ML090400347

From kanterella
Revision as of 02:36, 12 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Condition Report CR-IP2-2008-02917
ML090400347
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 06/04/2008
From: Burney M
Entergy Nuclear Operations
To:
NRC Region 1
John Richmond
References
Download: ML090400347 (164)


Text

Originator:

Burney.Michael W Originator Phone: 7073 Originator Group:

Licensing Mgmt Supervisor Name: Walpolt..Kobert W Operability Required:

L' Reportability Required:

Y Discovered Date: 06/04/2008 19:06 Initiated Date: 06/0.1/2008 I9:23 Condition

Description:

During NRC modificaiion inspection, the SI30 App R Died Generator test could not be used to independently verify the Post Mod lest Plan Requirements (PMTP) The documentation within the test was not adequate to demonbtrate that the PMTP requirements.

The \per.ific sections for load, endurance and reliability tebting here not sufficient to conclude that the testing was completed due to the extenhive use of N/A and incomplete commenting.

'The method chosen for performing the test did not demonstrate adequate controls and may not be consistent wit the PMTP. The engine operability is not an issue as much as the control methods used for the test changes with respect to the PMTP revisions required by Engineering Change Notices (ECNs) . Immediate Action

Description:

Briefed management on extent of finding. Suggested Action

Description:

EQUIPMENT:

Tap Name Tap Suffix Name Comoonent Code Process System Code ARDG TRENDING (For Reference Purposes Only):

Trend Type REPORT WEIGHT wu INPO BINNING KEYWORDS HEP FACTOR KEYWORDS KEYWORDS KEYWORDS Trend Code 3 ESPE CM3 KW-APPENDIX R P KW-MODIFICATION TESTING KW-DIESEL GENERATOR KW-NRC OPERABILITY 13erfo4 By: Santini,Philip R Approved By:

Hock,Charle:, E CR-IP2-2008-02917 Operability

Description:

Functionality requirements for the App R diesel are specified in TRO 3.X.B. The surveillance requirements delineated in TRS -3.8.8. I through 3.8.B.9 are met by performance of their applicable surveillance test procedures.

For the initial functionality declaration, these requirements were all verified to be met during acceptance testing.

This condition report descrities apparent record keeping deficiencies in the the post modification testing program which %'as performed under wot k order number 5 I297433 task 0 1. Formal allowance was made in the development of this testing plan to permit changes in content and acceptance criteria.

TRS 3.8.8.5 requires demonstration of the ability to line-up and provide power from the App R diesel to the App R loads, SBO loads and unit 3 SBO loads. The bases for this surveillance requirement explicitly permits a combination of tests and simulated actions. Portions of this SR were satisfied via simulation. Activities which were simulated during the acceptance testing program were doubled in time and still satisfied the required times.

One hour time testing was completed and documented in the PMTP sections 5.13.6 and 5.13.7. Loads were supplied to alternate safe shutdown loads in 45 minutes: to unit 2 SBO loads in 37 minutes and to unit 3 SBO loads in 22 minutes. Comments contained in the work order page 58 and validated against the SOMS narrative log provide assurance that the 20 I hour reliability runs were completed and that the 2400Kw run and dead bus tests were in fact performed as required.

In conclusion, the App R diesel is functional.

-4pproval Comments:

As stated all requirements to demonstrate functionality have been performed.

1 CR-IP2-2008-02917

___. - OPERABILITY 1 fin-zw I I OperaRilityVersion:

2 Operability Code: EQUIPMENT F2:NC'TIONAL Immediate Report Code: K(3T REPORTABLE Performed B!: Dmey Jr.Donald J ~ppmved By: Hock.Charies E Operability

Description:

In addition to the first operability and CAI justifications for functionality of this condition report we ran a simulated walk thruogh of 2-AOP-SSD-I from the initiating event through loading a charging pump onto the App R diesel. Total rime to accomplish the task was 32 minutes which was well within the target or' 60 minutes. 'This walk through vias accomplished ir segments and included transit time and parallel actions. See attached documents for flow chart and procedures used. Based on this walk through, the previous operability, and CAI, the App R dies1 is considered FUNCTIONAL.

Approval Comments:

The simulation provides additional justification for functionality mer. Attachments:

Operability Description Flow Chart 3-AOP-SSD-1 2-SOP-27.6 Attachment Header Document Name: LzzT--- Document Location Pperabtlity Dtkxrrption Attach Titre: IFlow Chart _.

1 I -,, . , .:

Attachment Header Document Name: Document Location perability Description Attach Title:

3.6 @ta@]or 22 AISFP. THEN canthue in this procedure.

Locally trip the turbine. Dispatch an c?peratar to trip &&I M E3 F Ps . Disparct:

ar; operator to perforrfl Attachment 7 (Manuaiiy i~oerltng and Racwy Out 6 9 KV Breakers) (Page 207) for affected RCPs. " .

Control Woorn t nac cessibiiity Safe Shutdown Confrd ____ - - _" _x__I___ I_ ___." _.__ _______-_____.-_.

kC TIQ MIE X P E C TE D RES PUNSE __ I-__ -_-_-__ -I_- _- -__- 4 13 Close both PORV Siock vaives AivO PUCE in Puifout: &bOV - 5 36 4 14 Remove Contra; Power Fuses to isolate Letdown, secure PORVs from spurious operation, and estabtish charging flow path, g455~ (Panel FB rear facing west) g456 (Panel FB rear facirtg west) @LCV-459 (PaneJ SF rear facing 2204A (Pafie1 SF rear facing noch) &G~B i~anei SF rear facing north) @ov-535 north) 4, f 5 ~nriounce reactor trip and CCR evacuation over PA. 4.16 Obtain two sets of security keys from lock box. @ne set tor Conventionai Side RO. @ne sei for CRS. I _.___. Trip any running charging pumps. 2 --Opeti 125 Volt DC Dstribution Panei %I Circait 5 on the back of Panei FD 3.--_0pen 125 Volt DC Distribution Panel 22 Cirwit 15 on the back of Panel FD.

NOTE P he expxistions for the use of persomef are as fallows- c The CRS, one RO and ?he Nuclear !$PO will be preseril on the Nuclear Stde with one copy of this procedure a The second RO ar-,d the Ccrventiona NPO wiit be o:esent ifr the Auxriiary Feed Pgmp Buiiding.

Each person vdf have one copy of tnis prccedure.

c The FSS and Unit 1 fvP0 wit be candtictlng Electr&aJ uperatians, etc with the iast copy ut this pracedure, o The Fire Brigade Leader (Unit 2 or Unit 3 SR0) and 3 NPQs will be fighting a fire iF any fire has occurred.

1F a fire has NOT occurred, duties of these personnel wilt be directed by the SM/CRS/FSS.

4,17 Obtain the fobwing from the Appendix R equipment locker in the CCR foyer: zocedwe package hogbook @wo radios pine trashiight.

meys - SM: -- C3ne radio - One fiashlight

-- Keys RO: - Or?*? radio - One fiasblight II I' ! NOTE For emergency ci3ssificatiorl pwposes, controi of the plan? is considered to be 1 estabiished when cofitrol is establrsried arid reported to SM per Step 4.76 of B from the Uqir 3 CCR, ! d Classify event

.. L; 26 @iTIATE Att~ichm~~t-4 (Piacq 4.27 AGMTE request to Unit 3 control Safe ShUtdOLYrl Pane! m Sctrvrce) (Page 175). Room to monitor f3.SkV system voltage via the Distr'rct Operator - and to notify Unit 2 if 13'8kV vo!iage CAN NOT be maintained bet;lveen 13.5icV 8, : 4.3kV . ..

,r\tt&mpi

o Sl8f-l at least one purnp by transferring LOCAL~REMOTE S'fiiitCh icjr S.E!GC!~ PuniP to LOCAL and pre:ssir?g

';TAR7 blittcrn.

IF w~bk to start at ieast one pump or: essentra!

header, THEN perform the foliowng:

A.JF power is avaitabte to a SW pump that i5 NOT aligned to the essential header, THEN INITIATE the applicable

_I_ section{s) of 2-SOP-24.1 (Service Water System Gperawn) to transfer e s se n ti a I s e rvi ce wa te r he ad e r s asnetessaryr.

S'JV pumps, AND G8OV Switchgear Room is accessible THEN INiTlkSE Attachment 12 (Placing 23 cr 26 Service Water Pmp tn Service Qr Safe Shutdown Power) B.JF power is NOT availabfe to a [Page 233). SW pumps, AND 4SOV Switchgear Room is NOT accessible, THEN piace & diesel generator cuntrd SWWRS in OFF. C --tF power is NOT avalable to any 3.32 aEDGs* AAT instrument air is lost to a running charging pilmp, -dorm the folkwing:

A. - Uncouple air speed L contrc!ler fron scoop tube linkage iabovs pump). i3. .__ Place scoop tube in position ,,, , ,. ....., ~ . . . . . . .. IF NO charging pum gHEN GO TO Stem e operating, 2.--.iF any charging pgmp is operating, THEN GO TO Step 4.96.

i ~ . .. _... ~ ...... .. .,... .. -. .. .. . , . . . ._ .. ........,..

,_ " .,....L_..,.

.. ~ .. - . . . Unit Status I- 2500 (24 RCP Seal VL'ti Injection Lirte Isoiation). - ..

2.-sF krc-aker SS6 (6,SKV %reeker for EktiCn Servrce Tiartsfctmer NO. 6) ts NOT open, THEN perform :he follcwing for breaker SS6. 8.- Remove 51/59 Fhase A relay cGver. 8.- Gently rotate relay disc clockwise until breaker opens. C.--Repiace relay cover. D._.Reset targets. E.- IF breaker did NOT open, THEN lift trip coil picrnger mechanism.

_- __ 3.-GO TO Step 8.5. ._ - .*__ -

8 5 Place "LOCAL-REMOTE Cofitfd $,,c,!tch Cevice 69" for Substation

2FD3 Ereaker IM in LOCAL (in co~trcl paneVbox rjirectly above CHARGING PUMP 23 Breaker Control Swiicnj, !s Substation

! 2FC3 Ere.aker ? pL/I 8.6 *- OPiX? T8.7 &ax transfer switch EDC4 (inside i pes ition ~ t. , /.e-..=--- - - cabinet) to EMERGENCY FEED Page 5 of 1 I ( 3. ? 3 &Open disconfiect switch 1 HR en 8.14 /@anually close LCV-1 12C (VCT OUTLET STOP) (VCT alleyway).

8.15 N~te time LCV-112C was closed (charGirg p~~rnp placed i3n RLZIST SGCtiofi).

__ - -I h?CC-2tiA (LCV-I I2Cf. -_ - " --- _- - __ r" __r __ ----- I_ ~ -_ % .. -- - 8.i6 __KAT CCW to Charging Pumps CAN NOT be estabiished within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, THEN Initiate Attachment 10 Crrarqrrg Ftirrtps)

(!?aCktD COCJ~~~X~

't'%'aT2r sUFP!Y to B.17 - IAAT ?AB ventilation is NOT avaitable, THEN establish afternate PAB ventifaim per 2-SOP-ESP-301, Cornger:satcry Actions. Local Equii;rnent Operation and ................................ - ............

..- . ...............

....................

....................

__ .. ._ ....................................

Attachment Header Document Name: Rtltled Document location I perability Descriptton Attach Tltle: -SOP-27.6 N43TE 111 This sectior; IS writfen for ernergrocy operaion.

if om uf the steps cart !ne Supervisor IC charge mxjt evaluate ccrttinued actrun !f GC controi power is not available io, brwe'r operation.

breakers may be operated rnanuaiiy tismg Sectron $~~~6nua1 Breaker axi 'rttinsfar stditch Operation The starting of the appendrx 8 dreset should not be delayed Requests for opening breakers F3-1 and 52GTii2F shoutd be made by other personnel if possibie.

SO ?hone NQmber: (21 2) 580-6789 00 Phone Number' (212j 58U-6754 De met '- -- ' 4.3 1 wy )I 4.3 I .I !NITIA?E having ths District Operator (50) Open breaker F3-I. .,. REQUEST Notification from DO as sum as breaker ~3-1 has been opened. \ +/' c__ 4.3.2 iNfTfhTE havrng the Unit 3 CCR Open breaker 52GT,W. 4 3 2,t Requesi Norifrcattorf from Unit 3 %CR as SOO~ BS breaker 52GT!2F has been opened. . ': A\ /T' I22 ':,F tor the Diesel Generator air intake

_II_ NOTE Maintaming the City Water flows specrfied ensures that adequate ~olirrne in the City Water Storage Tank is resewed for other pfant activities, i i ..- 4 3.1 1.2 ADJUST Coomg Waterfiow as ioHcws ,AI a) THROT1LE UW-840 to achieve approximately 87 gpm c,-T Sj THROTTLE UW-836 to achieve approximately 118 as indtcated by Fi-7930, Aftercooler Water Flow. gpm as indicated by Fi-7979, Jacket Water Flow, 4,.3,12 E Convent:unatl Servm Water is avaifabfe the CRS gives - permisstor, :a dse ~t as the cooling scarce, THEW ALiGN Canvafitmnaf Sewica \Jl(aier to The Appendix R DE as folfowrj 4.3.12.1 OPEN SW-r-E37 _I..- 4.3.:2.2 ADJUST Cbotrng Water flow as foitaws. ___ a) THAORLE UW-840 to achieve approximately

? 37 gpm as indicated by Ff-7380, Afiercoofer W&er Ff~w I- bf THRUTTFE UW-1336 fO achie~ approximattiiy Z EO ,' g~tn as rndicated ay Flf-7S7S, Jacket Water F:QW ,- r ' 4 3 $3 ENSURE r?":e iotic~pg 3rt?&ti;s WQ OFEN- ,N 4 43 '3 1 f3-f -_-

,- - ! i NOTE ,,,' r-- I I ] e I i I I o _I_ ,/ There IS no time delay when startrng Zhe&&ne ~n manual mode. The default starting sequence is 3 start cycles, comprised of 10 seconds of cranking and 10 seconds of rest. When the coolant reaches operating temperature

$33 the warm-up at idie time is c;ornpie?ed, the generator will rmIp up ?a rated speed and vclltags.

