MONTHYEARML1108300372011-03-21021 March 2011 American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection Program, Third Ten-Year Inspection Interval, Request for Relief 3-ISI-26 Project stage: Request ML11159A0532011-06-10010 June 2011 Request for Additional Information Regarding Relief from Weld Examination Coverage Requirements, Request for Relief 3-ISI-26 Project stage: RAI ML12018A0862012-03-14014 March 2012 Safety Evaluation for Relief Request 3-ISI-26, for Third 10-Year Inservice Inspection Interval Project stage: Approval 2011-06-10
[Table View] |
|
---|
Category:Letter
MONTHYEARML24289A1232024-10-24024 October 2024 Letter to James Barstow Re Environmental Scoping Summary Report for Browns Ferry CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-077, Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 12024-10-0909 October 2024 Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1 ML24270A2162024-09-27027 September 2024 Notice of Intentions Regarding Preliminary Finding from NRC Inspection Report 05000260/2024090, EA-24-075 ML24262A1502024-09-24024 September 2024 Requalification Program Inspection - Browns Ferry Nuclear Plant CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24263A2952024-09-19019 September 2024 Site Emergency Plan Implementing Procedure Revision CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 CNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024 Cycle 16 Reload Analysis Report ML24255A8862024-09-10010 September 2024 Core Operating Limits Report for Cycle 16 Operation, Revision 0 ML24239A3332024-09-0303 September 2024 Full Audit Plan IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 ML24225A1682024-08-16016 August 2024 – Notification of Inspection and Request ML24219A0272024-08-0606 August 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24183A4142024-07-10010 July 2024 – License Renewal Regulatory Limited Scope Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-SLE-0000) (Docket Numbers: 50-259, 50-260, and 50-296) 05000296/LER-2024-003, Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints2024-07-0808 July 2024 Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints 05000259/LER-2024-001-01, Inoperability of Unit 3 Diesel Generator Due to Relay Failure2024-07-0303 July 2024 Inoperability of Unit 3 Diesel Generator Due to Relay Failure ML24184A1142024-07-0202 July 2024 Site Emergency Plan Implementing Procedure Revision ML24183A3842024-07-0101 July 2024 Registration of Use of Cask to Store Spent Fuel (MPC-364, -365) ML24179A0282024-06-26026 June 2024 Evaluation of Effects of Out-of-Limits Condition as Described in IWB-3720(a) 05000259/LER-2024-002, Reactor Scram Due to Generator Step-Up Transformer Failure2024-06-24024 June 2024 Reactor Scram Due to Generator Step-Up Transformer Failure ML24175A0042024-06-23023 June 2024 Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 High Pressure Coolant Injection System ML24176A1132024-06-23023 June 2024 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner’S Activity Report Cycle 21 Oper ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24155A0042024-06-18018 June 2024 Proposed Alternative to the Requirements of the ASME Code (Revised Alternative Request 0-ISI-47) ML24158A5312024-06-0606 June 2024 Registration of Use of Cask to Store Spent Fuel (MPC-361, -362, -363) ML24071A0292024-06-0505 June 2024 Subsequent License Renewal Application Enclosure 3 - Proprietary Determination Letter ML24068A2612024-06-0505 June 2024 SLRA Fluence Methodology Report - Proprietary Determination Letter IR 05000259/20244032024-05-22022 May 2024 – Security Baseline Report 05000259/2024403 and 05000260/2024403 and 05000296/2024403 05000260/LER-2024-002, High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation2024-05-20020 May 2024 High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A0702024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000259/20240012024-05-14014 May 2024 Integrated Inspection Report 05000259/2024001, 05000260/2024001, and 05000296/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24123A2012024-05-0202 