ENS 50493
ENS Event | |
---|---|
16:50 Sep 23, 2014 | |
Title | Agreement State Report - Failure Of A Process Gauge Shutter |
Event Description | {{#Wiki_filter:The following was received from the State of Nebraska via email:
The Nebraska Department of Health and Human Services, Radioactive Materials Program, was notified at 0803 CDT on 9/25/2014 by a representative of the Omaha Public Power District that a Kay Ray fixed gauge Model Number 7080 source shutter failed to close. The device contains approximately 6 millicuries of Cesium-137 originally installed in 1984 with approximately 50 millicuries. The gauge is mounted between two fly ash hoppers approximately 20 feet above the floor. The source closure mechanism on the gauge is connected to a handle located at floor level by a flexible cable. The closure cable is secured so that when the floor handle is operated, the control cable slides inside of the sheath opening/closing the shutter. The outer sheath for the cable became separated from the capture mechanism at the source. The handle on the floor would move but the linkages at the source would only move approximately � inch and then the sheath would move away from the compression fitting. The reason for operating the source shutter was to perform the semiannual function check. This type of failure has been seen in the past and is easily fixed by tightening the screw which secures the end of the cable to the structure. This requires a scaffold to be built up to the source level. NE Incident ID #: NE140005 }} |
Where | |
---|---|
Omaha Public Power District Omaha, Nebraska (NRC Region 4) | |
License number: | 01-39-04 |
Organization: | Ne Div Of Radioactive Materials |
Reporting | |
Agreement State | |
Time - Person (Reporting Time:+40.62 h1.693 days <br />0.242 weeks <br />0.0556 months <br />) | |
Opened: | Howard Shuman 09:27 Sep 25, 2014 |
NRC Officer: | Daniel Mills |
Last Updated: | Sep 25, 2014 |
50493 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[],"imageoverlays":null} | |
Omaha Public Power District with Agreement State | |
WEEKMONTHYEARENS 507802015-01-30T14:20:00030 January 2015 14:20:00
[Table view]Agreement State Agreement State Report - Fixed Gauge Shutter Failed to Close ENS 504932014-09-23T16:50:00023 September 2014 16:50:00 Agreement State Agreement State Report - Failure of a Process Gauge Shutter ENS 497972014-02-05T16:30:0005 February 2014 16:30:00 Agreement State Agreement State Report - Malfunctioning Source Shutter Failed to Close ENS 492382013-08-05T14:50:0005 August 2013 14:50:00 Agreement State Agreement State Report - Shutter Stuck on a Process Gauge ENS 466322011-02-20T14:30:00020 February 2011 14:30:00 Agreement State Agreement State Report - Fly Ash Gauge Shutter Failure ENS 464202010-11-15T17:30:00015 November 2010 17:30:00 Agreement State Agreement State Report - Fly Ash Density Gauge Shutter Fails Open ENS 464042010-11-08T16:15:0008 November 2010 16:15:00 Agreement State Agreement State Report - Process Gauge Shutter Could Not Be Locked Closed ENS 460582010-06-30T16:00:00030 June 2010 16:00:00 Agreement State Agreement State Report - Shutter on Fixed Industrial Gauge Failed to Close ENS 459072010-05-06T18:46:0006 May 2010 18:46:00 Agreement State Agreement State Report - Process Gauge Shutter Malfunction ENS 458012010-03-27T14:50:00027 March 2010 14:50:00 Agreement State Agreement State Report - Fixed Density Gauge Stuck Shutter ENS 457942010-03-25T16:35:00025 March 2010 16:35:00 Agreement State Process Gauge Shutter Malfunction ENS 440012008-01-29T06:00:00029 January 2008 06:00:00 Agreement State Agreement State Report - Missing Tritium Sign 2015-01-30T14:20:00 | |