The Appendix 8 Diesel Generator's maximum contivuo~s load rs 2045 kW. Durlrtg an emergency, maximum generatorload is 2700 kW for 25 hour2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br />s/yr.

When staflting ecyip~errt, coordinatim w:h the CRS wifl be necessary to ensure adequate generaror capacipi is avaiiabie I I e -I_---- ._ -%- -1' - ,, ~4' /' 4.3.16 TURFv the OIMANUAL'AUTQ switch 10 in8 MANUAL pOS$t!Gn. .e=.=s-- 1_1_ A.3.17 PRESS AND WOLD !he Manual Run~Stop button tor a rnmirnum of 3 \ ,/' S3COfldS u' a'3 7 1 RELEASE the 44anual Rr.:c,'Siop D~tton.

NO+E i I- _--- 4.3.: 3 jf a Warning Conditian occurs (Warning Status indicator ifiuminates ye!iovvj, THEN PERFORM the foliowing:

4 3.i9.1 - IF the Aiarrn Modti!e warnrng ham annunciated THEM mornantar!!y PUSH ihe PUSH TO SILENCE HORN button REFER 10 tile io!iowiuirsg for ~SSIS~~CG rn correcting

',he condtrr0rr' 4 3 1.3.2 OPERABILITY I CR-IP2-2008-02917 OperabilityVersion:

3 Operability Code:

13QUIPMENT E~'UNC1IONAL Immediate Report (lode: 301' REPORTABLE; Pelformed By: Dewey Jr.Donald J 06/06/20()8 16: I 3 .ipproved By: Brooks.Kevin L. 06/06/20tiS 16: 15 Operability

Description:

lhe Unit 2 SBO and Unit 3 SBO functions of the Unit 2 App R Diesel were performed in a timed simulation.

Attached are the procedures and flow charts associated with these walk thoughs. The Unit 2 SBO scenario was able to demonstrate a 28 minute interval from initiation of the event until 6.9 kv buses 5 and 6 were powered from the diesel. The unit 3 scenario is timed from notification from unit 3 that they require the unit 2 App R diesel until power is supplied to breaker GT/B'T which was 24 minutes. Based on these timed walk throughs it is reasonably assured that the operators will be able to meet their comniir.ted times for supplying Unit 2 APP R diesel power to SBO loads with the current approved procedures as written. 'The Unit 2 Xpp R Diesel remains functional.

Approval Comments:

agree and approve Attachments: Operability Description XPPR U2 SBO U3 SBO Attachment Header Document Name:

ntitled Document Location perability Ciescrtption Attach Titte: pr CR-IP2-2008-02917 CAI 0 pera bi lity Input SBO / Appendix R DG Testing T*e jcaitionai rlernonstration of operability of !he SBO / Appendix R DG can be determined by 1 et e* of the engine generator parameters programmed into and controlled by the PowerCo.?rnand 3200 Digital Paralleling Control The PowerCommand 3200 is a mwoprocessor based generator set rnonrtormg, metering and control system The control provides an operator n!erface :o the gecset, cigKal voltage regulation, dtgital governing and generator set protective furc!tons and automatic paralleling functions Operation of the engine or generator outside the p:o~rarnrned parameter values generates erther a warning signal that is displayed on the control parel screen or automatically mtiates a controlfed shutdown of the engine Attached IS a sertes of Pafameter List Reports tnat are storeo within the PowerCommand 3200 that are accessible by !ne use+ or Cdmmrns via a software interface The attacned reports include the following Engme Specific Data (Page

3) Generator Specific Data (Page
4) Load Profile by Percent Range with Ttme Operated in each load range (Page
5) Duty Cycle Report with Time Spent in each Cycle (Page 6) Fuel Consumption Data (Page 7) Power and Energy Report (Page 8) Engine Protection Adjustment (Pages 9 and IO) AmpSentry Settings (Page I1 ) These are the parameters that the PowerCommand 3200 uses to monitor and assess engine and generator performance during operation.

During the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> continuous run at rated continuous load (PMTP Item 45), the twenty monitored starts / 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> run at rated continuous load (PMTP

!rem 49) and the 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> continuous run at approximately prime rating (2335kW - 2435kW) (PMTP ltem 49) these were the parameters being monitored by the PowerCommand 3200. If any of the parameter programmed thresholds are approached a warning is initiated on the PowerCommand 3200 display and if any threshold is reached, an automatically controlled shutdown of the engine occurs. Since no alarms or shutdowns occurred during operation, it is concluded that the engine / generator operated successfully within its design parameters.

Any shutdown during the continuous or reliability runs would be recorded as a failed test with the associated CR initiated to document the failed test. No CRs associated with the continuous runs or the reliability runs were initiated.

ltein 7 above IS the report of the engine protection settings currently programmed into and monitored by the PowerCommand 3200. The pafameters are as follows: LOP - Lube Oil Pressure HOT - High Oil Temperature LCL - Low Coolant level LCP - Low Coolant Pressure LCT - Low Coolant Temperature MCT - High Coolant Temperature HFT - Hlgn Fuel Temperature HAT - Hiah Aftercooler Temperature HI? - Hlcjn lniet Temperature HBF - High Blowby Flow T5e parameters are provided with "warning threshold" and "shutdown threshold" as previously aisc~sseu Some thresholds are based on rated engine RPM which for this engine is 1800 RPM k~a~ec! on 'be Engine Specific Data Report (Item 1 above) iiei'i a IS tire generator protection settmgs programmed into the PowerCommand 3200 and con!raliea ny the AmpSentry module which is integral to the PowerCommand 3200 CR-IP2-200842917 CA1 Operability Input S80 I Appendix R DG Testing The i load specified ir; Items 3 2nd 4 IS based on the standby rating which IS 2700kW ?regarea By Eric J Anderson Date &5;08 1 Parameter List Report - Capture FllislPCC 3200 fENTERG Y QSK 78 rev3 12~(tfar200dcapj\Mon~~orL4 bouAEngine PwmwAer Norno v 8hW I'nfh Engine Rating Engine Serial Number Engine CPL Number 8241 Engtge R~~lng Time (ERT) 71 25201 hours - __I Ehgine Modei Number QSK78-G6 2790 kWm @) lROO RPM 663oO5 5 5 Eng~ne Hour offstx 0.00000 hours Page 1 of I June 05,2008 Parameter List Report Nominal Frequency www GeasetModelNUXldYX c&nstx serial Number Genset Specification Number Alternator Model Number Aternator Serial Number Genset Build Date Power Factor Rating (3-pW) Controlier On Time (COT) Total kWh Delivered Application kVA hng Three Phase 60 .OoO Standby 2700aQLA BO5 KS4 1470 0 0 0 01 /3 I /2005 ,WDYYY7i 0.80 413.1531 127462 337s hours kWb kVA Page 1 of I June OS, 2008 Parameter List Report P.rAm*cCtr NlIW V8lW L'sits 6OHz Standby kU' Load Profile - <DataTable>, 22,2 kW Load Range, Time spent In kW Range 0-5% W, 2.667 6- 10% Load, O.OO0 11-15% Load,O.M)o 16-20% had, 0.OOO 21-25% hd,O.OIi 26-30% Load, 0.067 3 1-35% Load, 0.383 3640% Load, 0.OOO 41 -45% Load, O.OO0 5 1-55% Load, 0.067 5640% Load. 0.050 66-70% Load, 0.1 17 76-8096 Load, 10.567 8640% Load, 0.OOO ')6-100% Load, O.Oo0 > 100% Load, O.Oo0 46-50% Load, 0.017 6 1 -65 % Load, O.OO0 71 -7S04 Laad, 41.583 8 1 -85?/0 Load, O.Oo0 91 -95% Load, O.OO0 Page I of 1 June 05,.!008 Duty Cycle Report I_c -apturt. FiledPCC 3200 [ENTERGY QSK78 rev3 i2Mar2008.~ap~~onitor~~tory\60 Hz Duty Cycle Histragram Laad hnge 91-1oo%Laad 57.42 1 1-2PA LDad 4.62 7 I-80% lDad 2.87 5 1-60% IDA I .I? 2 1-30% LBid 1.18 0- 1 oo/s Laad 0.02 3 140% Load 0.67 4 1-50% laad 0.62 6 1-70% Laad 0.08 8 1-90% Loid 0.12 Tic Spat ie hngt LII Parameter List Report - Capture Fi3miPCC 320U [EiVTERGY QSK78 rev3 12Mar2008.cup~MonirortH~~orylFuel Prtrescfcr Naw Value t'aits Cumulbve Fuel Cortsumpaion 902s 47 kd Fuel Consurr@ion Since Rest 4025 47 gal Fuel Consumption Rest% Time COT OoooO hours Fuei Consumption Reset Time ERT 000000 hours IL Controller On Ti (COT) 413. I53 1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Engirx Rumng Time (ERT) 71 25201 hours Page 1 of 1 lux 05. ZOOS Parameter List Report Capture Fites\PCC 3200 IENTERGY QSK78 rev3 I2MarZ008.capJtlWonilor~~iorylPower and Energy Pwnmrtcr Kiw v8k 1 nits Total kWb Delivered 127462 kWh - kWh Since Reset kW3 Reset Time (COT) kwh Reset Time (ERT) Controller On Ti (COT) Engine Running Time (ERTI 127452 0 .oooo 0.OOODO 413.1531 7 1 2520 1 kWh hours hours hours h0UX-S Page 1 of 1 Parameter List Report tlegF dcgF seconds seconds dcgF aegF degF Parameter List Report PowerCommand 3200 AmpSentry Settings 7 Device/ Time Delay Functron Settings Settings Notes Snut Gown + 3 OHz 10 seconds Over Frequency I 8'50 dlil Shcit Down - 3 OH2 10 seconds Under Frequency 10 seconds Over Voltage i I 59 7 IDS/> Under Voltage 27 85% 10 seconds AmpSentry Default i Os,ertoad

['tiL?!) 105'0 (0'27OOkw) 60 seconds AmpSentry Default 32 10% 3 seconds AmpSentry Default , Reverse Power (kW) 1 Synchrontre Fail Warning 60 seconds : Fieverse kVAR '20% 10 seconds AmpSentry Default Page 1 of 1 Attachment Header Document Name: Document Location ~escrrptron Attach Title: 2 seo SRO Evenr: Time line to energize a 48OV Bu\ from (iT-2SCh and Xpp R die,\el. Operator simulated walkthrough times as indicated Total time is 28 niinutes CCR Action5 ECA-0.0 IO Min t CCR Close GT-25 or GT-26 1 Min At least one 18OV bus L energized Attachment Header Document Name: Document Location perability De!;cnption Attach Title: I_ 3 sa0 Unit 3 SBO Event: Time line to energize Unit 3 Bus from hpp R diesel via GT/BT Aswmed time for contacting an NPO to perform task.

5 hfin . Operator bimulated walkthrough times as indicated Total time is 24 minutes. Unit 3 i$ assumed to be racking in GT/BT in parallel to Unit 2 steps and the bleaker will be ready to clme when L'Z hpp R power is avai 1 ah le. need for App R power f NPO Start U2 ,QP R Diesel And UU to GTBT I8 Min I Unit 3 CCR Close GTBT 48OV bus 1 Entegy 1 OPERABIIJTY 1 CR-IP2-2008-02917 I----- Operability Version: 4 Operability Code: EQUIPMENT RINCTIONAL.

immediate Report Code: NOT REPORTABIE Performed By: Dewey Jr.&mald J Approved By: Brvoks,Ke~

in L (16/06!2(#18 i 6:3 1 06/06/2008 I6:*34 Operabitity

==

Description:==

To answer the question that the Unit 2 Xpp K diesel can perform its design function of running ontinuously for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> duriiq; an ASSD fire event, Engineering input was solicited.

CA-2 was assigned and the original operahiliry input was revised io add justification for this 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> requirement.

At issue is that the Unit 2 App R diesel was not run for a continuo is 72 hoxs during the acceptance testing. However over the cotuse of this testing it was run at least 20 times for one hour periocls and once at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. All of these runs were pe.rforrned satisfactorily without any warning or Shutdown alarms beirtg received.

In addition all of the runs were supervised by licensed individuals.

engineering, and vender representatives.

Based on this and the attached Engineering justification it is reasonably assured the Unit 2 hpp R diesel will run for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> continuously if needed. It is still considered FUNCTIONAL.

.4pprovsl Comments:

agree and apprvve Attachments: Operability Description 72 Hour Justification 1 Attachment Header Document Name: - rltltled Document Location I- , ,' fO-Descrlptml Attach me:

CR-lP2-2008-02917 CA2 Operability lnput SBO I Appendix R OG Testing The addiiional demonstration of ogerabiiity of the SBO i Appendix R DG can be :Jetermined by review of the engme I generator parameters programmed into and controlled by 1t:e Pov~erCommand 3200 Digital Paralleling Control.