May 2024 NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000259/2024404, 05000260-2024404, 05000296/2024404) and Request for Information ML24122A6852024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual CNL-24-036, – 10 CFR 50.46 Annual Report2024-04-25025 April 2024 – 10 CFR 50.46 Annual Report ML24116A2522024-04-25025 April 2024 Site Emergency Plan Implementing Procedure Revision 05000296/LER-2024-002, Breaker Trip Automatically Started an Emergency Diesel Generator2024-04-24024 April 2024 Breaker Trip Automatically Started an Emergency Diesel Generator 05000296/LER-2024-001, Primary Containment Isolation Valve Inoperable Due to Incorrect Motor Operated Valve Setup2024-04-22022 April 2024 Primary Containment Isolation Valve Inoperable Due to Incorrect Motor Operated Valve Setup CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A2302024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 2024-09-03
[Table view] Category:Safety Evaluation
MONTHYEARML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 ML23219A1542023-08-17017 August 2023 Request to Use Later Edition of ASME Code for Operation and Maintenance and Alternative Requests BFN-IST-01 Through 05 for the Fifth 10-Year Interval Inservice Testing Program ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23116A2472023-05-23023 May 2023 Issuance of Amendment Nos. 330, 353, and 313 Regarding Adoption of TSTF-478, Revision 2 for Combustible Gas Control ML23101A1102023-05-16016 May 2023 Issuance of Amendment Nos. 329, 352, and 312 Regarding Removal of Site Acreage Description from Technical Specifications ML23073A2902023-05-0202 May 2023 Issuance of Amendment Nos. 328, 351, and 311 Adoption of TSTF-505, Revision 2, for Risk-Informed Completion Times and TSTF-439, Revision 2, to Eliminate Second Completion Times ML23054A2902023-03-13013 March 2023 Request for Relief from the Requirements of the ASME Boiler and Pressure Vessel Code Regarding Weld Examination Coverage ML23048A3042023-03-0808 March 2023 Tennessee Valley Authority - Request for Relief from Requirements of ASME Boiler and Pressure Vessel Code Regarding Weld Examination Coverage (EPID L-2022-LLR-0045,-0046,-0047) ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22348A0662023-01-13013 January 2023 Issuance of Amendment Nos. 325, 348, & 308 Regarding Application of Advanced Framatome Methodologies, & Adoption of TSTF Traveler TSTF-564-A, Rev. 2, in Support of Atrium 11 Fuel Use (EPID L-2021-LLA-0132) - Nonproprietary ML22271A9142022-12-0707 December 2022 Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level Scheme ML22273A1032022-11-22022 November 2022 Issuance of Amendment Nos. 323, 346, and 306 Regarding Chilled Water Cross-Tie Modification ML22220A2602022-11-21021 November 2022 Issuance of Amendment Nos. 322, 345, and 305 Regarding Adoption of TSTF Traveler TSTF-205-A, Rev. 3, and TSTF-563-A ML22298A2852022-11-14014 November 2022 Request for Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Paragraph IWB-2420(B) and Use of Code Case N-526 ML22138A3252022-06-24024 June 2022 Issuance of Amendment Nos. 321, 344, and 304 Regarding Spent Fuel Pool Criticality Safety Analysis ML22084A0012022-04-0505 April 2022 Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Units 1 and 2, Review of Quality Assurance Plan Changes ML22020A2282022-03-16016 March 2022 Issuance of Amendment Nos. 320, 343, and 303 Regarding the Adoption of Approved Technical Specification Task Force Traveler TSTF-568, Revision 2 ML22010A1952022-01-12012 January 2022 Request to Use Later Edition of the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants ML21285A0682021-10-28028 October 2021 Issuance of Amendment Nos. 319, 342, and 302 Regarding the Adoption of Technical Specification Task Force Traveler TSTF-582, Revision 2 ML21214A1392021-08-30030 August 2021 Issuance of Amendment Nos. 318, 341, and 301 Regarding Changes to Technical Specification 3.8.6, Battery Cell Parameters ML21173A1772021-07-27027 July 2021 Issuance of Amendment Nos. 317, 340, and 300 Regarding