Text
._ _ _ . _ . _ _ _ _ _ . _ _ _ _ . _ . _ _ . . .. .
.s OPERATING DATA REPORT DOCKET NO. _)0 336 DATE 04/04/91 COMPLETED BY C. Neron .
TELEPHONE (203) 447 1791 l EXT. 4417 l l
l QPERATINO STATUS {
Notes: Items 21 and 22 1
- 1. Unit Name: Milletone Unit 2 cumulative are weighted l
- 2. Reporting Period: March 1991 averages. Unit operated I
- 3. Licensed Thermal Power (MWt): 2700 at 2560 MWTH prior to its
- 4. Nameplate Rating (Cross MWe): 909 uprating to the current
-5. Design Electrical Rating (Net MWe): 870 2700 MWTH power level.
6.- Maximum Dependable Capacity (Cross MWe): 893.88 -
- 7. Maximum Dependable Capacity (Net MWe): 862.88
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Throur,h 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level To Vhich Restricted, If any (Net MWe): N/A
- 10. Reasons'For Restrictions, If Any: N/A __
This Month Yr. To Date Cumulative 1
- 11. Hours In Reporting Period 744.0 2160.0 133800.0
- 12. Number Of Hours Reactor Was Critical 744.0 1953.8 98866.4
- 13. Reactor Reserve Shutdown Hours 09 0.0 2205.1
- 14. Hours Generator on Line 744.0 1909 4 94244.2
- 15. Unit Reserve Shutdown Hours 0.0 0.0 466.2
- 16. Gross Thermal Energy Generated (MWH) 2008452.0 _5019662.0 260075726 4
- 17. Gross Electrical Energy Generated (MWH) 669709.5 _j070026.5 79109726.0 ,
- 18. Net Electrical Energ, Generated (MVH) 646560.5 1607255.5 75938305.0
.19. Unit Service Factor 100.0 88.0 70.4
- 20. Unit Availability Factor 100.0 88.0 70.8
- 21. Unit Capacity Factor (Using MDC Net) 100.7 86.2 6 6_._6 22.-Unit Capacity Factor (Using DER Net) 99.9 85.5 65.4
- 23. Unit Forced Outage Rate 0.0 12.0_ 13.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Unit Shutdown At End Of Report Period, Estimated Date of Startup: N/A 26.; Units In Test Status (Prior to Commercial Operation); '
Forecast Achieved INITIAL CRITICALITY N/A __. N/A INITIAL ELECTRICITY N/A N/A
. COMMERCIAL OPERATION N/A N/A g 4170259 910409 re ADOCK 050003 6 PD
_. _ . _ . - _ _ . _ _ . . _ - . _ _ - . _ - ~ . . , - . . _ . . . . , . . . - . . .
s AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. _)0 336 .
UNIT: Millstone Unit 2 !
DATE: 04/04/91 l COMPLETED BY G. Neron TELEPl!ONE: (203) 447 1791 EXT: .4417 MONTil: MARCIL1991 DAY AVO. DAILY POWER LEVEL DAY AVO. DAILY POWER LEVEL (HVe-Net) (MVe Net) 1 871 17 869 2 871 18 868 3 871 19 870 4 870 20 869 5 071 21 869.
6 870 22 869 _
7 871 23 867 8 869 24 867 9 870 25 866 10 870 26 867 11 869 27 866 12 870 28 868 13 870 29 869 14 870 30 867 15 869 31 867 16 869 INSTRUCTIONS i On this format, list the average daily unit power Icvel in MVe-Net for each day in the reporting month. Compute to the nearest whole megawatt, i
l l
I DOCKET NO. 50-336 .
UNIT SHLTTDOWNS /JD PFJG REDUCTIONS -UNIT NAME Millstore 2 .
DATE 04/04/91 COMPLETED BY G. Neron TELEPHONE (203) 447-1791 REPORT MONTH MARCH 1991 EIT. 4417 i No. Date- Type l Duration. Reason2' Method of License Systgm nent Cause & Corrective (Hours) Shutting Event Code Code Action to 3 Down Reactor 3 Report # Prevent Recurrence e
-W/A N/A N/A N/A N/A N/A N/A N/A N/A N/A t
i l
i i 1:F Forced 2 Reason: 3 Method
' Exhibit G - Instructions l S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data
) .B-Maintenance or Test 2-Manual Scram Entry Sheets 'for License
.C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-0161) j E-Operator Training & License Examination Previous month
, 'F-Administrative 5-Power Reduction 5 Exhibit 1 -Same Source G-Operational Error.(Explain) (Duration -0) i H- 9ther (Explain) 6-Other (Explain) 4
. . . _ _ _ __ . . . . . . ._ ~.. - . _ . _ _ _ . . . . ._. _ . . _ _ . _ -. . - - - . _ . ._ _
l REFUELING INFORMATION REQUIIT
- 1. Name of facility: Millstone 2
- 3. Scheduled date for next refueling shutdown: March. 1992
- 3. Scheduled dato for restart following refueling: N/A
- 4. Will refueling or resumption of operation thoroafter require a technical specification change or other license amendment?
Epne at this time _
- 5. Scheduled date(s) for submitting licensing action and supporting information:
ligne
- 6. Important licensing considerations associated with refueling, e.g.,
now or different fuel design or supplier, unroviewod design or performance analysis methods, significant changes in fuel design, new operating procedures Mil:. stone 2 will be replacing _ the Steam Generator sub-angemblies slgrnna the uncomina End of Cycle 11 ref&gling_pptaqq. It is antacinated this will be accomolished under 10CPR 50.59.
- 7. The number of fuel assemblics (a) in the coro and (b) in the spent fuel storago pool:
In Core: (a) 212 In Spent Fuel Pool: (b) 112 HQTE: "hese numbers renresent the total fuel assemblies and consol-
. dated fuel storage boxes in these two (2) Item Control Areas
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has boon requested or is planned, in number of fuel assemblies:
Currently 1277
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licenswi capacity:
1994. Soont Fue: Pool Full, core off load caDacity is reachsd (with ~
-out consolidat:.on).
1998. Core Full. Spent Fuel Pool Full 2009, Soent Fuel Pool Full. core off 'oad caDacity is reached-J gpntincent unon full scale storace of consolldated fuel in the Soent Fuel Pool.