OPERATING DATA REPORT DOCKET NO 50-255 DATE 10-1-83 COMPLETED DY DAPeterson TELEPHONE (616)764-8913 OPERATING STATUS Notes 1.

Unit Name: Palisades 2.

Reporting Period:

830901-830930 3.'

Licensed Thermal Power (MWt):

2530

,4 Nameplate Rating (Gross MWe):

811.7

- 5.

Design Electrical Rating (Net MWa):

805 6.

Maximum Dependable Capacity (Gross MWe): *675

'7.:

Maximum Dependable Capacity (Net MWe):

  • 635 8.

If Changes Occur.in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:

9. -

Power Level to Which Restricted, if any (Net MWe):

- 10.. Reasons for Restrictions, if any:

This Month Yr-to-Date Cumulative

11. Hours In Reporting Period 720 6551 103,286
12. Number of Hours Reactor Was Critical 0

5336.7 59,259.7 13.

Reactor Reserve Shutdown Hours

14. Hours Generator On-Line 0

5283.6 56,278.5

-15. ' Unit Reserve Shutdown Hours

16. Gross Thermal Energy Generated (MWH) 0 12,723,432 115,360,224
17. -Gross Electrical Energy Generated (MWH) 0 3,980,520 35,750,440

- 18.

Net Electrical Energy _ Generated (MWH) 0 __

3,769,958 33,628,014

19. Unit Service Factor 0

80.6 54.5

20.. Unit Availability Factor 0

80.6 54.5 ~~~

21.: Unit Capacity Factor (Using MDC Net) 0 90.6 51.3 22.

Unit Capacity Factor (Using DER het) 0 71.5 40.4-

23. Unit Forced Outage Rate 0

1.7 32.4 24.

Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of Each):

25,-

If Shut Down at End of Report Period, Esciamted Date of Start Up:

12/01/83

26. Units in-Test Status (Prior to Commercial Operation):

Forecast Achieved

-INITIAL CRITICALITY

<^\\

INITIAL ELECTRICITY s

s COMMERCIAL OPERATION CB2:ed'on condenser backpressure.

MR0883-0001A-TC01

[ J' T

83101R0254 831001 PDR ADOCK 05000255 R

PDR m

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 10/01/83 COMPLETED BY DAPeterson TELEPHONE (616)764-8913 MONTH SEPTEMBER, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 17 2

18 3

19 4

20 5

21 6

22 7

23 8

24 9

25 10 26 11 27 N

12 28 13 29 14 30 15 31 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

MIO883-0002A-TC01

SUMMARY

Oh' OPERATING EXPERIENCE FOR SEPTEMBER 1983 The Plant remained shutdown for refueling.

MR0883-0001B-TC01

Consumets Power 1

Company Polisados Nuclear Plant: Route 2, Box 154, Covert, MI 49043 October 3, 1983 US Nuclear Regulatory Comr ission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DRP-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of September, 1983.

&auo'cf/77 Mr sd~j<

David M Kennedy Reactor Engineer CC: DVanDenBerg, Palisades

-JGKeppler, USNRC JRSchepers, P24-308 DJVandeWalle, P24-614B RMKrich, Palisades Resident Inspector, Pelisades DLHackett, P11-228B LTPhillips, P21-327 DEVanFarowe, Div of Radiological Health, Lansing, Michigan SMicrzwa, Michigan Dept of Labor RCallen, Michigan Public Service Commission KMFarr,. Palisades Records Center, INPO, Atlanta, CA PSepcenko, CE, Palisades RLRosenfeld, P26-204B Document Control, 950*22*35*10/L DV:83*061

///

-.