Adoption of Title 10 of the Code of Federal Register Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components ML21075A0762021-04-30030 April 2021 Issuance of Amendment Nos. 316, 339, and 299 Regarding the Incorporation of the Tornado Missile Risk Evaluator Into the Licensing Basis ML21041A4892021-04-0808 April 2021 Issuance of Amendment Nos. 315, 338, and 298 Regarding the Adoption of Technical Specifications Task Force Traveler, TSTF-425, Revision 3 ML20268A0822021-01-12012 January 2021 Issuance of Amendment Nos. 314, 337, and 297; 351 and 345; 140 and 46 Regarding Changes to the Technical Specifications ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML20253A1812020-09-23023 September 2020 Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Code ML20085G8962020-06-26026 June 2020 Issuance of Amendment Nos. 312, 335, and 295 Regarding Request to Revise Emergency Plan Staff Augmentation Times ML19329E3192020-01-0202 January 2020 SE Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC Nos. MF4540, MF4541 and MF4542; EPID No. L-2014-JLD-0044) ML19294A0112019-12-26026 December 2019 Issuance of Amendment Nos. 311, 334, and 294 Adopt Technical Specifications Task Force Traveler, TSTF-542, Revision 2 ML18277A1102019-08-27027 August 2019 Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection ML19198A0012019-08-13013 August 2019 Issuance of Amendment Nos. 308, 331, and 291 to Extend Implementation Due Date for Modifications 102 and 106 Related to NFPA 805 (Eid L-2019-LLA-0140) ML19037A1372019-04-0202 April 2019 Revisions to Modifications 85, 102 and 106 Related to National Fire Protection Association 805 Performance-based Standard for Fire Protection of Light Water Reactor Electric Generating Plants ML19010A2742019-03-18018 March 2019 Final Safety Evaluation by the Office of Nuclear Reactor Regulation Topical Report- TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation, Calculation, CDQ0000002016000041 Tennessee Valley Authority ML19016A2152019-02-28028 February 2019 Relief from the Requirements of American Association of Mechanical Engineers Code Section XI Inservice Inspection Program, Request for an Alternative ISI-46 ML18323A1722018-12-31031 December 2018 Relief Request No. 1 ISI 29 Regarding Second 10-Year Inservice Inspection Interval Regarding Examination Coverage for Certain Pressure Retaining Welds ML18323A0262018-12-0404 December 2018 Relief Request No. 1-ISI-28 Regarding Third 10-Year Inservice Inspection Interval Regarding Examination Coverage for Certain Pressure Retaining Reactor Vessel Welds ML18241A3192018-10-0909 October 2018 Issuance of Amendment Nos. 306, 329, and 289 to Revise Approved NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants-Revision ML18251A0032018-09-27027 September 2018 Issuance of Amendment Nos. 305, 328, and 288 to Revise Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program (CAC Nos. MG0113, MG0114, and MG0115; EPID L-2017-LLA-0292) ML18236A3312018-09-24024 September 2018 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML18197A3072018-08-30030 August 2018 Issuance of Amendments Regarding Request to Change Technical Specification 3.3.1 and Surveillance Requirement 3.2.4 ML18171A3372018-07-10010 July 2018 Issuance of Amendment to Revise License Condition 2.C(18)(a)3 ML18138A4522018-05-29029 May 2018 Bf, Units 1, 2, and 3; Sequoyah, Units 1 and 2; Watts Bar, Units 1 and 2 - Correction to an Omitted Reference for License Amendment Regarding Request to Upgrade (CAC Nos. MF9054, MF9055, MF9056, MF9057, MF9058, MF9059, and MF9060, EPID L-20 ML17289A0322017-12-22022 December 2017 Issuance of Amendments Regarding Request to Upgrade Emergency Action Level Scheme (CAC Nos. MF9054-60; EPID L2017-LLA-0160) ML17261A0362017-10-0606 October 2017 Request for Request 3-ISI-28 Regarding Third 10-Year Inservice Inspection Interval Examination Coverage of Inside Radius and Nozzle-to-Vessel Welds ML17215A2432017-10-0202 October 2017 Browns Ferry Nuclear Plant, Units 1, 2, and 3; Watts Bar Nuclear Plant, Units 1 and 2 - Issuance of Amendments to Change