September 6, 2005 Mr. Biff Bradley Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708
SUBJECT:
SUMMARY
OF MEETING ON AUGUST 17, 2005, WITH THE RISK-INFORMED TECHNICAL SPECIFICATION TASK FORCE
Dear Mr. Bradley:
The purpose of this letter is to transmit the summary of a meeting with the Risk-Informed Technical Specification Task Force (RITSTF). The meeting was held at the U.S.
Nuclear Regulatory Commission offices in Rockville, Maryland, on August 17, 2005. Since the last meeting in April 2005, the Risk Management Technical Specifications (RMTS) Initiative 1 TSTF-423 (Modified End States for Combustion Engineering Plants) and Initiative 7 TSTF-372 (Inoperable Snubbers) have been made available to licensees via the Consolidate Line Item Improvement Process.
Sincerely,
/RA/
T. R. Tjader, Senior Reactor Engineer Technical Specifications Section Reactor Operations Branch Division of Inspection Program Management Office of Nuclear Reactor Regulation
Enclosures:
- 1. Meeting Summary
- 2. Attendance List
- 3. Agenda
- 4. RITSTF Initiative Status
- 5. RMTS Initiative 4b Risk Management Guidance Document, Revised 8/05 cc w/encl: See next page
PACKAGE: ML052490174, LETTER: ML052490179, ENCLOSURE 4: ML052490186, ENCLOSURE 5: ML052490202 OFFICE TSS:IROB-A:DIPM SC:TSS:IROB-A:DIPM NAME TRTjader THBoyce DATE 09/06/2005 09/06/2005 DISTRIBUTION:
ADAMS PUBLIC TSS R/F TSS Staff RidsNrrDipm RidsNrrDssa RidsNrrDssaSpsb RidsNrrDlpm RidsNrrDssaSplb RidsNrrDipmlehb RidsOgcRp RidsAcrsAcnwMailCenter NSaltos (NTS)
MLWohl (MLW1)
GSShukla (GSS)
SPWall (SPW)
WDReckley (WDR)
FMReinhart (FMR)
DGHarrison (DGH)
CKDoutt (CKD)]
DFThatcher (DFT)
SDAlexander (SDA)
PFPrescott (PFP)
KCoyne (KXC)
MDrouin (MXD)
MCThadani (MCT)
GWMorris (GWM2)
YGHsii (YGH)
DHShum (DHS)
RKMathew (RKM)
GWParry (GWP)
ABWang (ABW)
BMPham (BMP)
AJHowe (AJH1)
TWAlexion (TWA)
MAStutzkie (MAS7)
DHJaffe (DHJ)
LAMrowca (LXM4)
JAVail (JAV)
Mr. Biff Bradley cc via e-mail:
Mr. Tony Pietrangelo Mr. Rick Hill Nuclear Energy Institute General Electric Nuclear Energy Mr. Biff Bradley Mr. Michael S. Kitlan, Jr.
Nuclear Energy Institute Duke Energy Corporation Mr. Mike Schoppman Mr. Noel Clarkson Nuclear Energy Institute Duke Energy Corporation Mr. Alan Hackerott, Chairman Mr. Donald Hoffman Omaha Public Power District EXCEL Services Corporation Mr. Jim Kenny Mr. Ted Book Pennsylvania Power & Light Company Framatech-ANP Mr. James Andrachek Mr. R. J. Schomaker Westinghouse Electric Company Framatech-ANP Mr. Jack Stringfellow Mr. J. E. Rhoads Southern Nuclear Operating Company Energy Northwest Mr. Donald McCamy Ms. Deann Raleigh Browns Ferry Nuclear Plant Scientech Mr. Ray Schneider Mr. Ken Canavan Westinghouse Electric Company DS&S Mr. Frank Rahn Mr. Sam Chien EPRI SCE Mr. Wayne Harrison Mr. Gary Chung STP SCE-SONGS Mr. Drew Richards Mr. Courtney Smyth STP PSEG Nuclear LLC Mr. Gabe Salamon Mr. Jerry Andre PSEG Nuclear Westinghouse Electric Company Mr. Gene Kelly Mr. David Helher Exelon Exelon Mr. Glenn Stewart Mr. James Liming Exelon ABSG Mr. Phil Tarpinian Mr. Stanley Levinson Exelon Framatone ANP Ms. Nancy Chapman Mr. John Gaertner SERCH/Bechtel EPRI
SUMMARY
OF THE AUGUST 17, 2005, NRC/INDUSTRY MEETING OF THE RISK-INFORMED TECHNICAL SPECIFICATION TASK FORCE The NRC staff met with the NEI Risk-Informed Technical Specification Task Force (RITSTF) on August 17, 2005, from 9:00 a.m. to 12:45 p.m. The meeting attendees are listed in .
