Official Exhibit - ENT000061-00-BD01 - Flow Accelerated Corrosion Inspection Points for 3R14 Er IP3-05-24045
ML12338A445
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/28/2012
From:
Entergy Nuclear Operations
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 22102, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01
Download: ML12338A445 (20)


Text

FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14ER IP3-05-24045 NU MB ER E XA M P O I NT WO R K ORD E R DE SC R IPTI O N LOCA T I ON SCAFF O L D I NSULATION P AI NT P I PE P R E P DR A WI NG P I PE S I Z E RE M A R K SEXTRACTION1EX-04.2-09TIP3-05-2495433 LP TURBINE TO 33A FEEDWATER HEATERInside 33 condenser.YesTSNoYes5000728" X 20"Checworks pick. Low Checworks hours. Inspection inside condenser.2EX-02.14-07PIP3-05-24843Preseparators to Header 35. Exam consists of Extraction Steam pipe EX-02.14-07P.Turbine Building. Located approximately 17' North and 5' East of B4/18.8, El.26' . YesYesNoYes5000128"Checworks pick. Low Checworks hours. Carbon steel component downstream of non-susceptible material. Entrance effect.3EX-04.13-07TIP3-05-24846Extraction piping from 33 LP turbine to 33B feedwater heater.Turbine Building. Located approximately 10' North and 4' West of BB 1/15. El 24'YesYesNoYes5000820"From Power Uprate Checworks analysis. One of top 5 components showing greatest increase in predicted wear rate due to uprate. Calculation 040711.4EX-04.4-08EIP3-05-24847Extraction piping from 33 LP turbine to 33A feedwater heater.Turbine Building. Located approximately 8' south of A/18.

El 39'NoYesNoYes5000728"OE from Unit 2. High wear found on similar elbow.5EX-04.11-08EIP3-05-24848Extraction piping from 33 LP turbine to 33B feedwater heater.Turbine Building. Located approximately 2' East and 1' North of A/16. El 39'NoYesNoYes5000828"OE from Unit 2. High wear found on similar elbow.6EX-04.21-02PIP3-05-24849Extraction piping from 31 LP turbine to 33C feedwater heater.Turbine Building. Located approximately 10' North and 5' East of BB1/15. El 24'YesYesNoYes5000420"Calculation reinspection. IP3-CALC-EX-03082. RSL 12/2010.

Inspect EX-04.21-02P7EX-03.1A-14EIP3-05-24850Extraction piping from 33 LP turbine to 34A feedwater heater.Turbine Building. Located approximately 2' East of A/18. El 39'NoYesNoYes5000520"Checworks pick. Inspect elbow and upstream and downstream piping, EX-03.1A-13P and EX-03.1A-15P.8FAC-07-EX-01IP3-05-24984Two back to back 90 degree elbows and 6" UPSM and DNSM.immediately upsm of crossunder steam line drip pot drain check valve western most valve above heater drain tankTurbine Building. Located approximately 5' North of Heater Drain Tank. EL 30'YesYesNoYes9321-F-202032"Other areas of this piping experienced leaks in previous cycle.9FAC-07-EX-02IP3-05-24851Inspect pipe downstream of the NW crossunder drip pot to valve MS-125-1. 97-PT-31Piping segments located on the mezz. Platform under HP Turbine. Norhtwest corner approximate El. 31'NoYesNoYes9321-F-2020310",2"Calculation reinspection, 97-PT-31; WO 96-03869-31 Calculation IP3-CALC-MS-02494.