Technical Specifications to Adopt Technical Specifications Task Force Traveler-522 (CAC No. MF9562-MF9566) ML17032A1202017-08-14014 August 2017 Non-Proprietary Issuance of Amendments Regarding Extended Power Uprate ML17145A5522017-08-11011 August 2017 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Alternative Request IST-RR-1 for the Fourth 10-Year Inservice Testing Interval (CAC Nos. MF9087, MF9088, and MF9089) ML17034A3602017-03-27027 March 2017 Issuance of Amendment Nos. 298, 322, 282, and 338 and 331 - Revise Technical Specification 5.3, Unit Staff Qualifications to Replace References to Rg 1.8, Rev. 2 with TVA Nuclear Quality ... 2024-01-03
[Table view] |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 March 14,2012 Mr. Joseph W. Shea Corporate Manager -Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 SUB..BROWNS FERRY NUCLEAR PLANT, UNIT 3 -SAFETY EVALUATION FOR RELIEF REQUEST 3-ISI-26, FOR THE THIRD 10-YEAR INSERVICE INSPECTION INTERVAL (TAC NO. ME5914)
Dear Mr. Shea:
Bya letter dated March 21, 2011, as supplemented by a letter dated July 14, 2011 (Agencywide Documents Access and Management System Accession Nos. ML110830037 and ML11159A053 respectively), the Tennessee Valley Authority (TVA, the licensee) submitted Relief Request 3-ISI-26.
This submittal requested relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code),Section XI, Table IWB-2500-1, Examination Category B-D, Item No. B3.90 based on it being impractical to perform the required examinations.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR), Section 50.55a(g)(5)(iii), the request proposes the use of an alternative.
More specifically, TVA has proposed an alternative to achieve less than the ASME Code required examination coverage for the N6A-NV nozzle-to-vessel weld. Based on our review of your submittals, the U.S. Nuclear Regulatory Commission (NRC) has concluded that the method of record is impractical; however, the NRC staff finds that the alternative proposed provides reasonable assurance of structural integrity.
Therefore, the NRC finds that granting relief pursuant to 10 CFR 50.55a(g)(6)(i) is authorized by law and will not endanger life or property or the common defense and security, and is otherwise in the public interest giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility.
This relief is granted and the alternate proposed by TVA is authorized for the remainder of the third 10-year inservice inspection interval at Browns Ferry Nuclear Plant, Unit 3, which began November 19, 2005, and ends November 18, 2015.
J. Shea If you have any questions regarding this matter, please contact Ms. Eva Brown at (301) 415-2315.
Sincerely, Douglas A. Broaddus, Chief Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-296
Enclosure:
Safety Evaluation cc w/enclosure:
Distribution via Listserv
ReG!!,_ 0.,.:r J.. ... ('I << 0 .... !il: <J> l' UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 ",') 'f/!.O ****i< SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION THIRD 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN REQUEST TO EXAMINE WELD TO THE MAXIMUM EXTENT PRACTICAL TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT, UNIT 3 DOCKET NO. 50-296
1.0 INTRODUCTION
By a letter dated March 21, 2011, as supplemented by a letter dated July 14, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML110830037 and ML11159A053 respectively), the Tennessee Valley Authority (TVA, the licensee) submitted Relief Request (RR) 3-ISI-26 pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 50.55a(g)(5)(iii), for the Browns Ferry Nuclear Plant, Unit 3 (BFN-3). This submittal requested relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code),Section XI, Table IWB-2500-1, Examination Category B-D, Item No. B3.90. More specifically, the licensee has requested to achieve less than the ASME Code required examination coverage for the N6A-NV nozzle-to-vessel weld on Unit 3. The Code of Record for the third inservice inspection (lSI) interval at Unit 3 is the 2001 Edition through 2003 Addenda of the ASME Code.
