RISK INFORMED TECHNICAL SPECIFICATION TASK FORCE (RITSTF) RISK MANAGEMENT TECHNICAL SPECIFICATION INITIATIVE STATUS NEI RITSTF NEI Biff Bradley 202 739-8083 WOG Jack Stringfellow, Southern Nuclear 205 992-7037 CEOG Alan Hackerott, OPPD 402 533-7276 Tony Pietrangelo 202 739-8081 Jim Andrachek, Westinghouse 412 374-5018 Gary Chung, SCE 949 368-9431 TSTF Donald Hoffman, EXCEL 301 984-4400 Jerry Andre, Westinghouse 412 374-4723 Ray Schneider, CE 860 731-6461 EPRI Frank Rahn 650 855-2037 BWOG Paul Infanger, Progress Energy 352 563-4796 BWROG Fred Emerson, GE John Gaertner 704 547-6169 Stanley Levinson, Framatome 434 832-2768 Dusty Rhoads, Energy Northwest 509 377-4298 Mike Kitlan, Duke 980 373-8348
Page 1 of 8 8/17/2005 INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ RESPONSIBILITY TSTF NUMBER 1 Technical Specification Required Actions Preferred End States
- NRC issued the TSTF-422 Notice of Availability on July 7, 2005.
- TSTF-423 was submitted to the NRC on 8/12/03.
- BWROG working with NRC to address one issue for the Implementation Guidance regarding time to stay above 500 psig in MODE 3.
- NRC plans to issue TSTF-423 Notice for Comment in September 2005.
- BWOG Topical Report (BAW-2441) was submitted to NRC on 1/19/04. The NRC provided RAIs on 6/29/04. The BWOG responded to the RAIs in 2/05.
- NRC is currently reviewing the BWOG RAI responses.
- NRC plans to issue Notice for Comment for TSTF 431 by 12/05.
- WOG plans to submit their Topical in 9/05.
TSTF-431 R0 (BWOG)
(Not created)
RITSTF INITIATIVE STATUS Page 2 of 8 8/17/2005 INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ RESPONSIBILITY TSTF NUMBER 2 Missed Surveillances SR 3.0.3
- Initiative Complete.
TSTF-358 R6 3 Increase Flexibility in Mode Restraints LCO 3.0.4
- The final Implementation Guidance, NEI-03-10, was issued on September 5, 2003.
- Initiative Complete.
- Revisions are needed to clarify the implementation guidance. The TSTF and RITSTF will revise and reissue the implementation guidance in the fourth quarter of 2005.
TSTF-359 R9 4a Individual Risk Informed Completion Times
- Owners Groups (OGs) are pursuing generic Risk Informed Completion Time extensions through OG-specific Topicals and license amendments.
- Ongoing.
- TSTF-373R2 approved on 2/27/04.
- TSTF-430R0 approved on 8/5/04.
- NRC issued the TSTF-454 FRN Notice for Comment on 5/25/05. The TSTF provided comments on 7/25/05. The TSTF is preparing a revision to TSTF-454 to reflect the NRC-approved Topical Report.
- TSTF-439R2 was submitted to the NRC on 6/20/05.
- The NRC expects to issue the TSTF-409R1 CLIIP Notice for Comment in August 2005.
- The NRC expects to complete their review of the Topical Reports that support TSTF-417R0 and TSTF-446R0 in August 2005. Review of the Travelers will follow approval of the Topical Reports. TSTF-373 R2 (CEOG)
TSTF-430 R0 (BWOG)
RITSTF INITIATIVE STATUS Page 3 of 8 8/17/2005 INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ RESPONSIBILITY TSTF NUMBER 4b Risk Informed Completion Times With Configuration Risk Management Program or Maintenance Rule Backstop
- Fort Calhoun, South Texas Project, and Prairie Island have volunteered to develop pilot submittals.
- Fort Calhoun and South Texas Project have submitted their pilots.
- The RITSTF is working to resolve the NRC's comments on the Risk Management Guidelines, the STP submittal, and the Traveler.
- RITSTF will develop a White Paper to address the interface of the a.4 process to the Initiative 4b and Initiative 6 process to show the overlap and transition for ITS and non ITS plants and will provide to NRC in 4/05.
- NRC provided 3 separate RAIs in 8/04 to NEI.
- The RITSTF provided responses to the NRC and met to discuss these responses on 12/15/04.
- NRC visited STP week of 1/18/05 to evaluate applications of Initiative 4b.
- NRC and RITSTF met 3/17-18/05 and 5/3-5/4, 2005 to discuss policy issues. NRC will issue meeting summaries of these meetings.
- NRC will provide comments on the RMTS Guidelines by late 9/05.
- The RITSTF has revised the draft Risk-Managed Technical Specifications (RMTS) Guidelines document incorporating the results of the discussions with the NRC. The revised draft RMTS document was provided to the NRC at the August RITSTF/NRC meeting.
TSTF-424 R0 5a Relocate Surveillance Requirements Not Related to Safety
- Deterministic portion of Initiative 5 transferred to TSTF responsibility.
- TSTF reviewing candidate SRs to be relocated.
- TSTF will provide a Traveler to the NRC by 6/06.
None assigned RITSTF INITIATIVE STATUS Page 4 of 8 8/17/2005 INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ RESPONSIBILITY TSTF NUMBER 5b Relocate Surveillance Test Intervals to Licensee Control
- RITSTF/BWROG/Pilot Plant will be applying the methodology and interfacing with the NRC on the issues in 2004.