RSL May 201010FAC-07-EST-01IP3-05-24853Piping segments to include DNSM piping of EST-2 and bypass valve 6EX-35 to 12" DNSM of valve 6EX-34-3Turbine Building. Located approximately 1' North and on the centerline of A/20. El 15'NoYesNoYes9321-F-203133/4"Steam trap leaking; IP3-05-00664. Found trap with steam cuts. Steam trap report.EXTRACTION 1 of 15 3R14 FAC Scope (Ipe0067429).Xls ENT000061 Submitted: March 28, 2012 United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of

Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3)

ASLBP #:07-858-03-LR-BD01 Docket #:05000247 l 05000286 Exhibit #:

Identified:

Admitted: Withdrawn:

Rejected: Stricken: Other: ENT000061-00-BD01 10/15/2012 10/15/2012 FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14ER IP3-05-24045 NU MB ER E XA M P O I NT WO R K ORD E R DE SC R IPTI O N LOCA T I ON SCAFF O L D I NSULATION P AI NT P I PE P R E P DR A WI NG P I PE S I Z E RE M A R K S11FW-02.1A-01NIP3-05-2485436A FEEDWATER HTR TO SG HDRTurbine Building. Located approximately 12' South of

CC 3/20. El 44'YesYesNoYes5003918"Checworks pick. Low Checworks hours. Common scaffold for FW-02.1A-01N, -02E, -03P and -04E12FW-02.1A-02EIP3-05-2485636A FEEDWATER HTR TO SG HDRTurbine Building. Located approximately 12' South of CC 3/20. El 44'YesYesNoYes5003918"Checworks pick. Low Checworks hours. Common scaffold for FW-02.1A-01N, -02E, -03P and -04E13FW-02.1A-03PIP3-05-2485736A FEEDWATER HTR TO SG HDRTurbine Building. Located approximately 12' South of

CC 3/20. El 44'YesYesNoYes5003918"Checworks pick. Low Checworks hours. Common scaffold for FW-02.1A-01N, -02E, -03P and -04E14FW-02.1A-04EIP3-05-2485836A FEEDWATER HTR TO SG HDRTurbine Building. Located approximately 12' South of CC 3/20. El 44'YesYesNoYes5003918"Checworks pick. Low Checworks hours. Common scaffold for FW-02.1A-01N, -02E, -03P and -04E15FW-01.3-13PIP3-05-24859Main boiler discharge header to 36 feedwater heaters.Turbine Building. Located approximately 1' West and 1' South of A/20. El 31'YesYesNoYes5003930"Checworks pick. Low Checworks hours. Common scafflod for FW-01.3-13P and -14E.16FW-01.3-14EIP3-05-24860Main boiler discharge header to 36 feedwater heaters.Turbine Building. Located approximately 1' West and 1' South of A/20. El 31'YesYesNoYes5003930"Checworks pick. Low Checworks hours. Common scafflod for FW-01.3-13P and -14E.17FW-02.4-11EIP3-05-24861Feedwater header to Steam Generators.Turbine Building. Located approximately 3' South and 2' East of B8/22. El 30'YesYesNoYes5004030"Checworks pick. Low Checworks hours.18FW-02.8A-26RIP3-04-13353Feedwater to SG 31. Exam consists of Feedwater reducer FW-02.8A-26R DNSM of FCV-417.Aux. Boiler Building. Located approximately 4' North and 14' West of H9/22.1, El. 22NoYesNoYes5004012" X 18" reducerCalculation reinspection IP3-CALC-FW-03815, Rev. 0. 3R12 inspection. Deferred from 3R13.19FW-02.8B-25RIP3-05-24864Feedwater to SG 32. Exam consists of reducer FW-2.8B-25R, UPSM of FCV-427.Aux Boiler Building El. 22'. Located approximately 9' North and 16' West of H9/22.1NoYesNoYes5004012" X 18" reducerCalculation reinspection. Confirm wear rate.20FW-02.8D-24RIP3-05-24866Feedwater to SG 33. Exam consists of reducer FW-02.8D-24R, UPSM of FCV