2.0 REGULATORY EVALUATION
Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (including supports) must meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code,Section XI to the extent practical within the limitations of design, geometry, and materials of construction of the components.
The regulations require that lSI of components and system pressure tests conducted during the 10-year intervals be in compliance with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b), 12 months prior to the start of the 120-month interval.
The ASME Code of record for Unit 3 is the 2001 Edition through 2003 Addenda of the ASME Code,Section XI. Enclosure
-Pertinently, the ASME Code Case N-460, Alternative Examination Coverage for Class 1 and Class 2 Welds,Section XI, Division 1, which has been approved unconditionally in Regulatory Guide (RG) 1.147, Revision 15, "Inservice Inspection Code Case Acceptability, ASME Code Section XI, Division 1," allows that "a reduction in examination coverage for any Class 1 or Class 2 weld may be acceptable provided that the reduction in coverage for that weld is less than 10 [percent]
.. " Additionally ASME Code Case N-648-1, "Alternative Requirements for Inner Radius Examination of Class 1 Reactor Vessel Nozzles,Section XI Division 1," conditionally accepted by the U.S. Nuclear Regulatory Commission (NRC), permits the ASME Code users to perform a VT-1 [visual] examination in lieu of a volumetric examination for specific locations on welds such as the subject weld. Section 50.55a(g)(6)(i) to 10 CFR states that: ... The Commission will evaluate determinations
[submitted by the licensee]
under paragraphs (g)(5) of this section [10 CFR 50.55a] that code requirements are impractical.
The Commission may grant relief and may impose such alternative requirements as it determines are authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility.
The NRC staff notes that September 24, 2008, BFN-3 precedent (ADAMS Accession No. ML082480573) cited by the licensee was applicable and applied in completing this review. 3.0 LICENSEE EVALUATION ASME Code Requirement The ASME Code,Section XI, Table IWB-2500-1, Item No. C3.90 component examinations require a volumetric examination of the nozzle-to-vessel welds. The extent of the examination is "all nozzles," specifically the volume illustrated in Figure IWB-2500-7(a), and essentially 100 percent of the weld and adjacent base material.
ASME Code Case N-460 effectively states that 90 percent coverage is adequate to meet the ASME Code requirement.
ASME Code Case N-460 has been approved for use by the NRC in RG 1.147, Revision 15. System/Component for Which Relief is Requested Relief is requested for the examination of the N6A-NV nozzle-to-vessel weld, a C3.90 component.
ASME Code Requirement for Which Relief is Requested Relief is requested from meeting the required 100-percent inspection coverage of the ASME Section XI Code, Table IWB-2500-1, Examination Category B-D, Item No. B3.90 requirements for this weld.
-Licensee's Proposed Alternative Examination The licensee stated, In lieu of the Code require[d]
essentially 100 percent volume UT [ultrasonic testing1 examination, on the nozzle-to-vessel weld, TVA proposes a UT examination of accessible areas to the maximum extent practical given the component design configuration of the RPV nozzle-to-vessel weld. The licensee further stated that the examination as performed achieved a 5S.9-percent coverage.
Licensee's Basis for Requesting Relief The submittal identified that the design configuration of the subject weld precludes 100-percent examination due to inherent limitations of the barrel-type nozzle-to-vessel weld design. Achieving 100-percent coverage would require a substantial redesign of the nozzle itself. The licensee indicated that scanning from the nozzle surface is ineffective due to the weld location and asymmetrical inside surface of the nozzle-to-vessel convergence.