The agenda (Enclosure 3) consisted of discussions of the Risk Management Technical Specifications (RMTS) initiatives, and Initiative 4a generic completion time extension submittals.
The RITSTF provided a summary of the status of the initiatives (Enclosure 4). Following is a brief description of the status of the initiatives in the order in which they were discussed.
Initiative 1, TS Actions End States Modifications: The CE TSTF-422 notice of availability for licensee adoption was published in the Federal Register (70 FR 38729, July 5, 2005), as part of the Consolidated Line Item Improvement Process (CLIIP). NEI will provide a final version of the implementation guidance for BWR TSTF-423, after final issues are resolved. The TSTF-423 model SE will subsequently be published in the Federal Register, requesting public comment as part of CLIIP, in September 2005. The staff has commenced review of the B&W Topical Report RAI Responses. The WOG will submit its Topical Report in September 2005.
Initiative 4a, CT/AOT Extensions: The BWR TSTF-454 PCIV CT Extension draft SE was issued for public comment on May 25, 2005, via CLIIP, and the TSTF provided comments on July 25, 2005. The TSTF is revising TSTF-454. Staff review of WOG TSTF-446 CIV CT Extension draft SE is to be issued for public comment in the near future. STP submitted a license amendment request for CT extensions to the Essential Cooling Water System and various supported systems; it is a non-generic change. This proposed change needs to be considered in conjunction with the proposed RMTS I4b change.
Initiative 4b, Risk Informed CTs/AOTs: The staff provided RAIs on the STP pilot LAR on May 31, 2005. On July 12 and 13, 2005 the staff and STP discussed the RAIs; STP intends to respond to the RAIs in the 1st quarter of FY 2006. The industry and staff will continue to work to define RMTS Initiative 4b requirements with respect to PRA and CRMP scope and capability, and overall process. The industry provided an updated RMTS RMG document at the RITSTF meeting. The industry will provide an updated CE topical report and TSTF-424. The staff will be developing a TI for inspection guidance. The industry and staff will meet again in about one month to continue RMG guidance document discussions and to continue defining RMTS Initiative 4b requirements with respect to PRA and CRMP scope and capability, and overall process.
Initiative 5, Relocation of non-safety SRs (5a) and relocation of all SR frequency requirements (5b) out of TS: Exelon submitted Limericks proposed pilot plant license amendment request on June 25, 2004. The industry submitted an Initiative 5b methodology document in February 2005. The staff provided RAIs on Limericks proposed pilot plant license amendment and the Initiative 5b methodology. In early June 2005 the staff and industry will met to discuss the RAIs. The licensee will provide RAI responses in September 2005. The methodology document will be enhanced.
Enclosure 1
Initiative 6, Modification of LCO 3.0.3 Actions and Completion Times: The staff approved and issued the SER on the CE Topical Report on July 9, 2004. Industry submitted a proposed CE TSTF-426 on August 30, 2004. The staff provided RAIs for CE TSTF-426 on November 13, 2004. Industry provided RAI responses on April 27, 2005, and updated implementation guidance in August 2005. NRC will issue notice requesting public comment in the near future.