-437.Aux Boiler Building. Located approximately 2' South and 10' West of H9/23, El 22'.NoYesNoYes5004012" X 18" reducerCalculation reinspection. Also dnsm reducer FW-02.8D-25R. Confirm wear rate.FEEDWATER 2 of 15 3R14 FAC Scope (Ipe0067429).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14ER IP3-05-24045 NU MB ER E XA M P O I NT WO R K ORD E R DE SC R IPTI O N LOCA T I ON SCAFF O L D I NSULATION P AI NT P I PE P R E P DR A WI NG P I PE S I Z E RE M A R K S21FW-02.5-03TIP3-05-24985SG header to 32 Feedwater bypass line, UPSM of FCV 427L.Aux Boiler Building. Located approximately 2' West and 8' North of H2/22.1, El 43'.YesYesNoYes5004030"X6" teeChecworks pick. Low Checworks hours. Indclude downstream pipe FW-02.5-02P.22FW-03.1D-08BIP3-05-24867Feedwater to 33 SGVC. El 104'YesYesNoYes5004518"Checworks pick. Low Checworks hours. Indclude downstream pipe FW-03.1D-09P.23FW-03.1C-13PIP3-04-13354SG Header to SG 34. Exam consists of feedwater pipe FW-03.1C-13P near SG inlet.VC El. 104'YesYesNoYesEC-H-500469321-F-25503 9321-F-2552318" pipeCalculation reinspection IP3-CALC-FW-03807, Rev. 0 3R12 inspection. Deferred from 3R13.24FW-02.8B-13FIP3-05-24868Feedwater to 32 SG. Exam includes piping UPSM and DNSM of flow element per previous exams.

Aux FW Buildin g 36'. Component to be examined includes approximately 5' upstream and 6' downstream of connection containing valve BFD-64-4.YesYesNoYes5004118" pipeCalculation reinspection IP3-CALC-FW-02471 0, 0A. Confirm wear rate that was determined from R09 and R10 inspections.25FW-01.6C-10NIP3-05-24869Feedwater to 36C feedwater heater, inlet nozzle.Turbine Building. Located approximately 12' South and 10' West of A/20. El 36'YesYesNoYes5004218" pipeHigher inlet velocities due to SPU per SPU project manager26FW-01.6A-12NIP3-05-24870Feedwater to 36A feedwater heater, inlet nozzle.Turbine Building. Located approximately 12' South and 4' East of CC 3/20. El 36'YesYesNoYes5003918" pipeHigher inlet velocities due to SPU per SPU project manager 3 of 15 3R14 FAC Scope (Ipe0067429).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14ER IP3-05-24045 NU MB ER E XA M P O I NT WO R K ORD E R DE SC R IPTI O N LOCA T I ON SCAFF O L D I NSULATION P AI NT P I PE P R E P DR A WI NG P I PE S I Z E RE M A R K S27CD-06.3B-02NIP3-05-2487232 Main boiler pump inlet nozzle. Turbine Building. Located approximately 5' West and 5' South of A/17.YesYesNoYes50064Checworks pick. Low Checworks hours. Recommended by snapshot assessment.28CD-05.1B-04PIP3-04-13366Condensate from Feedwater heater 35B to header.Turbine building at FWH 35B. Located approximately 7' South and 15' East of CC3/18, El. 40' and from 15' for access to pipe under 36' floor.YesYesNoYes5006414" pipeCalculation reinspection IP3-CALC-CD-03423, Rev. 0 R11 inspection. Inspect above and below floor penetration. Deferred from 3R13.29CD-03.1C-01NIP3-05-24873Condensate from Feedwater heater 33C to heater 34C.Turbine Building. Located approximately 10' South and 10' West of A/14. El 44'YesYesNoYes5006214"Selection from Checworks Pass 2 analysis. Include downstream elbow CD-03.1C-02E30CD-04.1C-01NIP3-05-24874Condensate from Feedwater heater 34C to heater 35C.Turbine Building. Located approximately 6' South and 15' West of A/16. El 43'YesYesNoYes5006214"Selection from Checworks Pass 2 analysis. 31CD-04.1C-5EIP3-05-24875Condensate from HTR 34C to HTR 35CTurbine Building. Located approximately 3' South and 8' East of BB/16. El 32'YesYesNoYes5006214"Selection from Checworks Pass 2 analysis. Recommended by snapshot assessment. Include downstream pipe CD-04.1C-06P.