- The Limerick lead plant license amendment was submitted on 6/11/04.
- TSTF-425 was submitted to the NRC on 8/31/04.
- NEI provided the formal methodology document to the NRC on 2/3/05.
- NRC reviewed the Limerick LAR, TSTF-425, and the methodology document and issued RAIs 4/12/05 to the RITSTF.
- The 5b subcommittee met with the NRC on June 3 to discuss the RAI responses.
TSTF-425 R0 6a Modify LCO 3.0.3 Actions and Timing 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> - 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />
- On hold.
- On hold for resolution of Initiative 6b and 6c to determine if Initiative 6a is required.
None assigned RITSTF INITIATIVE STATUS Page 5 of 8 8/17/2005 INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ RESPONSIBILITY TSTF NUMBER 6b Provide Conditions in the LCOs for Those Levels of Degradation Where No Condition Currently Exists to Preclude Entry Into LCO 3.0.3
- NRC issued Safety Evaluation for Topical Report on 7/9/04.
- TSTF-426 R0 was submitted to the NRC on 8/30/04.
- NRC issued Safety Evaluation for Topical Report on 7/9/04.
- TSTF-426 R0 was submitted to the NRC on 8/30/04.
- The TSTF has developed Implementation Guidance and will provide it to the NRC in 8/05.
- The TSTF 426 Implementation Guidance was provided to NRC in early 8/05.
- NRC plans to issue the Notice for Comment in September 2005. TSTF-426 R0 RITSTF INITIATIVE STATUS Page 6 of 8 8/17/2005 INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ RESPONSIBILITY TSTF NUMBER 6c Provide Specific Times in the LCO For Those Conditions That Require Entry Into LCO 3.0.3 Immediately
- NRC issued Safety Evaluation for Topical Report on 7/9/04.
- TSTF-426 R0 was submitted to the NRC on 8/30/04.
- NRC issued Safety Evaluation for Topical Report on 7/9/04.
- TSTF-426 R0 was submitted to the NRC on 8/30/04.
- The TSTF has developed Implementation Guidance and will provide it to the NRC in 8/05.
- The TSTF 426 Implementation Guidance was provided to NRC in early 8/05.
NRC plans to issue the Notice for Comment in September 2005. TSTF-426 R0
RITSTF INITIATIVE STATUS Page 7 of 8 8/17/2005 INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ RESPONSIBILITY TSTF NUMBER 7a Impact of Non Technical Specification Design Features on Operability Requirements - Barriers
- TSTF will delete the additions to the definition of OPERABILITY for TSTF-427 to address NRC concerns.
- TSTF-427 implementation guidance was provided to the NRC on 09/21/04. NRC provided comments on the draft guidance on 10/13/04.
- The NRC provided additional questions on the TSTF-427 implementation guidance in a letter dated June 2, 2005. RITSTF to respond.
- Members of the TSTF & RITSTF met with the NRC on 7/28/05 to discuss NRC comments. The TSTF is preparing a revision of TSTF-427 to be submitted to the NRC in October 2005.
- There was discussion of the LCO 3.0.9 that requires revision. The RITSTF will develop changes to LCO 3.0.9 and TSTF 427 Implementation Guidance to address the barrier that affects both trains of a system and the emergent condition of 1 barrier that affects 1 train and the second train becomes inoperable for another reason.
- The revised implementation guidance and revised TSTF-427 will be distributed to the RITSTF for review in September for submittal to the NRC in October 2005.
TSTF-372 R4
TSTF-427 R0
RITSTF INITIATIVE STATUS Page 8 of 8 8/17/2005 INITIATIVE TITLE INITIATIVE STATUS NEXT ACTIONS/SCHEDULE/ RESPONSIBILITY TSTF NUMBER 7b Impact of Non TS Design Features on Operability Requirements - All other SSCs not in Technical Specifications
- A White Paper on the process to address this scope of SSCs is being developed.
- RITSTF/TSTF reviewed and has commented on the revised Operability guidance that will supersede the guidance distributed with GL 91-18.
- RITSTF/TSTF will develop a TSTF and submit to NRC by 6/06.
None assigned 8a Remove or Relocate Systems LCOs That Do Not Meet the 4 Criterion of 10 CFR 50.36 From Technical Specifications
- A White Paper on the application of the 10 CFR 50.36 criteria is being developed.
- NEI 00-04 is being reviewed and will serve as the basis for Criterion 4 application.
- RITSTF will develop a White Paper to outline the guidance and methodology based on NEI 00-04 for the application of the four criteria of 10 CFR 50.36 and a list of the systems identified for relocation. RITSTF working on the schedule - current plans are fourth quarter 2005.
None assigned 8b Modify 50.36 Rule to Permit Removal or Relocation of Non Risk Significant Systems out of Technical Specifications
- Requires Rulemaking
- RITSTF looking at coordinating Initiative 8b with longer term initiatives given the requirements for rulemaking.
- Approach favored by NEI and NRC is making Criterion 4 a "two way door" (e.g., if it doesn't meet Criterion 4, Specification can be relocated even if it meets Criteria 1, 2, or 3).
Not applicable BWOG - Active in Initiatives 1, 4 and 7 CEOG - Active in Initiatives 1, 4, 5 and 6 BWROG - Active in Initiatives 1, 4, 5 and 8 WOG - Active in Initiatives 1, 4, and 5