The PowerConjmand 3200 is a rwcroproCessor based generator set monitoring, metering and control system. The control piov:dec, an operator mterface to !he genset. digital voltage regulation, drgitai governing and generalor ser protective functions and automatic paralleling functions. Operation of the engine or generator outside the programmed parameter vaiues generates either a warning signal that is displayed ofi the control panel screen or automatically initiates a controlled shutdown of the ei'rg~ne.

Attached is a series of Parameter List Reports that list the parameter data that is stored In the ?ov;erComrnand 3200 This data IS accessible by me user or Cummins via a software i<ltWfilCe The attached reports inciude the following:

1. Engine Specific Data {Page
3) 2 Generator Specific Data (Page 4) 3. Load Profile by Percent Range with Time Operated in each load range (Page
5) 4. Duty Cycle Report with Time Spent in each Cycle (Page 6) 5 Fiid Consumption Data (Page
7) 6. Power and Energy Report (Page 8) 7. Engine Protection Adjustment (Pages 9 and IO) 8 Ampsentry Settings (Page
11) Tnese are the parameters that the PowerCommand 3200 uses to monitor and assess engine and generator performance during operation.

During the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> continuous run at rated continuous load (PMTP Item 45). the twenty monitored starts with 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> run at rated continuous load (PILlTP Item 49) and the 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> continuous run at approximately prime rating (2335kW - 2435kW) (PMTP Item 49) these were the parameters being monitored by the PowerCommand 3200. If any of the programmed parameter thresholds are approached a warning is initiated on the PowerCommand 3200 display and if any threshold is reached, a controlled shutdown of the engine occurs automatically. Since no alarms or shutdowns occurred during operation, it IS concltided that the engine

/ generator operated successfully within its design parameters.

All runs were controlled and monitored by iP2 licensed operators and witnessed by members from the Design Engineering and Systems Engineering Departments and Cummms Metropower personnel.

All Entergy staff is trained to observe negative trends and take required actions including entering Condition Reports in the Corrective Action Database. Any shutdown during the coritinclous or reliability rws would be recorded as a failed test with the associated CR initiated to docurnent the failed test. No CR's associated with the continuous runs or the reliability runs were 1 nit i a ted . Appendix R fire event.

A 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> run was not part of the overall acceptance testing required by the Post Modification Test Plan (PMTP) for EC5000033794.

The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> continuous run. the 20 one hour runs and the 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> prime fating run, cumulatively represents 46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> of operation of Ihe SBO ; Appendix R Diesel Generator.

As stated above, throughout the duration of these runs the engine and generator performed without incident, with no parameter threshold warnings received and no shutdowns recorded.

This is based on successful operation of the engine and ger:era!or within the warning and shutdown threshold data as documented in the attached reports Based on the successhi operation of the SBO 1 Appendix R &esse\ Generator for the duratian of these tests within the manitored engine and generator parameters, and particularly during the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> continuous rbn at rated continuous load, it is reasonable to conclude that the unit woGid 9e capable of operating continuously at rated continuous load for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. aid rno::itored by !he PowerCornrnand 3200 The parameters are as foilows: The SBO I Appendix R Diesel Generator is required to operate for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> during an item 7 above is the report of the engine protection settings currently programmed into LOP -- i-sbe Oil Pressure kOT - Hi@ Oil Temperature 6/6/2008 CR-IP2-200842917' CA2 Operability Input SBO I Appendix R DG Testing LCL ?OW Cooian! level LCF - io1,v C;oo!ant Pressure LCT Low Cootant Temperature HCT - Wlgh Coolant Temperature HFI - t-itgr, Fuei Temperature HA r - High Aftercooler Temperature hi7 - I-Iigh Inlet Temperature kEF - tl~yb BIOWOY FIOW The Daramerers are provided with "warnrng threshold" and "shutdown threshold" as previously discusseo Some thresholds are based on rated engine RPM which for this engine is 1800 RPM based on the Engine Specific Data Report (item 1 above) Item 8 IS tne generztor protection settings programmed into the PowerCommand 3200 and coritfolled by the Ampsentry module which IS tntegrat to the PowerCommand 3200. lhe '% load specified

!n Items 3 and 4 IS based on the standby rating whrch LS 2700kW. 6i612008

, // June 05,2008 Parameter List Report __ Captve FifestPCC 3200 [ENTERCY QSK78 rev3 I21WarZ008.~apj\Mon~~rtAbou?lEngine Parameter Nrm VaJw lRi& Enginc MCrCeel Numbm QSK78 -G6 Engine Rating E..nglne CPL Nwnher 8241 - 2790 kWm@ IGcxf RPM Engine Sed Number 66300555 Eng~ne Hour offset 0.oOoM) h0UI.S Engm Running Tim (ERT) 71 25201 hours June 05,2008 Parameter List Repart Capture FifeslPCC 3200 [ENTERGY QSK 78 rev3 i2~ur2~~8.~~p~~.~on~~~r~

bod\Gensct Paraloctct Name Vat- 1. eih Number of Phases Three Phasc mng Tw Standby Censet Model Number 2700 DQLA Genset Send Number Specification Number 0 Alternator Model Number 0 Alternator serial Number 0 Genset Build Date Power Factor Rating (3-phase) 0.80 Controller On Time (COT) Total kwh k1ivaet.i 127462 c Connection Tvp~ WYe Nomnal Frequency 60 .OOo lfz BO5 KS4 1470 0 I /3 1 12005 MMDDWW 413 .I 53 1 Apptimtion LVA Wing 3375 hours0.0391 days <br />0.938 hours <br />0.00558 weeks <br />0.00128 months <br /> kWh kVA Page i of I h Parameter List Report Prnmetcr Yams Value Units 60Hz StanjtY kW Load Profile - <Datafable>, 22.2 LW Load Range, Time spcnr in kW Range 0-5'10 bad, 2.667 6-10% IAd, O.OO0 i1-11i4b Load, 0.000 16-20% Load, 0.000 2'1 -25% bid, 0.017 26-30% Load, 0.067 36-40?4 Load, 0.000 31 -35% had, 0.383 41 -45% had, 0.OOO 46-50% Load, 0.017 51 -55% had, 0.067 564% Load, 0.050 61 -65% Load, O.Oo0 66-70% Load, 0.1 17 71 -75% had, 41.583 76-80% had, 10 S67 81 -85% Load, O.Oo0 8640% Load, O.OO0 91 -95% Load, 0.m Y6-1OO% bd.0.000 :' 100% Load, 0.000 Pagc i of 1 June 05.2 008 Duty Cycle Report 4.62 z.x7 1.72 1.18 0.02 0.67 0.62 0.08 0.12 i'agc I of t June 05.2008 Parameter List Report _I Capture Files\PCC 3200 (ENTERGY QSK78 rev3 121Wor20061.cap~~nit~rlHIs~urylFur~

Panmeter lamt Value i'aiis Fuel Cowimption Strrcr Resitt 9025.1'7 _I Cumulative Fuel Consumption 9025 47 gaf Fuel Consumption Reset Time COT oOo(20 h0US Fuel Consumption Reset Time ERT 000000 hours Colltroller on Time (con 413 1531 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.825455e-4 months <br /> E~gix Ru mng Time (ERT) 71 25201 bus June 05.2008 Parameter List Repart \ - Capture .Fi~es\PCC 3200 [BNTERGY QSK 78 rev3 12Mar2008.capJ\Monitor~~i~~~r~1Powct and Energy Psnmcter Name \ rler I'flitn Total kWh Delivetcd I21462 kWh kVv% Srncc Rmt 12.7462 kWh kwh Reset Time (COT) om h0Ul-S kU% Reset Time (ERT) oooocd) hours Controller On Ttm (COT) 4 13.153 I hours EW ~ur~mnp rim ~ERQ 71 25201 horn _.

Parameter List Report dcgF dcgF seconds scconds Parameter List Report PowerCommand 3200 Ampsentry Settings _I Device i Function Settings 810 Shut gown + 3 OHz 87U shut ~OWP - 3 on2 51: : lo@; 27 8596 Cherloac!

rkW) 105% (of 2700kW) 32 10% Synchronize Fa2 Warrmg Time Delay Settings 10 seconds IO seconds 10 seccnds 10 seconds 60 seconds 3 seconds 60 seconds 1 Notes Over Frequency Under Frequency Over Voltage Under Voltage AnipSentry Defadt Ampsentry Default Reverse Power (kW) Ampsentry Default I I ! Reverse kVAR 20% 10 seconds Ampsentry Default L Page 1 of ?

I ASSIGNMENTS Entcvgy CR-IP2-2008-029 17 I i KEPORTABILITY 1 CR-IP2-2008-02917 E?m?fgy Reportabilitj Version: I Report Number: ~eprt code: NOT ~Pomw,~ Boilerplate Code: Performed By : KokeKhxles B 06/05/2(X18 07.42 Reportability

==

Description:==

Recorded condition does not meet repirting criteria of SMM-Li- 108. Functionality requirements for the App R diesel are specified in TRO 3.d.B. The surveillance requirements delineated in TRS 3.8.B. I through 3.8.B.Y are met by performance of their apl~licable surveillance test procedures.

For the initial functionality declaration, these requirements were all verified to he met during acceptance resting. This condition report describes apparent record keeping deficiencies in the the post modific.jtion testing program which was performed under work order number 5 1297433 task 01. Formal allowance was made in the development of this testing plan tu permit changes in content and acceptance criteria.

TRS 3.8.B.8 requires demonstration of the ability to line-up and provide power from the App R diesel to the App R loads, SBO loitds and unit 3 SBO loads. 'The bases for this surveillance requirement explicitly permits a combination of tests and simulated actions. Portions of this SR were satisfied via simulation. Activities which were simulated during the acceprance testing program were doubled in time and still satisfied the required times. One hour time testing was completed and documented in the PMTP sections 5.13.6 and 5.13.7. Loads were supplied to alternate

\afe shutdown loads in 45 minutes; to unit 2 SBO loads in 37 minutes and to unit 3 SBO loads in 22 minutes. Comments contained in the work order page 58 and validated against the SOMS narrative log provide assurance that the 20 I hour reliability runs were completed and that the 2300Kw run and dead bus tests were in fact performed as required.

In conclusion, the App R diesel is functional.

Enrefgy Name CORRECTIVE ACTION CR-IP2-2008-029 17 Assigned By: Dwgn Eng Elrc hlgnit RdFttele,Jowph J hssigned To: Design Eng Elec Staft Subassigned To : Antlerson,Eric Originated Bq : Andermd5x 6/5/7,00R 12 06 19 Performed By: Xndeiwn,F:ric 6/S/2OoX 14.2 I I6 hbperformed BJ : Approved By: Closed By: Raffaele,Joseph J 6/5/2008 16:?3:06 -- -~ Current Due Date: 06/06/ZX)8 Initial Due Date: 06/06/2008 CA Type: ACTION Plant Constraint:

  1. NONE CA

Description:

Probide ddditronal operability input to address NRC concerns regarding SBO / tWP R DG Test Runs. Response:

Subresponse

See dttached additional operahility input. EJA 6/5/08. Closure Comments:

I concui with the response (conclusion) provided.

This CA can be closed Attachments: Resp Description CR-IP2-2008-29 I7 Oper Input Attachment Header Document Name: ..__ ntitled Document Location JResp Descr ption Attach Title: 291 7 Oper Input - .-'

CR-IP2-2008-02917 CAI Operability input S50 I Appendix R DG Testing ?K. c;aai:ional dernow+rztion of operaaiirt) of :he SBO Appendix R DG can be determined by tev#ev* of We eqgine generafor parameters programmed into and controlled by the FowerCorrmand 3200 Rigrtal Paraileiing Control The PowerCommand 3200 's a microprocessor sased generator set monltortng, metering and control system The control provides an ooerator rterface :o the genset. drgital voltage feguiation. digital governing and generator set protective fucc!ions and automatic oaraiteling functions. Operation of the engine or generator outside the programn:ed parameter values generates either it warning srgnal that is displayed on the control pane; screen or automa!rcatly initiates a controlled shutdown of the engine Attached IS a series of Parameter Llst Reports that are stored wrthm the PowerCornmand 3200 that are accessible by

he L.s~: or Cumrnins via a software &terface The attached reports include the following.

' 2 3 3 5 6 7 8 Ampsentry Settings (Page

11) Engine Specific Oara (Page 3) Generator Specific Data (Page
4) ioad Profile by Percent Range with Time Operated in each load range (Page 5) Duty Cycle Report with Time Spent in each Cycle (Page 6) Fuel Consumption Data (Page 7) Power and Energy Report (Page 8) Engine Protection Adjustment (Pages 9 and IO) These are the parameters that the PowerCornmand 3200 uses to monitor and assess engine and generator performance during operation. During the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> continuous run at rated continuous ioad (PMTP Item 45), the twenty monitored starts I 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> run at rated continuous load (PMTP I:em 49) and the 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> continuous run at approximately prime rating (2335kW - 2435kW) jPl\nTP Item 49) these were the parameters being monitored by the PowerCommand 3200. If any of the parameter programmed thresholds are approached a warning is initiated on the PowerCornmand 3200 display and if any threshold is reached, an automatically controlled shutdown of the engine occurs. Since no alarms or shutdowns occurred during operation, it is concluded that the engine

/ generator operated successfully within its design parameters. Any shutdown during the continuous or reliability runs would be recorded as a failed test with the associated CR initiated to document the failed test.