Common scaffold for CD-04.1C-5E and -7E.32CD-04.1C-7EIP3-05-24876Condensate from HTR 34C to HTR

35CTurbine Building. Located approximately 3' South and 8' East of BB/16. El 32'YesYesNoYes5006214"Selection from Checworks Pass 2 analysis. Recommendation by snapshot assessment. Common scaffold for CD-04.1C-5E and -

7E.33CD-2.1C-12TIP3-05-24877Condensate from Feedwater heater 32C to headerTurbine Building. Located approximately 15' North and 5' East of D6/14.3. El 48'YesYesNoYes5006124"X14" teeCalculation reinspection IP3-CALC-COND-02446 RSL

12/200934CD-2.8C-03PIP3-05-24882Condensate from header to Feedwater heater 33C. On top of SWAP labTurbine Building. Located approximately 8' East and 8' South of BB/14. El 34'YesYesNoYes5006114"Calculation reinspection IP3-CALC-COND-02446 RSL 10/2009. Exam to include CD-2.8C-02E and CD-2.8C-02P.35CD-2.8B-01PIP3-05-24883Condensate from header to Feedwater heater 33B. On top of SWAP labTurbine Building. Located approximately 3' West and 8' South of BB/14. El 34'YesYesNoYes5006114"Calculation reinspection IP3-CALC-CD-03423 RSL 9/2009. Exam to include CD-2.8B-02E.

Common scaffold for CD-2.8B-01P and -03P.36CD-2.8B-03PIP3-05-24886Condensate from header to Feedwater heater 33B. On top of SWAP labTurbine Building. Located approximately 3' West and 8' South of BB/14. El 34'YesYesNoYes5006114"Calculation reinspection IP3-CALC-CD-03423 RSL 7/2010. Common scaffold for CD-2.8B-

01P and -03P.CONDENSATE 4 of 15 3R14 FAC Scope (Ipe0067429).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14ER IP3-05-24045 NU MB ER E XA M P O I NT WO R K ORD E R DE SC R IPTI O N LOCA T I ON SCAFF O L D I NSULATION P AI NT P I PE P R E P DR A WI NG P I PE S I Z E RE M A R K S37CD-04.1A-04PIP3-05-24887Condensate from Feedwater heater 34A to heater 35A.Turbine Building. Located approximately 4' South of CC 3/16. El 42'NoYesNoYes5006214"Calculation reinspection IP3-CALC-CD-03423 RSL 7/201038FAC-07-CP-01IP3-05-24986Reducer immediately downstream Condensate Polisher Service Vessel B Resin Trap and UPSM of Effluent Valve EB.Condensate Polisher Facility. Component located approximately 10' East and on centerline of column B/6YesNoYesYesIP3V-0561-017014" X 12"OE17378, wear found on discharge piping in CP at South Texas Project, Unit 1. Common scaffold for FAC-07-CP-01 and -

02.39FAC-07-CP-02IP3-05-24987Elbow downstream of Condensate Polisher Service Vessel B Effluent Valve EB and UPSM of Condensate polisher Service Vessel B Outlet Isolation Valve CD-418.Condensate Polisher Facility. Component located approximately 3' North and 10' East of column B/6.YesNoYesYesIP3V-0561-0170 12"OE17378, wear found on discharge piping in CP at South Texas Project, Unit 1. Common scaffold for FAC-07-CP-01 and -

02.5 of 15 3R14 FAC Scope (Ipe0067429).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14ER IP3-05-24045 NU MB ER E XA M P O I NT WO R K ORD E R DE SC R IPTI O N LOCA T I ON SCAFF O L D I NSULATION P AI NT P I PE P R E P DR A WI NG P I PE S I Z E RE M A R K S40HD-3.1B-09EIP3-05-24889Feedwater heater 35B drain to Heater drain tank.Turbine Building. Located approximately 10' East of

CC 3/18. El 17'NoYesYesYes5001810"Checworks pick. This line has no inspections. Inspection will allow entire run to be calibrated, thus greatly reducing future inspections.41HD-2.1B-02RIP3-05-24890Feedwater heater 35B drain to Heater drain tank.Turbine Building. Located approximately 10' South and 1' West of BB/19. El 22'YesYesNoYes5001810"X6"Checworks pick. No inspection downstream of LCV.42HD-12.2A-08TIP3-05-2489131 Heater drain pump discharge to header.Turbine Building. Located approximately 15' South of

