ML20078G488
| ML20078G488 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 10/01/1983 |
| From: | Kennedy D, Peterson D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC |
| References | |
| NUDOCS 8310120254 | |
| Download: ML20078G488 (4) | |
Text
.
OPERATING DATA REPORT DOCKET NO 50-255 DATE 10-1-83 COMPLETED DY DAPeterson TELEPHONE (616)764-8913 OPERATING STATUS Notes
- 1. Unit Name: Palisades
- 2. Reporting Period: 830901-830930 3.' Licensed Thermal Power (MWt): 2530
,4 Nameplate Rating (Gross MWe): 811.7 .
- 5. Design Electrical Rating (Net MWa):
805
- 6. Maximum Dependable Capacity (Gross MWe): *675
'7.: Maximum Dependable Capacity (Net MWe): *635
- 8. If Changes Occur.in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:
- 9. - Power Level to Which Restricted, if any (Net MWe):
- 10. . Reasons for Restrictions, if any:
This Month Yr-to-Date Cumulative
- 11. Hours In Reporting Period 720 6551 103,286
- 12. Number of Hours Reactor Was Critical 0 5336.7 59,259.7
- 13. Reactor Reserve Shutdown Hours - - -
- 14. Hours Generator On-Line 0 5283.6 56,278.5
-15. ' Unit Reserve Shutdown Hours - - -
- 16. Gross Thermal Energy Generated (MWH) 0 12,723,432 115,360,224
- 17. -Gross Electrical Energy Generated (MWH) 0 3,980,520 35,750,440
- 18. Net Electrical Energy _ Generated (MWH) 0 __ 3,769,958 33,628,014
- 19. Unit Service Factor 0 80.6 54.5
- 20. . Unit Availability Factor 0 80.6 54.5 ~~~
21.: Unit Capacity Factor (Using MDC Net) 0 90.6 51.3
- 22. Unit Capacity Factor (Using DER het) 0 71.5 __,
40.4-
- 23. Unit Forced Outage Rate 0 1.7 32.4
- 24. Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of Each):
25,- If Shut Down at End of Report Period, Esciamted Date of Start Up: 12/01/83
- 26. Units in-Test Status (Prior to Commercial Operation): Forecast Achieved ..
-INITIAL CRITICALITY <^\
INITIAL ELECTRICITY s s
COMMERCIAL OPERATION CB2:ed'on condenser backpressure.
MR0883-0001A-TC01 83101R0254 831001 PDR ADOCK 05000255 R PDR
[ J' T m_ -
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 10/01/83 COMPLETED BY DAPeterson TELEPHONE (616)764-8913 MONTH SEPTEMBER, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 17 2 18 3 19 4 20 5 21 6 22 7 23 8 24 9 25 10 26 11 27 N 12 28 13 29 14 30 15 31 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
MIO883-0002A-TC01
SUMMARY
Oh' OPERATING EXPERIENCE FOR SEPTEMBER 1983 The Plant remained shutdown for refueling.
MR0883-0001B-TC01
l Consumets Power 1 Company Polisados Nuclear Plant: Route 2, Box 154, Covert, MI 49043 October 3, 1983 US Nuclear Regulatory Comr ission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DRP-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of September, 1983.
&auo'cf/77 Mr sd~j<
David M Kennedy Reactor Engineer CC: DVanDenBerg, Palisades
-JGKeppler, USNRC JRSchepers, P24-308 DJVandeWalle, P24-614B RMKrich, Palisades Resident Inspector, Pelisades DLHackett, P11-228B LTPhillips, P21-327 DEVanFarowe, Div of Radiological Health, Lansing, Michigan SMicrzwa, Michigan Dept of Labor RCallen, Michigan Public Service Commission KMFarr,. Palisades Records Center, INPO, Atlanta, CA PSepcenko, CE, Palisades RLRosenfeld, P26-204B Document Control, 950*22*35*10/L DV:83*061
///
. . _ .. . -.