No CR's associated with the continuous runs or the reliability runs were initiated.

liem 7 above is the report of the engine protection settings currently programmed into and monitored by the PowerCommand 3200. The parameters are as follows. LOP - Lube 011 Pressure HCT - High Oil Temperature LCL - Low Coolant level LCP - Low Coolant Pressure LCT - Low Coalant Temperature HCT _- High Coolant Temperature I-IFT -- High Fuel Temperature HAT - H!gh Aftercooler Temperature rilT H:cJh Inlet Temperature HBF - HQh Blowby Flow TY praneters are provided with 'warning !hreshold" and "shutdown threshold" as prevlously cIscL.ssec SoFe tnresholds are based on rated engine RPM which for this engine is 1800 RPM *,riser? or: !ne Epgtqe Specifc Data Report (Item 1 above) !-e*.. 3 :5 the yeserator protection settings programmed into the PowerCommand 3200 and cor:roi!ea sy we AmpSentry module which IS integral to the PowerCornmand 3200 CR-IP2-2008-02917 CAl Operability Input S80 I Appendix R DG Testing 7-e Prepared Eric J Anderso 'om specifled in ltens 3 aod 4 is based on !he standby ra!ing whrch is 2700kW 3ate 650a June OS, 2003 Parameter List Report - Capfure FlieslPCC 3200 fENTERG Y QSK78 rev3 IZMnrZ008.cap~i~onilorl.i bouAEngine Panmetcr hrmc Vatrtc ['nits Engine Moclel Number QSK78 46 Engtne ang Engine CPI. Number 8241 - 2790 kWm @ 1800 RPM Engine Send Number 66300555 Engine Hour Offie 000000 hotours Engme Rumng Time (ERT) 71 252111 h0UTS Page 1 of 1 June os. 3008 Parameter List Report Number of Phases Kominel Frequency RatingTypc.

Censet Midel Number cimset serial Number Genset Specification Numb Altmtor Model Numk Alternator Serial Number Genm Build Date Power Factor Rating (3-phase)

Controller On Time (COT) Total kwh Delivered Application kVA Wng Three Phase 60 .Ooo Standby 2700 T3QI.A BO5K541.1.70 0 0 0 01/31/2005 WDYYYY 0.80 413.1531 127462 3375 Hz hours kWh kVA Page 1 of 1 June 05,2008 Parameter List Report - __ __._ Capture FUeslPCC 3200 [ENTERGY QSK78 rev3 IZMor20.08.cap~~Moni!or\HisiotyId~Hz Sfandby k W Hlsfo,*ran Pammdtr 3smt Vniae L'sib 6QHz standbykW Load Profile - <DataTabie>.

22,2 kW Load Range, Time spent in kW Range 0-5% Load, 2.667 6-10°/o hid, O.Oo0 11-15%Load,0.000 16-20% had, O.Uo0 21-25% L@d,0.017 26-30% Load, 0.067 3 1 -35 % Load, 0.383 36-40% Load, O.Oo0 41 -45% Load, O.OO0 46-50% had, 0.017 5 1-55% Load, 0.067 5640% Load, 0.050 66-10% Load, 0.1 17 6 1 -65 % Ld, O.OO0 I1 -7'5% Load, 41 583 76-80% hd. 10 567 81-85% Load,O.ooO 86-9OYo Load, O.OO0 %-1OO% Load, O.OO0 2. 100% Load, O.OO0 9 1 -95 % Load, 0.OOO Page 1 of I June 05,2008 Duty Cycle Report __I ?apturt? Fifes\PCC 3200 (ENTERC Y QSK78 rev3 I2Mur2508.cap~~oniior~H~tory\6~

Nz Duty Cycle Histog*am

_I Lord hnge 91-1~% k&d 57.42 Tic Spent i8 Range 1 1-2004 toad 7 t -80% Load 5t-6@% Load O-l~!O LoaJ 3 1-400/0 toad 4 1-50"/0 Load 6 1-70% Load 8 1-90% Load ?, I-30% bad 4.62 2.87 1.72 1.18 0.02 0.67 0.62 0.08 0.12 Page i of 1 Jm OS, 2008 .I Parameter List Report - Capture Fii.\PCC 3200 [ENTERCV QSK 78 rev3 I2~ar2008.cap~~n~or\Hisror~,\Fuel Panmeter Name VIfW ['nits IC Cumulative Fuel Cortsumption 9025 47 gal Fuel Consumption Since Reset 9025 -47 ea1 Canmf ler Chr Time (COT) 43.153 1 h0Ul-S En@ne Rumling Time (ERT) 71 25201 hours Fuel Gonsurnption Reset Time COT 0 .oooo hours Fuel Consumption Reset Time ERT 0.00000 hours Page 1 of 1 Parameter List Report kUh Since Reset kWh R& Tim (COT) kW Reset Time (ERT) CoFmlter On Time (COT) Engine Running Time (ERn 127462 0.MMO U.M#xM 413.1531 71 25201 kWh hours hOUrS hours bus Page 1 of 1 Parameter List Report tiegF tkgF uxonds ccconds dcgF cicgF tlcgF Parameter List Report PowerCommand 3200 Ampsentry Settings - 3evice I F: u nct i o n Settings a:c Snut Down + 3 OW2 81 U SnUt Down' - 3 OH2 50 "I 7 0°% 32 7 0% Synchronize Fail itdarning rime Delay Settings 10 seconds 10 seconds 10 seconds 10 seconds 60 seconds 3 seconds 60 seconds Notes Over Frequency Under Frequency Over Voltage Under Voltage Ampsentry Default Ampsentry Default Reverse Power (kW1 Ampsentry Default Reverse KVGR 20% 10 seconds Ampsentry Default Page 1 of 1 I I;=ntWg)/

CR-I P2-2008-02917 - CORRECTIVE ACTION CA Nuniber: 2 Group J Name 1 Dewey Jr.Dcsnald J Anderson.Eric Assigned By: Operations Watch Staff Assigned To: Design Eng Elec Statf Subassigned To : I Originated By: Ktlller,C;eorge W Performed By: Xndrrhan.Eric Subperformecl By: Approve0 By: Closeti By: Dewey Jr,Donald J ._ ~ Current Due Date: 06/07/2008 Initial Due Date: 06/07/2(Hf8 CA Type: OPERABILJTY INPUT Plant Constraint:

  1. NOru'E CA

Description:

Please provide operability input reguarding Appendix R diesels ability to perform 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> loaded run. Response:

Subresponse

See attached Operability Input. EJA 6/6/08. Closure Comments:

Concur with engineering response.

Close CA. .4t tachments:

Resp Description CR-IP2-2008-29 17 CA2 Oper Input Attachment Header Document Name: /Gzz--- Document Location Resp DescriDtion Attach Tltle: k-4-2917 CA2 Ope1 Input I^__.I_ ---

CR-IP2-200842917 CA2 Operability tnput SBO I Appendix R DG Testing The aadirional demonstratton of operability of the SBO /Appendix R DG can be aetermined by revew of the engtne I generator parameters programmed into and controlled by trle PowerCommand 3200 Digital Parallelfng Control The PowerCommand 3200 is a ii'lcroprocessoi based generator set monitoring, metering and control system.

The control pow% an operator Interface to the genset, digital voltage regulation, drgttat governrng and cjenei ator set protective functions and automatic paralleting functions Operation of the engine or geceralor outsde the programmed parameter values generates either a warning signal that IS displayed or7 the convol panel screen or automatically Initiates a controlled shutdown of the em;ine Attached is i! series of Parameter List Reports that list the parameter aafa that is stored in the PowerCornmand 3200 This data is accessibie by the user or Cummins via a software Interface Tee attached reports include the following

? 2 3 4 5 6 7 8 engine Engrne Specific Data (Page

3) Generator Specific Data (Page 4) Load Profile by Percent Range with Time Operated in each load range (Page
5) Duty Cycle Report with Time Spent in each Cycle (Page 6) Fuel Consumption Data (Page 7) Power and Energy Report (Page 8) Engine Protection AdJUShent (Pages 9 and IO) Ampsentry Settings (Page 11) These are the parameters that the PowerCommand 3200 uses to monitor and assess and generator performance during operation. During the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> continuous run at rated continuous load (PMTP Item 45), the twenty monitored starts with I hour run at rated continuous load (PMTP Item 49) and the 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> continuous run at approximately prime rating (2335kW - 2435kW) (PMTP Item 49) these were the parameters being monitored by the PowerCommand 3200. If any of the programmed parameter thresholds are approached a warning is initiated on the PowerCommand 3200 display and if any threshold is reached, a controlled shutdown of the engine occurs automatically.

Since no alarms or shutdowns occurred during operation.

it is concluded that the engine / generator operated successfully within its design parameters.

All runs were controlled and monitored by 1P2 licensed operators and witnessed by members from the Design Engineering and Systems Engineering Departments and Cummins Metropower personnel.

Ali Entergy staff is trained to observe negative trends and take required actions including entering Condition Reports in the Cortective Action Database.

Any shutdown during the continuous or reliability runs would be 'recorded as a failed test with the associated CR initiated to document the failed test.

No CR's associated with the continuous runs or the reliability runs were initiated.

Appendix R fire event.

A 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> run was not part of the overall acceptance testing required by the Post Modification Test Plan (PMTP) for EC5000033794.

The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> continuous run, the 20 one hour runs and the 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> prime rating run, cumulatively represents 46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> of operation of the SBO i Appendix R Diesel Generator.

As stated above. throughout the duration of these runs the engine and generator performed without incident, with no parameter threshold warnings received and no shutdowns recorded. This is based on successful operation of the engine and generator within the warning and shutdown threshold data as documented in the attached reports Based an tho successful operation of the 360 i Appendix R Diesel Generator for the dtiration of these tests within the monitored engine and generator parameters, and particularly during the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> coniinuous run at rated continuous load, it is reasonable to conclude that the unrt would be capable of operating continuously at rated continuous load for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Item 7 above is the report of the engine protection settings currently programmed into 2nd monitored by the PowerCammand 3200. The parameters are as follows: The Si30 / Appendix R Diesel Generator is required to operate for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> during an

(-09 ~ Lube Oil Pressure HOT - Htgn Oil Temperature 61612008 CR-IP2-2008-02917 CA2 Operability In put SBO I Appendix R DG Testing LCL - LOW Coolant level LCP - Low Coolant Pressure LZT - LOW Coolant Temperature HCT -- High Coolant Temperature HFT - !-iigh Fuei Temperatwe HA J High Aftercooler Temperature HIT - H,gh fnlet Temperature HBF - HIGD Bto\niby FIOW The parameters are provided with '.warning threshold" and 'shutdown threshold" as previously ciscmsed Some rhresholds are based on rated engine RPM whrch for this engine IS 1800 RPM based on the Engine Specific Data Report (Item 1 above) Item 8 IS the generator protection settings programmed into the PowerCommand 3200 and controlled by the Ampsentry module which IS integral to the PowerCommand 3200. Tne (Yo ioad specified in Items 3 and 4 is based on the standby rating which is 2700kW. Prepafed By Eric J Anderson Date Page -? of 4 6/6/2008 June 05, ;!008 1 .- Parameter List Report c _I_ Capture #'ikslPCC 3200 (EIVTERGY QSK78 rev3 22MarZ008.ca~~Moni~~~ourlEnginc Parnmctcr Name Value bib Engine Model Number QSK7846 Engine RZU~R~ Enpe CPL Number 8241 Engine Running Time (ERT) 71 25201 hours - 2790 kWm@ l8Ou RPM Engine Serial Number 66300555 Engine Hour offset 0 .m hours Page 1 of I June 05,2008 Parameter List Report I <. - Capfure FiteslPCC 3200 {ENTERCY QSK78 rev3 IZMar2008.capl\Monifurt4boul\Gensd Pnntsrfar

?ism+ Value t.nits Pu'urnbcr of Phases Thnx Phw Rating Type Standby Genset Mode1 Number 2700 DQLA Gewt Senal Number BO5 K541470 c;enset Specification

%umber 0 Alternator Modeel Number 0 Aternator serial Number 0 Genset Build Date Power Factor- Rating (3-phase) 0.80 Controller On Time (COT) 413.1531 Total kwh Delivered 127462 Applicarion kVA Rating 337s 1_1 Connection Type WYe Nominal Frequency 60 .Ooo H2 01 ;3 1 12005 MMDDYYYY hours kWh kVA Page I of I Parameter List Report ~__ Capture FileslPCC 3200 [ENTERGY QSR 78 rev3 12iMar2008.~a~~L~~niinr\~~sloty160Hz Standby k W His fogran Prniineier fiatac 60k. Srandtyy k'k Load Profile Vdoc Uaits <DataTable>, 22.2 kW Load Range, Time spnr in kW Range 0-546 LQad, 2 667 __. 6-10% Load, 0 OOO 11-15% Load, 0 OOO 16-2O?h Load, 0 000 21 -25% Load, 0 017 26-30% Load, 0.067 3 1 -359/b bX& 0.383 36-40O4 Load, 0.000 41 -45% Load, 0.OOO 51 -53% Load, 0.067 5640% Load, 0,050 61 -65% Load, 0.OOO 66 -70% Load, 0. I 17 76-80% had, 10 567 46-500/0 Load, 0.017 71 -75% Load, 41.583 81 -85% Load, 0 OOO 8640% toad, 0.000 91 -95% Load, 0.m 96-100% bad. O.OO0 1 100% Load, 0.OOO Page I at' I lone 05.2008 Duty Cycle Report i ?apture FileslPCC 3200 [ENTERGY QSK78 rev3 f2Mar200$.caplt'Monir~~isior3..\150 ffc Duty Cycle Mi *togram rdRaaigc Time Spent in bn@ 91*100% Load 57.42 1 1-20?& Load 4.62 7 I -SO% Load 2.87 5 140% L3ad 1-72 2 1-30% Load 1.18 0-1 0% Load 0.02 31490 bad 0.67 3 1-50% Load 0.62 6 1 -7OOiO L~ad 0.08 8 1-'M% Load 0.12 June 05.2008 Parameter List Report I 1_1 Capture FilestPCC 3200 [ENTERGY QSK78 rev3 12~#r2006c~~~~nitorllrl;is&ur~!