CC 3/20. El 32'YesYesNoYes5007916"X12" teeChecworks pick. Low Checworlks hours on this tee. No recent inspections. Last was Tdat.43HD-05.1C-02RIP3-05-24892HTR 34C to HTR 33C. Exam consists of reducer HD-05.1C-02R.Turbine Building. Located approximately 5' North and 19' West of A/12, El. 36'. NoYesNoYes500206" X 3" rducrCalculation reinspection. IP-CALC-04-01787 RSL 11/201044FAC-07-HD-01IP3-05-24896Feedwater heater 32A operating vent, downstream of valve 2HD-3-1. Exam to consist of 2 elbows and 12" dnsm pipe.Turbine Building at FWH 32A. Located approx 15' North and 2' East of D6/17.3. El 38'NoYesNoYes9321-20223 Sh 2 2 1/2"Recommendation from Shaw Power Uprate En gineerin g Report Balance-of-Plant IP3 section 12.4.2 Flow Accelerated Corrosion Program Uprate Evaluation.45FAC-07-HD-02IP3-05-24897FWH 34B subcooler zone vent.

Upstream of 4HD-4-2 per previous exam.Turbine Building approximately 10' South and 10' East of CC 3/16. El 36'NoYesNoYes9321-202231"Calculation reinspection IP3-CALC-HD-02493. High wear rate indication from previous inspections (97-PT-5, 01-PT-35

