Revised Monthly Operating Rept for Feb 1991 for Millstone Unit 2
ML20084U428
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/28/1991
From: Gibson J
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20084U420 List:
References
NUDOCS 9104170262
Download: ML20084U428 (1)


Text

_ _ _ _

OPERATING DATA REPORT FfVISED DATA DOCKET NO., _hla DATE gj/l),/1L__

COMPIITED isY A Wboon TELE)4!ONE M13) 447._1791

PJt, 4431 OPERATING STATUS Notest Items 21 and 22 1.

Unit Name:

Millstone Unit 2 cumulative are weighted 2.

Reporting Period:

rebruarv 13S9.L sveragee. Unit eporated 3+

Licensed Thermal Power (MWt):

2700 at 2560 MVTil prior to its 4

Nameplate Rating (Cross MWa):

909 uprating to the current 5.

Design Electrical Rating (Net MWe):

870 2700 M1CH power itival.

6._

Maximum Dependable capacity (Cross MWe):

893.88 7.

Maximum Dependable Capacity (Net MWe):

83.Lfl 8.

If Changes occur in Capacity Ratings (Items Nuneber 'l Through 7) Since Last Report.

Give Reasons:

N/A 9.

Power Level To Which Restricted, If any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr..To.Date Cumulative 11..Ilours In Reporting Period 622.J 1416.0 133056.0

10. nusber Of Ilours Reactor Was Critical 656.6 1209.8 981223

.T

13. Reactor Reserve Shutdown llours 00 0.0 2205.5
14. Hours Generator On Line 645.3 1156.4.

93500.2

15. Unit Reserve Shutdown llours 0.0 0.0 tddL2 16, Cross Thermal Energy Generated (MWil)
  • 1687526.,,Q
  • 3011210.0
  • 258067274.4 17.. Cross Electrical Energy Generated (MWH)

, 561376 1 1000 3.U.,,.Q,,,

78440016.5 9

18. Net Electrical Energy Generated (MWil) 540549.5 960695.0 75261744.5
19. Unft Service Factor 96.0 81.7 70.3
20. Unit Availability Factor 96.0 81.7 70.6 l

_21.-Unit Capacity Factor (Using MDC Net) 93.2 78.6 66.4

22. Unit Capacity Factor (Usin6 DER Net) 92.5 78.0_

65.2

23. Unit Forced Outage Rate 4.D 18.3 13.2
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Unit Shutdown At End Of Report Period. Estimated Date of Startup N/A
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved-INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A l;

COMMSRCIAL OPERATION N/A N/A-

  • REVISED DATA VALUES DUE TO TYPO 9104170262 910409 PDR ADOCK 05000336 R