Fuei Pammttcr Hame \**let UOib - Cumulative Fuel Consumption 9025 '47 sal Fuel Consumption Since Reset 9325.47 gal Fuel Consumption Reset Time COT OoooO hours Fuel Consumption Reset Time ERT 0,00001) hours Controller Ch Time (COT) 413.15 3 I hours Engine Running Time 7 I 2520 I buts lune 05,2008 Parameter List Repurt Page 1 of 1 Parameter List Report tIcgF dcgF dcgF Psgc i u1-2 Parameter List Report F u nc t io n Settings 8iO Shut Down f 3 0I-k 81 U Shut Down - 3 OHz 59 1 ? 09; 32 0% Syochromze Fad Warning PowerCommand 3200 Ampsentry Settings -Device I Time Delay Settings 10 seconds 10 seconds 10 seconds 10 seconds 60 seconds 3 seconds 6Q seconds Notes Over Frequency Under Frequency Over Voitage Under Voltage Ampsentry Default Ampsentry Oefautt Reverse Power (kW) AmpSentrj Default j~s/erse kVAR 20% 10 seconds Ampsentry Default Page 1 of 1 CONDITION KEPORT __ -- Originator:

Burne! .Michael W Originator Phone: 7073 - Originator Group:

1.rcrnsing Mgmt Supervisor Name: li'alpolc,Robert W Discovered Date: 06/04/7,WX I9:06 Operability Required:

Y Reportability Required:

Y Initiated Date: 06/04/20()8 19.24, CR-1P2-2008-02917 Condition

Description:

During NRC modification inspection, the SBO App R Diesel Generator test could not be used to independently verify the Post bfod Test Plan Requirements (PMTP). The documentation within the test was not adequate to demonstrate that the PMTP requirements.

The specific sections for load, endurance and reliability testing here not sufficient to conclude that the testing was completed due to the extemive use of N/A and incomplete commenting.

'The method chosen for performing the test did not demonstrate adequate controls and may not be consistent wit the PMTP. The engine operability is not an issue as much as the control methods used for the test changes with respect to the PMTP revisions required by Engineering Change Notices (ECNs) . Immediate Action

Description:

Briefed management on extent of finding. Suggested Action

Description:

EQUIPMENT:

Tag Name Tap Suax Name Component Code Process Svstem Code ARDG TRENDING (For Reference Purposes Only): Trend Type REPORT WEIGHT wu INPO BINNING KEYWORDS HEP FACTOR KEYWORDS KEYWORDS KEYWORDS Trend Code 3 ESPE CM3 KW-APPENDIX R P KW-MODIFICATION TESTING KW-DIESEL GENERATOR KW-NRC Enfcygy 1 OPERABILITY I CR-IP2-2008-02917 OperabilityVersion:

I Operability Code:

EQUIPMENT FIINCTIONAL Immediate Report Code: NOT REPOR'I'ABI-E Perf04 By: Santini,Philip R 06/05!3~K)X OKMX Approved By: Ho~kCharles E 06/05/2CK)8 0 I 26 Opera bilitp

Description:

Functionality requirements for the App R diesel are specified in TKO 1.H.B. 'The surveillance requirements delineated in TKS -3.X.B. I through 3.8.B.9 are met by performance of their applicable surveill~nce test procedures.

For the initial functionality declaration, these requirements were all verified to be met during acceptance testing. This condition report describes apparent record keeping deficiencies in the the post modification testing program which WHS performed under work order number 5 1297433 task 01. Formal allc~wance was made in the development of this testing plan to permit changes in content and acceptance criteria.

TRS 3.8.9.8 requires demonstration of the ability to line-up and provide power from the 4pp R diesel to the App R loads, SBO loads and unit 3 SBO loads. The bases for this surveillance requirement explicitly permits a combination of tests and simulated actions. Portions of this SR were satisfied via simulation. Activities which were simulated during the acceptance testing program were doubled in time and still satisfied the required times. One hour time testing was completed and documented in the PMTP sections 5.13.6 and 5.13.7. Loads were supplied to alternate safe shutdown loads in 45 minutes: to unit 2 SBO loads in 37 minutes and to tinit 3 SBO loads in 22 minutes. Comments contained in the work order page 58 and validated against the SOMS naiulive log provide assurance that the 20 I hour reliability runs were completed and that the 2400Kw run and dead bus tests were in fact performed as required.

In c.cinclusion, the App R diesel is functional.

.4pproval Comments:

As stated all requirements to demonstrate functionality have been performed.

Attachment Header Document Name: 7' - Document Location perability Description Attach Tltle: 1- _L_

OPERABILITY I CR-IP2-2008-02917 Enm?gy I OperabilityVersion:

2 Operability Code: EQUIPMENT 1rL:NC'TIONXL

[mediate Report Code: NO?' REPOK?'ABL.E Performed By: Dewey Jr.Donald J 06/05i2(~.~

I ti:53 ~ppnwed By: Hock.Charles E C%,/05/2(X)ti 20:49 Operability

==

Description:==

In addition to the fiFSt operability and CAI justifications for fbnctionality of this condition report we ran a simulated walk thruogh of 2-AOP-SSD-1 from the initiating event through loading a charging pump onto the App R diesel. Total time to accomplish the task was 32 minutes which was well within the target of 60 minutes. 'This walk through was accomplished in segments and included transit time and parallel actions. See attached documents for flow chart and procedures used. Based on this walk through, the previous operability.

and CAI the App R dies1 is considered FUNCTIONAL.

Approval Comments:

The simulation provides additional justitlcation for functionality mer. Attachments:

Operability Description Flow Chart 2-AOP-SSD-1 2-SOP-27.6 t t 1 PAB Actions I Atr 8 Stzp 3.4 i To $7 1 L I i Attachment Header Document Name: Document Location b6lity Description Attach Title: f2-AOP-SSD-1

Controd Room inaccessibility Safe Si3utdown Control 4.13 Ciose PORV bbck valves AND PLACE in Puffout: BOV-535 J&&OV-536 4 14 Remove Controi Power Fuses ?o isolate Letdown, S~CU~E PORVs from spLirtws operatiofi.

and Establish charging flow path. g455~ (Panel FB rear facing west) g456 (Panel FB rear facing west) @~~~-459 (Panel SF rear facing a234A [Panel SF rear facing north) &G~B (Panel , - SF ~ rear facing niirthj north) 4.f 5 &nnoilnce reactor trip md GCR evacuation over PA. I ...-. Trip any running charging pumps. 2 ,.-Open 725 Volt DC Gistrrbution Panei 21 CixtJlt 5 on the back of Panel FQ 3. -- Open 125 Volt DC Distribution Panel 22 CircLiit 15 on the bzck of Panel FD.

C ontrot Room lit acces si bit ity Safe Shutdown Controi Page I? cf 329 ~ NOTE _I_ The expecrations for the use of personr-ef ace as fdiows- The CRS, me R6 and the %~rcfeijr NPO wrll be present OR the P?Lictear Side with The second RO and the Ccnventionr;i NPC? ~viit be eresent ifr the Auxriiary Feed Pump Euiidrng.

Each person wil have orre copy of tn,s procedure.

Tne FSS and Unit I NPO will be candtjctlng EIwrfica!

operatjaes, etc with the last copy ut this procedure, The Fire 8rigade Leader (Untt 2 DF Unit 3 SRO) and 3 NPQs wifl be fighting a fire iF any fire has occwred. IF a fire has NUT ocwri-ed, d~ttis of these ~ESOR~~ will be directed by the SM/CRS/FSS.

copy of this procedure s c e I

C 6. nt r o t R 00 m i nc., c c e 5 s i b i f it y Safe Shutdown CGntrol

tidnsit3 rrrig LOCAUREMOTE swtch ir~r ze!ecttsd p~~nip to LOCAL and pressing START button. IF jr.obte to star? aT !east one pump QT: 5 ssen t !a! header , THEN p~dcrrrn the following:

A.-IF power is avarlabfe to a SW pclmp that is NOT aligned to the essential header, THEN INITIATE the applicable section0 of 2-SOP-24.1 (Serace \dater System Gperauon) to transfer e sse n t la I se n'ice wa t E r he ad e r s asnecessary s5Rf pumps, AND L8OV Swirsbgear Kcorn is access!ble, THEN iNi7iATE Attachment f 2 (Placing 23 sr 2C Service Water P,mp tn Service Or Safe Shtdawn Power) 8.JF po~ver is NUT available io anv {Page 233). SW pumps, AND 4SOV Switchgear Room is NOT accessible, THEN piace giJ three diesel generator contfof switches iR OFF. C --E power 1s NOT available to any

... ............ . ..,.---- . ...................

_..- ............

___. ..................

.- ---..__- ............

.........-

l... .--- - __ RESPONSE NOT OETAlNE5 I j ... ACT IO NiEX F EC4 E 0 tl ES PO NSE _____ ___I_xI__.____.

,,_-.__._____._~_I...___..

....... & ............

--r---. ..........

4.32 HAAT instrument air is lost tu a rifnning charging pump, medorm the fo~lowing:

.. ..........

Unco~;ple air speed cont:c!ler from scoop tube linkage iabovs pump). i [ sny charging pump is operating, THEN GO YO SteF 4.9& .........

........ ... .... ...

f E _- 3.-GQ TO Step 8.5. *-

Faye 3 of 11 Page 5 of 11 Attachment Header Document Name: br- Document Location LI Attach Title: -

4.3 Engine start suppiyirrt:

Unit 2 Amendix R loads ..----. NOTE \ I- Tne starting of the appendtx R dtesel should not be delayed Requests far openicg breakers F3-1 and 52GT2F sho~id be made by other personnef if pcssibie.

SO Phone Number: (212) 580-6789 DO Phone Number: (212j 586-6754

--J-+ o Tm Rxx~ RGII-J~ d~m (i 5 Ekvat:or!'

e- 43.4 ENSURE the foi;owirry Ayrrendix R 0:~~4 Generator Fire! Oil Dab Tank \ ~ Indications are Illurninated~

System Resfay Y~U~W iEe itashifig

-- e Powe: A-dariabie Sreeri LED rltilrntnated L-. 4.. ---2.3.5 FERFORM the followrng at the Appendix R DG Day Tank Controi Panel: CHECK FXJ abnormal condition exists as icdicated by a LED i , .,': 4.3.5.3 I' . in a flashing ON sfate and horn sounding.

l___^ a) - iF at any !t:ne afi abnorrna; zcnait;or; 1s se;?s~sa:

LL 1 f PRESS the Aiarn? Silence buttun to silence :he alarm horn -.--,....

2) WHEN the abnormal cofidrtmr:

IS corrected, THEN the a!armmf; LED Is tclrnea OFF sutomaticai!y 4;3(& EbSURE tha: Weaker SBUti IS OF*N (SBOiAFP.

Fi Swinchgear 13 8KV Bus) ENSURE that breaker SBQ/ASS is OPEN (SIJO!APF R C)iesel Generator Swjtchgearj 7 v 111 4.3.7 8 P ERAf lU N t 1 ~----..- -___- --- i _I__ MOTE i Fdainramng the City Water flms specified ensures that adequate tolclme in the Ci?y Water Storage Tank IS reservea for other plant activities, i i I I_r .. 4 3.1 I .2 ,/ a) THROTTLE LJW-840 tu achieve approximately 87 gpm <,*' bj THROTTLE L1W-836 to achieve approximately 1 I8 ADJUST Cooling Water flow as io!lcws: as indicated by Ff-7930, Aftercocler Water Fiow. gpm as indicated by Ft-7979, Jacket Water Flow, .__-I- 4.3 '3.2 52GTf2f; When the coolant reaches operating temperature QB tha warm-up at idid time Is i;ornple?ed, ;he genwator wiil rarrip up io rated speed and voltage. The Appeodix 8 Diesel Gsnarator's rnaxirnurn ccllntinuous toad IS 2045 kW. Durirtg an emergency, maximum generator ioad is 2700 kw for 25 hottrs/yr.

i Q XI! orhe! faults akw the engtne to WE during ?he cool-dowt?

seqclence before srtgine shutdawn, I ? -I- --- 4.3.t 3 a Warning Coflcfitran occurs (Warning Status Indicator ititminates ye!low), THEN PERFORM rhe following.

4 3 79 I _-_ _- E the Aiarm Modu!e warning ham annunciated THEN rnomenizr!!y PUSH the PUSH TO SikENCE HORN button OPERABILITY 1 CR-IP2-2008-02917 - - OperabilityVersion:

3 Operability Code: EQC'IPhlEN?'

  • UNCTIONAI.

Immediate Report Code: REPORTABLE!