). 46FAC-07-HD-03IP3-05-2498832A feedwater heater dump to 33 condenser. 90 Elbow and 12" DNSM piping, DNSM of valve LCV-1138Turbine Building. Located approximately 5' East of D6/17.3. El 15'NoYesNoYes9321-202236"From Leak report, LCV-1138 leaking to condenser47FAC-07-HD-04IP3-05-24898 canceledIP3-06-24732 REPLACEFWH 34A Operating vent, downstream of valve 4HD-3-1. Last elbow before pipe sleeve in floorTurbine Building. Located approximately 4' North and 1' East of CC 3/14. El 36'NoNoYesYes9321-202231 1/2"OE from Unit 3; leak in similar location on FWH 34B. CR-IP3-2004-00650. Small bore report.48FAC-07-HD-05IP3-05-24899FWH 34C Operatin g vent, downstream of valve 4HD-3-3. Last elbow before pipe sleeve in floorTurbine Building. Located approximately 4' North and 25' East of CC 3/14. El 36'NoNoYesYes9321-202231 1/2"OE from Unit 3; leak in similar location on FWH 34B. CR-IP3-2004-00650. Small bore report.HEATER DRAINS 6 of 15 3R14 FAC Scope (Ipe0067429).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14ER IP3-05-24045 NU MB ER E XA M P O I NT WO R K ORD E R DE SC R IPTI O N LOCA T I ON SCAFF O L D I NSULATION P AI NT P I PE P R E P DR A WI NG P I PE S I Z E RE M A R K S49RHD-01.3A-02PIP3-05-24900Reheater 32A to Reheater Drain tank.Piping segments located approximately 17' North and 16' East of A/15, El. 60'.YesYesNoYes500126"Selection from Checworks Pass 2 analysis. No inspection on this line. 50RHD-02.4A-06LIP3-05-24902RHD 32A TO HDR.Turbine Building. Located approximately 2' East and 5' North of A/18. El 33'YesYesNoYes5001510"X6"Checworks pick. Low Checworks hours on this L. Unususl configuration.51RHD-02.10A-11TIP3-05-24904RHD HDR TO 36B HTR.Turbine Building. Located approximately 4' North and 2' West of BB/19. El 33'YesYesNoYes500158"X6" teeChecworks pick. Low Checworks hours. Few inspections on this line.52RHD-02.12B-11TIP3-05-24905RHD HDR TO 36B HTR.Turbine Building. Located approximately 30' West and 10' North of A/18. El 43'NoYesNoYes500106" teeChecworks pick. Low Checworks hours. Few inspections on this line.53RHD-02.14B-12TIP3-05-24906RHD HDR TO 36C HTR.Turbine Building. Located approximately 20' West and 10' North of A/18. El 43'NoYesNoYes500106" teeChecworks pick. Low Checworks hours. Few inspections on this line.54RHD-02.6A-06LIP3-05-24907RHD 33A TO HDR.Turbine Building. Located approximately 2' East and 5' North of A/18. El 33'YesYesNoYes5001510"X6"Selection from Checworks Pass 2 analysis. Low Checworks hours, unusual geometry.55RHD-02.9A-11TIP3-05-24908RHD HDR TO 36C HTR. Above HDT.Turbine Building. Located approximately 20' South and 20' West of A/19. El 32'YesYesNoYes5001510"X6" teeChecworks pick. Low Checworks hours. Few inspections on this line.56RHD-02.5A-02RIP3-05-24910RHD 33A TO HDR. Downstream of valve LCV-1104BTurbine Building. Located approximately 3' East and 8' North of A/18. El 36'NoYesNoYes500156"X4" reducerCalculation reinspection.IP3-CALC-RHD-03450. RSL 1/200957RHD-02.6A-02EIP3-05-24911RHD 33A TO HDR. Downstream of valve LCV-1104BTurbine Building. Located approximately 3' East and 8' North of A/18. El 36'NoYesNoYes500156"Calculation reinspection.IP3-CALC-RHD-03450. RSL 10/2009REHEATER DRAINS 7 of 15 3R14 FAC Scope (Ipe0067429).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14ER IP3-05-24045 NU MB ER E XA M P O I NT WO R K ORD E R DE SC R IPTI O N LOCA T I ON SCAFF O L D I NSULATION P AI NT P I PE P R E P DR A WI NG P I PE S I Z E RE M A R K S58RHD-02.6A-03PIP3-04-13370RH 33 to Header. Exam consists of RHD-02.6A-03P. Downstream of valve LCV-1104BTurbine Building. Located approximately 3' East and 8' North of A/18. El 36'NoYesNoYes500156"Calculation reinspection for both components. IP3-CALC-RHD-03450. R11 inspection. Deferred from 3R13. RSL 12/200859RHD-02.2A-02EIP3-05-24912RHD 31A TO HDR. Downstream of valve LCV-1104CTurbine Building. Located approximately 2' East and 3' North of A/18. El 36'NoYesNoYes500156"Calculation reinspection. IP3-CALC-RHD-03450. RSL 6/201060RHD-02.3A-02RIP3-05-24913RHD 32A TO HDR. Downstream of valve LCV-1104ATurbine Building. Located approximately 3' East and 10' North of A/18. El 36'NoYesNoYes500156"X4" reducerCalculation reinspection. IP3-CALC-HD-00687. RSL 2/201161RHD-02.13B-01NIP3-05-24914RHD inlet nozzles to 36B heater.Turbine Building. Located approximately 30' West and 10' North of A/18. El 43'YesYesNoYes500108"Higher inlet velocities from SPU per SPU project manager, exam to consist of nozzle and surrounding shell.62RHD-02.14A-01NIP3-05-24915RHD inlet nozzles to 36B heater.Turbine Building. Located approximately 30' West and 10' North of A/18. El 43'YesYesNoYes500158"Higher inlet velocities from SPU per SPU project manager, exam to consist of nozzle and surrounding shell.63RHD-02.15B-01NIP3-05-24916RHD inlet nozzles to 36C heater.Turbine Building. Located approximately 20' West and 10' North of A/18. El 43'YesYesNoYes500108"Higher inlet velocities from SPU per SPU project manager, exam to consist of nozzle and surrounding shell.64RHD-02.16A-01NIP3-05-24917RHD inlet nozzles to 36C heater.Turbine Building. Located approximately 20' West and 10' North of A/18. El 43'YesYesNoYes500158"Higher inlet velocities from SPU per SPU project manager, exam to consist of nozzle and surrounding shell.65FAC-07-RHD-01IP3-05-2498931B Reheater Drain tank to condenser. Pipe and reducer downstream of RHD-LCV-1105C.Turbine Building. Located approximately 12' South of B4/15.7. El 41'NoYesNoYes500178"X6" From Leak report, LCV-1105C leaks to condenser.66FAC-07-RHD-02IP3-05-24990Main steam trap header to discharge canalTurbine Building. Located approximately 4' South and 3" East of column D1/13, El. 18'.North of DCT. El 15'NoNoYesYes9321-213134"Leak found downstream of valve MS-97 due to corrosion. Inspect upstream of section to be replaced via WO IP3-05-0500 8 of 15 3R14 FAC Scope (Ipe0067429).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14ER IP3-05-24045 NU MB ER E XA M P O I NT WO R K ORD E R DE SC R IPTI O N LOCA T I ON SCAFF O L D I NSULATION P AI NT P I PE P R E P DR A WI NG P I PE S I Z E RE M A R K S67MSD-01.3B-03EIP3-05-2493031B MSR drain to MSR drain tankTurbine Building. Located underneath 31B MSRYesYesNoYes50078 12"Checworks pick. Need inspections on parallel trains and varied geometry for model calibration. OE from Calvert Cliffs. Common scaffold with MSD-01.3B-03E and MSD-01.1B-