It was noted that the licensee considered automated UT, but cited past experience to conclude that such an examination would not Significantly improve the coverage.
The licensee continued with a discussion on the fact that the coverage achieved included the most challenged areas of the weld, the quality of their inspection program, and the impracticality of radiographic examination.
4.0 TECHNICAL EVALUATION The ASME Code requirement for the subject weld requires an examination of "100 [percent]
welds in all components," while the licensee achieved an approximate UT coverage of 5S.9 percent of the examination area. This is not unusual for subject welds of the nozzle-to-shell variety in older plant designs such as Unit 3. The licensee documented the examination in several detailed diagrams, provided in the submittal, making clear the impediment to reaching the required surface examination coverage.
Geometrically the curvature of the head and the size of the fillet on the weld make achieving the required coverage impractical.
The NRC staff accepts that redesigning the nozzle is impractical.
Alternatives such as automated UT or radiography are equally impractical, as they would not provide significantly enhanced surety of the integrity of the subject weld. While it may be possible to marginally increase coverage with further careful examination, the fact that the inner portion of the weld was successfully examined provides a sufficient measure of surety regarding the structural integrity of the weld, as the inner portions are the most challenged portions of the weld. The NRC staff notes that RRs were approved for similar weld examinations at Unit 3 in 200S. Further assurance of weld integrity is provided in the form of a VT-1 visual examination performed on the inner radius of the nozzle in 200S, as noted in the July 14, 2011, letter. The visual examination was performed consistent with ASME Code Case N-64S-1, which was conditionally approved for use in RG 1.147.
Based on the above, the NRC staff concludes that, if significant service-induced degradation had occurred, there is reasonable assurance that evidence of degradation would have been detected by the ultrasonic and visual examinations performed by the licensee within the examined area. In light of the above, the NRC staff concludes that relief should be granted from further action in examining this weld for the Unit 3 third 10-year lSI interval.
5.0 CONCLUSION
Due to issues at Unit 3, the ASME Code requirements with respect to the subject weld are impractical.
Redesign of the nozzle performing radiographic examination of the weld to achieve of the ASME Code requirements would be a burden to the licensee.
The weld coverage achieved provides reasonable assurance of the structural integrity of the subject weld. Therefore, the licensee's request for relief is granted pursuant to 10 CFR 50.55a(g)(6)(i) for the Unit 3 third 10-year lSI interval.
The NRC has determined that granting relief pursuant to 10 CFR 50.55a(g)(6)(i) is authorized by law and will not endanger life or property, or the common defense and security and is otherwise in the public interest giving due consideration to the burden upon the licensee that could result if the requirements were imposed. All other ASME Code,Section XI requirements for which relief was not specifically requested and approved in the subject request for relief remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
This relief is granted and the alternate proposed by TVA is authorized for the remainder of the third 10-year inservice inspection interval at Browns Ferry Nuclear Plant, Unit 3, which began November 19, 2005, and ends November 18, 2015. Principal Contributor:
D. Widrevitz Date: March 14,2012 J. Shea -2 If you have any questions regarding this matter, please contact Ms. Eva Brown at (301) 415-2315.
Sincerely, IRA! Douglas A. Broaddus, Chief Plant licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-296
Enclosure:
Safety Evaluation cc w/enclosure:
Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrPMBrownsFerry RidsNrrLABClayton RidsRg n2MailCenter LPL2-2 R/F RidsOgcRp RidsNrrDeEvib MKotzalas, EDO RidsNrrDorlLpl2-2
DWidrevitz, NRR RidsAcrsAcnw_MailCTR ADAMS Accession No ML12018A086
- Via e-mail OFFICE LPL2-2/PM LPL2-21LA EVIB/BC LPL2-2/BC NAME EBrown BClayton HGonzalez(A)*
DBroaddus DATE 01/19/12 01/18/12 10/27/11 03/14/12 OFFICIAL RECORD COpy