Petfamed By: &\bey Jr.Danald J 06/06i2008 I 6: I 3 Approved By: Brooks.Kevin LA OfjiOCilZOt1S 16: I5 Operability

==

Description:==

The Unit 2 SBO and Unit 3 SBO funcrbns of the Unj! 2 App R Diesel were performed in 3 timed simulation.

Attached are the procedures and tlow charts associated with these walk Ihoughs. 'The Unit 2 SBO scenario was able to demonstrate a 28 minute int,:rval from initiation of the event until 6.9 kv buses 5 and 6 were powered from the diesel. The unit 3 scenario is timed from notification from unit 3 that they require the unit 2 App I< diesel until power is supplied to breaker GT/B'T which was 24 minutes. Based on these timed walk thtoughs it is reasonably assured that the operators will be able 10 meet their committed times for supplying Unit 2 APP R diesel power tu SBO loads with the current approved procedures as written. 'The Unit 2 App R Diesel remains functional.

Approval Comments:

agree arid approve Attachments:

Operability Debcription APPR G2 SBO u3 SBO Attachment Header Document Name: ntitled Document Location perabdrty Descnption Attach Titte: PPR CR-1P2-2008-02917 CA1 Operability input SBO I Appendix R DG Testing - i he Liccdional demonstration of operability of !he SBO / Appendix R DG can be determined by ~evew of the er,gine generator parameters programmed into and controlled by

he PowerCo-mand 3200 Digital Paralleling Control The PowerCommand 3200 is a microprocessor based generator set monitoring, merering and control system The control provides an operator ,rtterface tc the genset, aigi:al voltage regulation, digital governing and generator set protective functions and automatic paralleling functions Operation of the engine or generator outside the p-ogrammed parameter values generates either a warntng signal that is displayed on the control parel screen or automarica!ly Initiates a controlled shutdown of the engine Attached is a series of Parameter List Reports tnat are stored within the PowerComrnand 3200 that are accessible by tne use* or Cdmmins via a software interface The attacned reports include the following Englne Specific Data (Page
3) Generator Specific Data (Page 4) Load Profile by Percent Range with Time Operated in each load range (Page 5) Duty Cycle Report with Time Spent in each Cycle (Page 6) Fuel Consumption Data (Page 7) Power and Energy Report (Page
8) Engine Protection Adjustment (Pages 9 and 10) Ampsentry Settings (Page 11 ) These are the parameters that the PowerCommand 3200 uses to monitor and assess engine and generator performance during operation. During the 24 hoilr continuous run at rated continuous load (PMTP Item 45), the twenty monitored starts

/ 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> run at rated continuous load (PMTP !!em 49) and the 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> continuous run at approximately prime rating (2335kW - 2435kW) (PMTP Item 49) these were the parameters being monitored by the PowerCommand 3200. If any of the parameter programmed thresholds are approached a warning is initiated on the PowerCommand 3200 display and if any threshold is reached, an automatically controlled shutdown of the engine occurs. Since no alarms or shutdowns occurred during operation, it is concluded that the engine 1 generator operated successfully within its design parameters.

Any shutdown during the continuous or reliability runs would be recorded as a failed test with the associated CR initiated to document the failed test. No CRs associated with the continuous runs or the reliability runs were initiated.

Item 7 zboLw is [he report of the engine protection settings currently programmed into and monitored by the PowerCommand 3200. The parameters are as follows: LOP - Lube 011 Pressure HOT - High Oil Temperature LCL - Low Coolant level LCP - Low Coolant Pressure LCT - Low Coolant Temperature HCT - High Coolant Temperature HFT - High Fuel Temperature HAT - High Aftercooler Temperature HIT - Hign h!et Temperature Vie pa:aneters are provided with "warning threshold" and "shutdown threshold" as previoilsly GisCLSSed Sore thresholds are based on rated engine RPM which for this engine is 1800 RPM k,/as;eci

,;P tr,e Eggine Specific Data Report (Item I above) HBF - biigh Blowby Flow i:elil d IS tk yenerator protection settings programmed into the PowerCommand 3200 and cgn!rollea by the AmpSentry module which is integral to the PowerComrnand 3200 CR-IP2-2008-02917 CA1 Qperability Input SBO I Appendix R DG Testing The ": load specified in Items 3 and 4 IS based on the standby rating whtch IS 2700kW W+wea By Eric J Anderson Date 6'51'08 June 05.2008 Parameter List Report - Capture Files\BCC 3200 [ENTERGY QSK 78 rev3 12~~at200bcapj\MonitorL4 bouAEngine Paralatter Name Valtlt ('nib mne Md Number QSK78 -C6 Engine Rating Engine Serial Number 66300555 Engine CPL Number 8241 Engirre Runrung Time (ERT) 71.25201 hours + - E90 kWm @ lROO RPM Engine Hour offset 0 .m hours Page 1 of I June 05,2000 Parameter List Report Pinmeter Name Vihrc t'nitx Colmection rype wye Number of PWS Three Phase Nominal Frequency 6o.ooo HZ mns Type Standby cesset Model Number 2700 DQLA Gensct Serial Number Genx?t Specification Number 0 Alternator Model Number 0 Alternator Serial Number 0 &met guild Date Power Factor Rating (3-phase)

Controller On Time (COT) Total kWh Delivered 127462 Application kVA Rahng 3375 BO5 KS4 1470 01 /3 I /2005 MMDDYYYY 0 80 413 1531 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.825455e-4 months <br /> kWh kVA Page I of 1 June 05,2008 Parameter List Report Capture FileslPCC 3200 [ENTERGY QSK 78 rev3 iZMar2008.~ap~Monitor\~i~~oty\60Hz Standby k W Hkslogr xn Parameter Name V8IW L'sitr 6u& Standby kU' toad Profile - cDaraTable>, 22,2 kW Load Range. Time spent in kW Rmgc 0-5% hd, 2.667 6- IOo& Load, O.OO0 11 -15% Lmd, O.OO0 16-20% Lmd, 0.000 21-25% Load,0.017 26-30% Load, 0.067 3 I-35% Load, 0.383 3640% Load, 0.00 41 -45% Load, O.Oo0 46-50% LO&, 0,017 5 1-55?'0 toad, 0.067 5660% Load, 0.050 66-70% Load, 0.1 17 76-80% Load. 10.567 8 1 -85 % Load, O.OO0 86-90?" had, 0.OOO 9 1 -95 % Load, o.Oo0 Oh-100% Load, 0.000 > 100% Load, 0.00 61 -65% Load, 0.OOO 71 -75% Lad, 41.583 Page 1 of 1 June 05,2008 Duty Cycle Report 'aprure FilaiPCC 3200 [ENTERC Y QSK78 rev.? 12Mar2008.~ap~~onitorWisrory\60 Hz Duty Cycle Histogram Latd Range 91-1oo%Load v.42 Tic Spent ie Kzagt 11-20"A Load 7 1-8004 Load 5 140% Load 2 1-30% Load 0- 10% Load 3 140% Load 4 140% Load 6 1-70% had 8 1-90% Load 4.62 2.87 I .72 1.18 0.02 0.67 0.62 0.08 0.12 June 05.2008 Parameter List Report ~ ~~~ - Capture FlIm\PCC 3200 [ENTERCY QSK78 rev3 12Mar2008.~u~~Mon~tor\HtstaryIFuel Pxrrmebcr Xaw VliUC l'aits Cumulative Fuel Consumption 9025 41 gat Fuel Consumption Since Reset 025.47 gal Fuel Consumption Res% Time COT OoooO hours Fuel Consumption Reset Tim ERT 000000 bus Controller On Ti (COT) 413 1531 hOUrS Engine Running Time (ERT) 71 25201 hOLKS c Page 1 of 1 Junc 05, ZOOS Parameter List Report Capiure FiIesIPCC 3200 fENTERGY QSK78 rev3 I2Mar2008.~apl\~~~niiorWjs~oryiPuwer and Energy Parrtntttr Naulc Vduc lait3 Total kWh Delivered 127462 kWh kWh Since Ra 127462 kWh kWh Raet Time (COT) OoooO hours kWh RW Time (ERT) 0.ooOW hours Contmffer On Tune (COT) 41 3.153 I hours Engine Rumng Time (ERQ 71 25201 h0UI-S Page I of 1 I , I .:

PowerCommand 3200 Ampsentry Settings '-Device I Time Delay 1 Function Settings Settings Notes 810 Snut Down i. 3 OHz 10 seconds Over Frequency a1 d Shgt DOWO - 3 OH2 10 seconds Under Frequency 10 seconds Over Voltage i ! 59 7 10% Under Voltage 27 10 seconds AmpSentry Default 1 g:,erioad

kL?!) 795% (of 2700~Wi 60 seconds AmpSentry Default 3 seconds AmpSentry Default 60 seconds I Reverse Power (kW) i 32 10% ; Syxhronize Fail Warning j Reverse kVAR 20% 10 seconds AmpSentry Default I_- Page 1 of 1 Attachment Header Document Name
___I ntitled Document Location perability Descnptm Attach Title: 2 s00 Operator imulated w dI kthrough times 3s indicared
  • CCR SOP-27.6 Att 4 10 Minutes , CCR Ac110r1.z ECA-0 0 10 Min f CCR Close GT-25 or GT-26 I iMin 48OV bus Attachment Header Document Name: L ntitled II_ Documwt Location perability Oescnption Attach Title: _L P 3 SBO Unit 3 SBO Event: Time line to energize Unit 7 HL'S from App R diesel via CiTlBT r Unit 3 CCR Close GTfB'I 1 Min
  • Opera tor > i m u I sed LS 3 1 k thro u gh times as indicated Total time is 24 minutes. Unit 3 is assumed to be racking in GTIBT in parallel to Unit 2 \tcps and the breaker Ni1i be ready to close when UZ App R power is ami 1 ti h le. need for App R power f Assumed time tbr contacting an NPO to perform task. 5 hfin Start U2 .PP R Diesel And UU to GT/BT 18 Min i Enfcvgy OperabilityVersion:

4 Operability Code: EQUIPMENT F.'C!NCTIONAI, Immediate Report Code: NOT REPORTABLE Performed By: Dewey Jr,Donald J 06/06/2(#)8 1 6:3 1 Approved By: Bruoks,Ket'in L 06/06/2008 I6:% Operability

==

Description:==

'To answer the question that the Unit I! App K diesel can perform its design function of running c.ontinuously for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> during an ASSD fire event, Engineering input was wlicited.

CA-2 was assigned and the original operahility input wits revised to add justification for this 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> requirement.

At issue is that the Unit 2 4pp R diesel was not run for a continuous 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> during the acceptance testing. However over the come of this testing it was run at least 20 times for one hour periods and once at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. All of these runs were pe.rformed satisfactorily without any warning or Shutdown alarms being 1-eceived.

In addition all of the runs were supervised by licensed individuals.

engineering, and vender representatives.

Based on this and the attached Engineering justification it is reasonably assured the Unit 2 App R diesel will run for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> continuously if needed. It is still considered FUNCTIONAL.

OPERABILITY CR-IP2-2008-02917 iipproval Comments:

agree and approve Attachments: Operability Description 72 Hour Justification Attachment Header Document Name: rltltled Document Location - f5GDe:;c rrptton Attach Title:

CR-IP2-2008-02917 CA2 Operability input SBO / Appendix R DG Testing The additional uemonstration of oDerability of the SBO 1 Appendix R RG can be determined by* revlew of the engine I generator parameters programmed into and controlled by the PovmCommand 3200 Digital Paralleling Control The PowerConimand 3200 is a 11 Iicrop'ocessor based generator set monitoriny, metering and control system She control pov des an cperator Interface to the genset, digital voltage regulatron, dtgrtai yoverntng and gcnera:or se: protective fuqctions and automatic paraileling functions Operation of the engine or generator outside the programmed parameter values generates either a warning signal that IS displayed OF :he control panel screen or automatically initiates a controlled shutdown of the eirgine Attachec!

IS a series of Parameter List Reports that list the parameter data that is stored in the ?ov;erCornrnand 3200 This data IS accessible by the user or Cumrnins via a software d~tt'rtece The attached reports include the toliowing

' 2 3 4 5 6 7 8 Engine Specific Data (Page 3) Generator Specific Data (Page 4) Load Profile by Percent Range with Time Operated in each load range (Page

5) Duty Cycie Report with Time Spent in each Cycle (Page 6) Fiial Consumption Data (Page 7) Power and Energy Report (Page 8) Engine Protection Adjustment (Pages 9 and ?O) Ampsentry Settings (Page 11 ) These are the parameters that the PowerCommand 3200 uses to monitor and assess engine and generator performance during operation. During the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> continuous run at rated continuous load (PMTP Item 45), the twenty monitored starts with 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> run at rated continuous load (PMTP Item 49) and the 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> continuous run at approximately prime rating (2335kW - 2435kW) (PMTP Item 49) these were the parameters being monitored by the PowerCommand 3200 If any of the programmed parameter thresholds are approached a warning is initiated on the PowerCommand 3200 display and if any threshold is reached, a controlled shutdown of the engine occurs al;tomatically. Since no alarrris or shutdowns occurred during operation, it is ccx-tcluded that the engine / generator operated successfully within its design parameters.

At1 runs were controlled and monitored by iP2 licensed operators and witnessed by members from the Design Engineering and Systems Engineering Departments and Cummins Metropower person:;el All Entergy staff IS trained to observe negative trends and take required actions including entering Condition Reports in the Corrective Action Database.

