014

19. Unit Service Factor 0 80.6 54.5
20. . Unit Availability Factor 0 80.6 54.5 ~~~

21.: Unit Capacity Factor (Using MDC Net) 0 90.6 51.3

22. Unit Capacity Factor (Using DER het) 0 71.5 __,

40.4-

23. Unit Forced Outage Rate 0 1.7 32.4
24. Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of Each):

25,- If Shut Down at End of Report Period, Esciamted Date of Start Up: 12/01/83

26. Units in-Test Status (Prior to Commercial Operation): Forecast Achieved ..

-INITIAL CRITICALITY <^\

INITIAL ELECTRICITY s s

COMMERCIAL OPERATION CB2:ed'on condenser backpressure.

MR0883-0001A-TC01 83101R0254 831001 PDR ADOCK 05000255 R PDR

[ J' T m_ -

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 10/01/83 COMPLETED BY DAPeterson TELEPHONE (616)764-8913 MONTH SEPTEMBER, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 17 2 18 3 19 4 20 5 21 6 22 7 23 8 24 9 25 10 26 11 27 N 12 28 13 29 14 30 15 31 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

MIO883-0002A-TC01

SUMMARY

Oh' OPERATING EXPERIENCE FOR SEPTEMBER 1983 The Plant remained shutdown for refueling.

MR0883-0001B-TC01

l Consumets Power 1 Company Polisados Nuclear Plant: Route 2, Box 154, Covert, MI 49043 October 3, 1983 US Nuclear Regulatory Comr ission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DRP-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of September, 1983.

&auo'cf/77 Mr sd~j<

David M Kennedy Reactor Engineer CC: DVanDenBerg, Palisades

-JGKeppler, USNRC JRSchepers, P24-308 DJVandeWalle, P24-614B RMKrich, Palisades Resident Inspector, Pelisades DLHackett, P11-228B LTPhillips, P21-327 DEVanFarowe, Div of Radiological Health, Lansing, Michigan SMicrzwa, Michigan Dept of Labor RCallen, Michigan Public Service Commission KMFarr,. Palisades Records Center, INPO, Atlanta, CA PSepcenko, CE, Palisades RLRosenfeld, P26-204B Document Control, 950*22*35*10/L DV:83*061

///

. . _ .. . -.