Initiative 7, Non-TS support system impact on TS operability determinations: The staff made TSTF-372, Inoperable Snubbers, available via CLIIP (70 FR 23252, May 4, 2005). The staff provided RAIs for TSTF-427 on November 13, 2004. Industry responded to the staffs RAIs on the proposed TSTF-427 implementation guidance on March 23, 2005. Staff and industry are working to resolve RAI issues. Industry will submit a revised TSTF-427 and associated implementation guidance in October 2005.
Initiative 8 a and 8b, Remove/Relocate non-safety and non-risk significant systems from TS that do not meet 4 criteria of 10 CFR 50.36: Initiative 8a would review tech specs to remove systems that were included solely because they were judged to be risk significant at one time and have now been shown by analysis not to be. The RITSTF will develop a white paper on Initiative 8a, outlining the guidance and methodology for implementation, for submittal in the fourth quarter of CY 2005. Initiative 8b would make the scope of technical specifications depend only on risk significance. The RITSTF will interface with the NRC in the development of guidance and a methodology, based on NEI 00-04 (proposed NEI Option 2 implementing guidance), for the application of 10 CFR 50.36 criteria. The RITSTF will develop and submit a white paper on Initiative 8b guidance and methodology for implementation.
The next NRC TSS/NEI RITSTF meeting is to be determined.
NRC/INDUSTRY MEETING OF THE RISK-INFORMED TECHNICAL SPECIFICATION TASK FORCE ATTENDANCE LIST AUGUST 17, 2005 NAME AFFILIATION BIFF BRADLEY NUCLEAR ENERGY INSTITUTE DON HOFFMAN RITSTF/EXCEL SERVICES JIM ANDRACHEK WESTINGHOUSE/WOG STANLEY LEVINSON AREVA WAYNE HARRISON STP NOC RICK GRANTOM STP NOC RAY SCHNEIDER WESTINGHOUSE MIKE KITLAN DUKE ENERGY JIM LIMING ABS CONSULTING/EPRI MICHAEL ADELIZZI PPL SUSQUEHANNA NORMAN STRINGFELLOW SNC STEVEN DOLLEY PLATTS NANCY CHAPMAN SERCH/BECHTEL TOM BOYCE NRC/NRR/DIPM/IROB/TSS BOB TJADER NRC/NRR/DIPM/IROB/TSS DAVID ROTH NRC/NRR/DIPM/IROB/TSS MARK REINHART NRC/NRR/DSSA/SPSB ANDREW HOWE NRC/NRR/DSSA/SPSB JIM VAIL NRC/NRR/DSSA/SPSB LYNN MROWCA NRC/NRR/DSSA/SPSB GEORGE MORRIS NRC/NRR/DE/EEIB JOHN G. LAMB NRC/ACRS STAFF Enclosure 2
AGENDA TSS/NEI RITSTF MEETING AUGUST 17, 2005 9:00 A.M. - 12:30 P.M.
O-12 B4
- 1. Status of Initiatives N Initiative 1, End States BWROG TSTF-423 Status B&W Topical, BAW-2441 N Initiative 5b, SR Frequency Evaluation Methodology/SR Frequency TS Program Limerick Pilot Status/RAI Response Status SR Frequency TS Program/Methodology N Initiative 8, Remove/Relocate non-safety & non-risk significant systems from TS N Public Questions and Discussion N Initiative 6, LCO 3.0.3 Actions and Completion Times CEOG TSTF-426; CLIIP Notice for Comment Status N Initiative 7, Non-TS Support System Inoperability Impact on TS System & TSTF-372 TSTF-427 Status; CLIIP Notice for Comment Status N Public Questions and Discussion N Initiative 4a, Generic RG 1.177 Completion Time Extensions N Initiative 4b, Risk-Informed Completion Times STP Pilot FCS Pilot CE Pilot, TSTF-424 Hope Creek Pilot Prairie Island Pilot RMTS Risk Management Guidance Document
- 2. Public Questions and Discussion N Schedule Next Meeting N Closing Comments Enclosure 3