Any shutdown during the continuous or rehability rljns would be recorded as a failed test with the associated CR initiated to document the failed test. No CR's associated with the continuous runs or the reliability runs were in it i a t ed , APpendix R fire event. A 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> run was not part of the overall acceptance testing required by the Post Modification Test Plan (PLITP) for EC5000033794.

The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> continuous run, the 20 one hour runs and the 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> prime rating run, cumulatively represents 46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> of operation of lrte SBG (I Appendix R Diesel Generator.

As stated above, throughout the duration of these runs the engine and generator performed without incident, with no parameter threshold warnings ietxived and no snutdowns recorded.

This is based on successful operation of the engine and ger:era!or within the warning and shutdown threshold data as documented in the attached reports Based on the successfu! operation of the SBO / Appendix R Diesel Generator for the duratlon of these tests within the monitored engine and generator parameters, and particularly dufiqg the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> continuous run at rated continuous load, it is reasonable to conclude that the lini: ;would be capable of operating continuously at rated continuous load for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. :ii\d mo!%rored by !he PowerCommand 3200. The parameters are as follows: The SBO / Appendix R Diesel Generator Is required to operate for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> during an item 7 above IS the report of the engine protection settings currently programmed into .UP i_Loe Oil Pressiire HOT - Yip Oil 7emperaturc 6/6/2008 CR-lP2-2008-02911 CA2 Operability Input SBO I Appendix R DG Testing LCL Low Cooiari: level LCF - io:v Coolant Pressure LCT - LOW Coolant Temperature hCT -- High Coolant Temperature HFT - hgn Fuel Temperature EA F - High Aftercooler Temperature tilT - High Inlet Temperature h5F - HIY~ Blowby F~CW The parameters are probided wrth "warning threshold" and "shutdown threshold" as previously discussea Some thresholds are based on rated engine RPM which for this engine is 1800 RPM based on the Engine Specific Data Report (Item 1 above) Item 8 is the generator protection settings programmed into the PowerCommand 3200 and corwolled by the Ampsentry module which is integral to the PowerCommand 3200. 1 he "4, load soecrfred In items 3 and 4 IS based on the standby rating which is 2700kW. Prepdrea By Eric J Ariders Joseph Raff Dale 6/6:08 W 6/6/2008 June 05.2008 Parameter List Report ._ : Capture Files\PCC 3200 fEiVTERCY QSK78 rev3 I2~~tZOOd.~ap~Mon~~r\Abou?lEngine Parameter Name Vafw Cki& Englnc Model Numbcr QSK7846 Engine Wing E..ngme CPL Nwnh 8241 2790 kWm @ 18fM WM Engine Sed Number 6630055s Engrnc Hour Offset 0.00000 hOurS En- Ruming Tim (ERT) 71 25201 hours Parameter List Report i Capiwe Fifes\PfX 3200 IENTERGY QSK78 rev3 I~Mar~~08.cup~~.~un~f~ttrlboul\Gensel Parameter Nnmt VJbC L sits Consnxtion Tw WYe _. Number of Phases Nomnal Frequency WR2 Genset Model Number Gawr Send Number (;enset: SpecificatLon Number Alternator Model Number Alternator Serial Number Genset Build Da% Power Factor Rating (3-phiw) Controller On Tim (COT) Total kwh Delivered Apptimtion CVA Rating Three Phase 60 .ooo Standby 2700 DQLA BO5 K54 I470 0 0 0 0 I /3 1 !2W5 WDYYW 0.80 413.1531 127462 3375 fiz hours kWb LVA Pagc i of I Jum 05.10118 Parameter List Report Capture Files\PCC 3300 [ENTERGY QSK78 rev3 IZ~ar2008.capJ~onirort~~fo~IdOHz Standby k W H&togran Pimmcter hame VSfUt Unih 60% Standby kW Load Profile <Datafable>, 22,2 kW Load Range, Time sprnr in kW Rang O-S'fo bad, 2.667 6-10% hd. O.Oo0 11-15% Load, 0.OOO 16-20% had, 0.W 21 -25% hd, 0.017 26-30% Load, 0.067 31 -35% Load, 0.383 36-40% Load, 0.000 41 -45% Load, Q.W 46-50% Lwd, 0.017 5 I-SS% Load, 0.067 5640% Load, 0.050 61 -45% Load, O.OO0 66-70% Load, 0.1 17 71 -75% Load, 41.583 ?6-800/0 Load, 10 Sh7 81 -85% Load, O.Oo0 R6-%% Load, O.OO0 91 -95% had, 0.OOO 96-100% bd. 0.0oO .' 100% toad. 0 000 June 05,2008 Duty Cycle Report I (-' iupture? Fiies\PCC 3200 [ENTERGY QSK78 rev3 12iMar2008.ca~~onitorltiistory160 Cf.. Du@ Cycle Hisrogro rn Thu Spent in Rnngc - ' i,oadwIw 91-1WA Load 57.4; 11-20% Load 4 "62 7 i-80% bad 2 K7 S 140% had 1 .i2 2 1-30% had 1.18 0- 10% Load 0.02 3 140% Load 0.67 4 1-50?~0 Load 0.62 6 1-70041 had 0.08 8 1-90% toad 0.12 Jum 05,2008 Parameter List Report Capture FifeslPCC 3200 fENTERGY QSK78 rev3 I2.~~r200$.caplljWbnitor\H~tory\

Fuel Parameter kame Value I ails Cumulative Fuel Consuwon 9025 47 gal Fuel Consumption Si,xe Rew 9025.17 @I Fuel Cornsumption Reset Time ERT 0 OOOOO burs Co~troll~

On Time (COT) 413 1531 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.825455e-4 months <br /> Engiinc Runrung Time (ERT) 71 25201 horn Fuel Consumption Reset Tim COT om hours Page i of 1 Parameter List Report Parameter List Report dcgF dcgF seconds s cc on ds f';igc I of 2 Parameter List Report PowetCommand 3200 Ampsentry Settings - Device i Function Settings 810 Sktil9own

+ 3 OH2 8lU Shut 20~0 - 3 OHZ 5: : 10% Time Delay Settings 10 seconds 10 seconds lo Seconds 10 seconds 60 seconds 3 seconds 60 seconds Notes Over Frequency Under Frequency Over Voltage Undei Voltage AniPSentry Defabtt Ampsentry Default Reverse Power (kW) Ampsentry Default I 1 Reverse 2VAR 20% 10 seconds Ampsentry Default Page 1 of 1 I REPORT ABILITY Reportability Version: 1 Report Number: Report Code: NOT W-POKT'~ZBL..k Boilerplate Code: Perforled BJ : Kokes,Ch;lrle\

B CR-IP2-2008-02917 Reporta bility

Description:

Recorded cl.mdition does not meet reporting criteria of SMM-Li- 108. Functionality requirements for the App R diesel are hprcified in TRO 3.d.B. The surveillance requirements delineated in TRS 3.8.8.1 through 3.X.B.9 are met bj performance of their applicable surveillance test procedures.

For the initial functionality dcclaracion, these requirements were all verified to he met during acceptance testing. This condition report describes apixirent record keeping deficiencies in the the post modification testing program which was performed under work order number 5 1297433 task 01, Formal affowance was made in the development of this testing plan ti, permit changes in content and acceptance criteria.

TRS 3.X.B.8 requires demonstration of the ability to line-up and pro\ide power from the App R diesel to the App R loads, SBO loads and unit 3 SBO loads. The bases for this surveillance requirement explicitly permits a combination of tests and simulated actions. Portions of this SR were satisfied via simulation.

Activities which were simulated during the acceprance testing program were doubled in time and still satisfkd the required rimes. One hour time testing was completed and documented in the PMTP sections 5.13.6 and 5.13.7. Lmds were supplied to alternate safe shutdown loads in 45 minutes; to unit 2 SBO loads in 37 minutes and to unit 3 SBO loads in 22 minutes. Comments contained in the work order page 58 and validated against the SOMS narrative log provide assurance that the 20 I hour reliakility runs were completed and that the 230OKw run and dead bus tests were in fact performed as required.

In conclusion, the App R diesel is functional.

ASSIGNMENTS I CR-IP2-2008-02917 Entcw 1 r Version: I Significance Code: 13 Classification Code: I.T-XCE CcZKB Owner Group: Operatic%\

\?.dtch Mgmt Performed By: Assignment

==

Description:==

Per 6/9/08 CKG. bring ha& to 6/10/08 CRCi as ksue ma, be CA? .A [JAR) I

- CORRECTIVE ACTION I CA ;rtlumtw:

I CR-IP2-2008-029 17 Subperformed By: Approved By: Closed By: Raffaele,Joseph J 6/5/2!X)X 16:23:06 Current Due Date: 06/06/2(X)8 Initial Due Date: 06/06/7008 CA Type: ACTION Plant Constraint:

  1. NONE CA

Description:

Procide additional operability input to address NRC concerns regarding SBO / APP R DG Test Runs. Response:

See dttdched additional operahility input EJA 6/5/08 Subresponse

Closure Comments:

I concui with the reiponse (conclusion) provded Tb~s CA can be clowd Attachments:

Resp Dewription CR-IP2-2008-29 17 Oper Input Attachment Header Document Name: ntitled Document Location bm Attach Title; -2008-29l7 Oper Input CR-IP2-2008-02917 CAI 0 pe rabil ity Input SBO / Appendix R DG Testing T+wr xmr:ional demoxtration of operaoifity of :he SBO ! Appendix R DG can be determwd by levcevt 01 i~e ecgine generator parameters prugrammed into and controlied by the FowerCorrniand 3200 Digrtal Paralieiing Control The PowerCommand 3200 rs a microprocessor Sased generator set monitoring, metering and control system The control provides an oDerator r;ter!ace

a the genset.

digital voltage regulation.

digital governing and generator set protective furctions and automatic oaralteling functions Operation of tho engine or generator outside the programrred parameter values generates either a warning signal that is displayed on the control pane: screen or alttoma!icaliy in!tiates a controlled shutdown of the engine Attached rs a series of Parameter LIS! Reports inat are stored with,n the PowerCommand 3200 that are accessible by i.se* or Cummim via a software oterface The attached reports include the following Engine Specific Data (Page 3) Generator Specific Data (Page 4) Load Profile by Percent Range with Time Operated in each load range (Page 5) Duty Cycle Report with Time Spent in each Cycle (Page 6) F9el Consumption Data (Page 7) Power and Energy Report (Page 8) Engine Protection Adjustment (Pages 9 and IO) AmpSentry Settings (Page

11) Tnese are the parameters that the PowerCommand 3200 uses to monitor and assess engine and generator performance during operation During the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> continuous run at rated continuous load (PMTP Item 45), the twenty monitored starts I 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> run at rated continuous load (PMTP Item 49) and the 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> continuous run at approximately prime rating (2335kW - 2435kW) 1PMTP Item 49) these were the parameters being monitored by the PowerCommand 3200 If any of the parameter programmed thresholds are approached a warning ts initiated on the PowerComrnand 3200 display and if any threshold is reached, an automatically controlled shutdown of the eqgine occurs Since no alarms or shutdowns occurred during operation, it is concluded that the engine / generator operated successfully within its desLgn parameters Any shutdown during the continuous or reliability runs would be recorded as a failed test with the associated CR initiated to document the failed test No CR's associated with the continuous runs or the reliabrirty runs were initiated Irem 7 aaove is :he report of the engine protection settings clirrently programmed into and monirored by the PowerCommand 3200. The parameters are as follows:

LOP - Lube Oil Pressure HGT -- High Oil Temperature LCL .- Low Coolant level LCP - Low Coolant Pressure LCT - Low Coolant Temperature HCT -- High Coolant Temperature I-1FT -- High Fljel Temperature HGT .- H !gli Aftercooler Temperature HIT ~ HiCjh Inlet Temperature he parameters are provic'ed with "warfling

!hreshold" and "shutdown threshold" as previously CiisCL;SSed Some thresholds are based on rated engine RPM which for this engine is 1800 RPM :iased on :ne Engipe Specific Data Report (Item

