ML20209A839
| ML20209A839 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 01/22/1987 |
| From: | Stello V NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Asselstine, Roberts, Zech NRC COMMISSION (OCM) |
| References | |
| NUDOCS 8702030456 | |
| Download: ML20209A839 (2) | |
Text
Y ~
.J JAN 2 21987 DISTRIBUTION MEMORANDUM FOR: Chairman Zech Docket' File v R. Vollmer Commissioner Roberts NRC PDR T. Novak Commissioner Asselstine ED0 Reading C. Rossi Commissioner Bernthal PD#3 Rdg. J. Heltemes, AE0D Commissioner Carr T. Rehm L. 01shan H. Denton C. Vogan FROM: Victor Stello, Jr. S. Varga V. Stello Executive Director for Operations CONSIDERATION OF FULL POWER LICENSE FOR
[6"h/[g SURJECT:
BYRON STATION, UNIT 2 Commonwealth Edison has informed us by letter of January 21, 1987 that Byron Station, Unit 2, will be ready to proceed above 5% power on January 23, 1987.
Consideration of full power licensing of Byron Station, Unit 2 is presently scheduled for the week of January 26, 1987. Enclosed for your use is the Byron briefing package, which includes:
- 1. The Comission Briefino Slides
- 2. The Proposed Full Power License
- 3. A copy of Safety Evaluation that is to be attached to the license 4 A copy of the Low Power License, issued on November 6, 1986 The Byron SER and Supplements 1 through 7 are also being provided for background.
UUX " l .'). Cae g V'ictor Stello, Jr.
. _ :;cutive Director for Operations
Enclosures:
As stated cc: SECY OGC CONTACT: L. Olshan x24037 870203045 87012 PDR (WD00 6 9 PDR
- SEE PREVIOUS CONCURRENCE
~
PD#3 P PWR-A
~ ]PD#3 TNovak*
CVogan* -
' L01shan*:mak rqa 1/06/87 g M06/87 g 1 jy87 1/ /87 9
(T ' '
NR NRh '
R . er H .rtt n tello g /87 1p[/87 / 9 /87
.e DISTRIBUTION MEMORANDUM FOR: Chairman Zech Docket File R. Vollmer
.Connissioner Roberts NRC PDR T. Novak Comissioner Asselstine EDO Reading C. Rossi Commissioner Bernthal PD#3 Rdg. J. Heltemes, AEOD Commissioner Carr T. Rehm L. Olshan H. Denton . C. Vogan FROM: Victor Stello, Jr. S. Varga /
Executive Director p/
for Operations p
SUBJECT:
CONSIDERATION OF FULL POWER LICENSE FOR '
BYRON STATION, UNIT 2 ,-,
/
Consideration of full power licensing of Byron Stat [on, Unit 2 is presently scheduled for January 15, 1987. Enclosed for your use is the Byron briefing package, which includes: ,
- 1. The Connission Briefing Slides /
- 2. The Proposed Full Power License
- 3. A copy of Safety Evaluation that is'to be attached to the license 4 A copy of the Low Power License,. issued on November 6, 1986 TheByronSERandSupplements1th[ough7arealsobeingprovidedfor background.
The licensee intends to complete the low power testing and be ready to exceed 5% power on January 27, 1987.
Victor Stello, Jr.
Executive Director for Operations
Enclosures:
As stated cc: SECY OGC CONTACT: L. Olshan x24937 PD83 PD#3 AD:PWR-A PD#3 $ ,
CVogan y 'L01shan:mak SVarga CRossi 1/0/87 1/b/87 1/ /87 1/ /87
/ -
WR-A NRR NRR 0 ovak RVollmer PDenton V ello 1/ /87 1/ /87 1/ /87 1 87