! above). HBF - High Blowby Flow

e.%) 8 ,5 ihe yefierator protection settings programmed into the PowerCommand 3200 and cor'roiiea 9y !'le Ampsentry module which is integral to the PowerCommand 3200 ._ Page of _Lf CR-lP2-2008-02917 CAl Operability Input SBO I Appendix R DG Testing %e
  • c !mc s;?ecified IC Items 3 avd 4 IS based on ?he skandbv ra!ing whrch IS 2700kW June 05,2008 Parameter List Report I Capture F'iYeslPCC 3200 [EXTERCY QSK 78 rm3 12Mar2008.cup~r~~ni~orl.i boultEngine Valut 'I'aits 2790 kWm@ 1800 RPM c Pinractcr hame Engine Model Nurnber QSK78 46 Engine Rahng Engine CPL Number 8241 Engrne Send Number 66300555 Engine How offset 0 00000 hours Engiw Rulgung Time (ERT) 71 25201 hoUlS Page 1 of 1 June 05.2008 Parameter List Report Capture Files\PCC 3200 [ENTERGY QSK78 tev3 12Mar2008.eap~~onirortAbuu~Gens~t Barataetcttr SAme Valw Units Connection Type Wye Number of Phases Three Phase Kominal Frequency 60 .Ooo wz Raring Tw censet Modcl Number 2700 DQLA Genset Wd Number Genset Specification Xumh 0 Alternator Model Number 0 Alternator send l.&.lmk 0 Genset Build Date 01/31/2005 .WDYYYY Power Factor Rating (3-phase) 0.80 Controller On Time (COT) 413 1531 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.825455e-4 months <br /> Application kVh Rating 3375 kVA Standby BO5 K54 1470 Total kwh Delivered 127462 kWh Page 1 of 1 June OS, 2008 Parameter List Report I Capture FilcsslPCC 3200 [ENTERGY QSK'78 rev3 12Mar2008.~apl\;Noniior\H~iory160Hz Standby k W Histogran Pimm&r Name V8tW 1 Rib, 6oHz Standby kW Load Profile - .rDataTable>, 22,2 kW Load Range, Time spent in kW Range 0-5% hd, 2.667 6-1O% Lmd, O.OO0 11-15%toad,0.000 16-20% had, O.OO0 21-25% L~ad.0.017 26-30% Load, 0.067 3 1 -35% Load, 0.383 36.40% Load, 0.OOO 4145% Load, 0.000 46-50% had, 0.017 5 I-55% Load, 0.067 5640% Load, 0,050 66-70% Load.0.117 61 -65% LO&, O.OO0 7 1-75% Load, 41.583 '7640% Load. 10.567 8 i -85% Load, 0.OW 8640% Load, 0.OOO 9 1 -95 % Load, 0.ooO 100% Load, O.Oo0 %-loo% Load, 0 000 Page I of I Duty Cycle Report harure FiksIPCC 3200 (ENTERG Y QSK 78 rev3 I2Mar2008.cap~'Moni~ortHisiory\60 Hz Duty Cycle Histogram uiad begc Tme Spent in Range 91-10OY0 Load 57.42 1 1-20% Load 7 1-80% Load S 1-60% Laad 2 I-30% Load o-toa/o Load 3 1-40% Load 4 1-50"/0 Load 6 1-70% bad 8 1-W% Load 4.62 2.87 L .72 1.18 0.02 0.67 0.62 0.08 0.12 Page 1 of 1 I June 05. ZOOS Parameter List Report Fuel Consumption Since Resrt Fuel Consumption Reset Time COT Fuel Consumption Reset Time ERT Conmller on rime (COT) Engine Running Time (ERT} 9025.47 0 .ooo 0.00000 413.1531 7 I ,25201 Page 1 of 1 Jux 05,2008 Parameter List Report Capture Files\PCC 3200 [ENTERGY QSK?8 rev3 121Wur2008.cup~~onitorl~~~oryIPowcr and Enere I PammcCer Name VIIBC I:a& ! Total kWb Delivered 127462 kWh kVLh Since Rw 127462 kWh kWh Reset Time (ERT) 000000 houm kW1 Reset Time (COT) OoooO hours Co$mlte~ On Time (COT) 413 ~531 hours Engine Running Time (ERT) 71 25201 burs Page 1 of 1 Para ni et e r List Report degF degF monds scconds dcgF c!cgF tkgF Parameter List Report PowerCommand 3200 Ampsentry Settirlgs Device I Time Delay Function Settings Settings Notes :3? i? Snut Dowr! .e 3 OHz 10 seconds Over Frequency 31 u S17ut Dow - 3 OH2 10 seconds Under Frequency 59 "I 10% 10 seconds Over Voltage 27 10 seconds Ampsentry Default C)ver!oad ,k'<'i) 105Cb (of 2700~W) 60 seconds Ampsentry Default 32 1 0% 3 seconds Am?Sentrj Default Under Voltage Reverse Power (kW) S) pchronize Fail lr'!amtng 60 seconds Reierse KVAR 20% 10 seconds Ampsentry Default Page 1 of 1 I I EntcVgy CORRECTIVE ACTION CR-IP2-2008-029 17 CA Number: 2 Name - Dewey Jr,Donald J .-I nderso 11 Xr ic Group *I Assigned By: Operilions Watch Staff Asyigned To: Design Eng Elec Staff-Subassigned To : Originated By: Kcller,Getrrge W Performed By: Xnder\ctn,Eric Subperformed By: .&ppro.red By: Closed By: Dewe) Jr.Donaid J 6/6/2008 16 20 os Current Due Date: 06/07/2008 Initial Due Date: 06/07/2(X)8 CA Type: OPERL\BIL.ITY INPUT Plant Constraint:
  1. NONE CA

Description:

Please provide operability input reguarding Appendix R diesels ability to perform 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> loaded run Response:

Subresponse

See dttached Operability Input EJA 6/6/08. Closure Comments:

Concur with engineering response.

Close CA. Attachments:

Resp Description CR-IP2-2008-29 17 CA2 Oper Input Attachment Header Document Name: pntitled - Document Location Resp Descripvon Attach Title: jCR-IP2-2008-2917 CA2 0pi.r Input CR-IP2-2008-02917 CA2 Operability fnput SBO I Appendix R DG Testing The additional demonstration of operability of the SBO / Appendix R DG can be determined by review of the engine 1 generator parameters programmed into and controlled by the PoviverCommand 3200 Digital Paralleling Control. The PowerCommand 3200 is a :i:icroprocessoi based generator set monitoring, metering and control system. The control prov!des an operator interface to the genset. digital voltage regulation, digttal governing and generator set protective functions and automatic paralleling functions. Operation of the engine or generator outside the programmed parameter values generates either a warning signal that is displayed on the control panel screen or automatically initiates a controlted shutdown of the erigine. Attached is a series of Parameter List Reports that list the parameter data that is stored in the PowerCommand 3200 This data is accessible by the tiser or Cummins via a software icten'ace.

The attached reports include the fdlowing:

1 2 3 4 5 6 7 8 AmpSentry Settings (Page 11) En(;rne Specific Data (Page

3) Generator Speciflc Data (Page 4) Load Profile by Percent Range with Time Operated in each load range (Page 5) Duty Cycle Report with Time Spent in each Cycle (Page 6) Fuel Consumption Data (Page
7) Power and Energy Report (Page
8) Engine Protection Adjustment (Pages 9 and IO) These are the parameters that the PowerCornmand 3200 uses to monitor and assess engine anc generator performance during operation.

During the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> continuous run at rated continuous load (PMTP Item 45), the twenty monitored starts with 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> run at rated continuous load (PMTP Item

49) and the 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> continuous run at appfoximately prime rating (2335kW - 2435kW) (PMTP Item 49) these were the parameters being monitored by the PowerComrnand 3200. If any of the programmed parameter thresholds are approached a warning is initiated on the PowerCommand 3200 display and if any threshold is reached, a controlled shutdown of the engine occurs automatically. Since no alarms or shutdowns occurred during operation, it is concluded that the engine

/ generator operaied successfully within its design parameters.

All runs were controlled and monitored by IP2 licensed operators and witnessed by members from the Design Engineering and Systems Engineering Departments and Cummins Metropower personnel.

Ali Entergy staff is trained to ObS*!We negative trends and take required actions including entering Condition Reports in the Corrective Action Database. Any shutdown during the continuous or reliability runs would be'recorded as a failed test with the associated CR initiated to document the failed test. No CR's associated with the continuous runs or the reliability runs were initiated.

Appendix R fire event. A 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> run was not part of the overall acceptance testing required by the Post Modification Test Plan (PMTP) for EC5000033794. The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> continuous run, the 20 one holir runs and the 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> prime rating run, cumulatively represents 46 hours5.324074e-4 days <br />0.0128 hours <br />7.60582e-5 weeks <br />1.7503e-5 months <br /> of operation of the SBO Appendix R Diesel Generator.

As stated above, throughout the duration of these runs the engine and generator performed without incident, with no parameter threshold warnings received arid no shutdowns recorded.

This is based on successful operation of the engine and generator within the warning and shutdown threshold data as documented in the attached reports. Based on the successful operation of the SBO i Appendix R Diesel Generator for the duration of these tests within the monitored engine and generator parameters, and particularly Cui-ing the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> continuous run at rated continuous load, it is reasonable to conclude that the unit would be Capable of operating continuously at rated continuous load for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. and monitored by the PowerCommand 3200. The parameters are as follows: The SI30 / Appendix R Diesel Generator is required to operate for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> during an Item 7 above IS the report of the engine protection settings currently programmed into LOP . Lube Oil Pressure ti07 - High Oil Temperature 6/6/2008 CR-IP2-2008-02917 CA2 Operability Input SBO I Appendix R DG Testing LSL -- LOW Cooiant !eve1 LCP - Low Coolant Pressure LCT - Low Cmiant Temperature HCT -- High Coolant Temperattire HFT - !+IC$ Fuel Temperature HAT - t-itgh Aftercooler Temperature HIT - High tnlet Temperature HBF - Htgh i3l~~by FIOW The Darameters are prowded with "warning threshold" and "shutdown threshold" as previously disciissed Some thresholds are based on rated engine RPM which for this engine is 1800 RPM based on the Engtne Specific Data Report (item 1 above) Item 8 IS the generator protection settings programmed into the PowerCommand 3200 and controlled by the Ampsentry module which is integral to the PowerCommand 3200. Ti7e Yo load specified in lrems 3 and 4 IS based on the standby rating which IS 2700kW. Piepared By Eric J Anderson Joseph Raff Date 6/6/08 Pager ? of4 6/6/2008 lune 05,2008 Parameter List Report Capture FilesWCC 3200 [ENTERGY QSK78 rev3 Z2MarZU08.ca~~~unitort4 boutlEngine Parameter Name \'aloe tinits Engine Model Number Engine Rmng Engrne CPL Number 8241 Engiae Rumng Time (ERT) 71 25201 hours QSK 78 44 2790 kWm @ l8Ou RPM 663005 5 5 Engine Serial Number Engine Hour Offset 0 .m hours Parameter List Report i. I _c Caplure Fifes\PCC 3200 {ENTERGY QSK78 rev3 12Mur2008.cap~~Monifurl4buuttGensaf Valur t-aits I__ Pnramrtcr Name Connection Trpe WYe Kurnbcr of Phases Three Phase Nominal Ffeqocncy 60 .om Hz Rang Tvpe Standby Genset Model ?%lmbQ. 2700 DQLA Gewet Send Number c;enset Specification Number 0 Alternator Model Number 0 Mtefnator serial Number 0 Genset BuiId Date 01!3112005 MMDDYYYY Power Factor Rating (3-pk) 0.80 Controller On Time (COT) Total kwh Delivered 127462 Application kVA Rating 3375 BO5 K54 1470 413 .I531 hQurj kWh kVA Page i of 1 June 05,2008 Parameter List Report Capture Files\PCC 3200 [EiVTERGY QSK78 rev3 I2Mar2008,copJl~~nitorlNist~ry\60Hz Siandby k W Histogran Parameter hnme Vstuc Gaits 60k Standby kW Load Profile <DataTable>, 22,2 kW Load Range, Time spew in kW Range 0-5% Load, 2 667 6-ION Load, 0 oocl tl-15%Load,O.000 16-20?6 Load, 0 000 21 -25% Load, 0 017 26-30% Load, 0.067 3 I -3S% Load, 0.383 36-40% Load, 0.000 41 -45% Load, 0 OOO 5 1 -S5% Load, 0.067 S6-60% Load, 0.050 61 -65% Load, O.Oo0 66-70% had, 0.1 17 7640% Load, 10 567 46-50% had. 0 017 71 -75% Load, 41.583 81 -85% Load, 0 OOO 86-90% had, 0 000 91 45% Load, 3.OOO 96-1000,0 Load. 0 OOO > 100% had, 0 0o0 June 05,2008 Duty Cycle Report I_ i ! -apture FifeslPCC 3200 IEXTERGY QSK78 rev3 12Mar2008.cap/t~~niror\Hisrorq.160 Ht Duty Cycle Mistc, ?ram 9 1- 1000/* 57.42 1 1-20?4 Load 4.62 7 I -SO% Load 2 87 5 14,0% L>ad 1.72 2 1-30% Load 1.18 0- 10% bad 0.02 3 i-4030 Load 0.67 4 1 -5Oo/n Load 0.62 6 1 -7OOiO Load 0.08 8 I -90% Load 0.12 . I~~Oge Time Spent in Rmgc _I_ I'agc 1 of I June 05.2008 Parameter List Report Capture FiiedPCC 3200 fENTERG Y QSK78 rev3 12~'ar200$.ca~~onitor~lilistur~!FueI Parameter Namt VaIur Unrb Cumulative Fuel Consumptlon 9025 '47 gal Fuel Consumption Since Reset 902s .4i gal Fuel Consumption Reset Time COT 00 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Controiier On Time (COT) 413.1531 h0WS Engine Running Time (EKT) 71 25201 hours Fuel Consumption Reset Time ERT OaK##) hours June 05,2008 Parameter List Report Page 1 of 1 Parameter List Report JC&F dcgF heconds seconds tic# dcgF dcgF Parameter List Report Pass 2 of 3 PowerCommand 3200 Ampsentry Settings Device I Time Delay Function Settings Settings Notes e10 Shtit Down + 3 OHz 10 seconds Over Frequency 8: U Shut DOWF - 3 OH2 10 seconds Under Frequency 59 7?O?4- 70 seconds Over Voltage 27 8 536 10 seconds AmpSentry Defauit Overioatl ikWj :05% (of 2700kW) 60 seconds Ampsentry Default 32 ? 0% 3 seconds Ampsentry Default Under Voitage Reverse Power jhW) Syxhronize Fail ':t'arning 60 seconds i Reverse ~VAR 20010 10 seconds Ampsentry Default Page 1 of I