06T68MSD-01.1B-06TIP3-05-2493131B MSR drain to MSR drain tankTurbine Building. Located underneath 31B MSRYesYesNoYes5007812"Checworks pick. Need inspections on parallel trains and varied geometry for model calibration. OE from Calvert Cliffs. Common scaffold with MSD-01.3B-03E and MSD-01.1B-06T69FAC-07-VCD-01IP3-05-24991Piping segments from MSR 31A. Exam consists of 12 components inspected in FAC exam 99-PT-25, UT report 99UT258, WO 99-02585-34.Piping segments are located approximately 2' South and 1' East of B4/17.3. El 45'YesYesNoYes9321-F-29013

-1 3"Calculation reinspection 99-PT-25-2 IP3-CALC-MSR-03132. May be descoped if recommended VCD piping replacements implemented.70FAC-07-VCD-02IP3-05-24993Piping segments from MSR 31B, back to back 45 elbows, 6" UPSM and DNSMPiping segments are located approximately 12' West of F/19. El 45'YesYesNoYes9321-F-29013

-1 3"Calculation reinspection 99-PT-29-5 IP3-CALC-MSR-03132. May be descoped if recommended VCD piping replacements implemented.

71FAC-07-VCD-03 14CIP3-05-24933Piping segments DNSM of 31A MSR valve VCD-PCV-7008. Exam consists of 12" piping UPSM and DNSM of Westinghouse Flow Control section and all pipe and components DNSM of the control section until the pipe enters the 31 condenser.Turbine Building. Located approximately 6' North and 2' West of B4/14.3 El. 36'. 3' under grating. Partially accessible from work platform on 31 condenser.YesYesNoYes9321-F-20233 Sheet 1 and 29033 3"Calculation reinspection 03-PT-

02. IP3-CALC-HD-03735. Ma y be descoped if recommended VCD piping replacements implemented. UPSM pipe inspected in 3R13 FAC-05-VCD-04P 14C 72FAC-07-VCD-04 14CIP3-05-24934Piping segments DNSM of 32A MSR valve VCD-PCV-7009. Exam consists of 12" piping UPSM and DNSM of Westinghouse Flow Control section and all pipe and components DNSM of of the control section until the pipe enters the condenser.Turbine Building. Located approximately 2' South and 2' East of B4/15.7. From El. 36', 3' under gratingYesYesNoYes9321-F-20233 Sheet 1 and 29033IP3 24934 3"Calculation reinspection 03-PT-03. IP3-CALC-HD-03735. May be descoped if recommended VCD piping replacements implemented.

14C73FAC-07-VCD-05IP3-03-24788Piping segments from MSR 32B. Two (2) 90 degree elbows per previous exam.Turbine Building. Located approximately 12' west and on the centerline of F/19, El. 46'YesYesNoYes9321-F-29013

-1 3"Calculation reinspect IP3-CALC-MSR-03132 Rev. 1, 1B 3R12 exam point 03-PT-06-03. System Engineer recommendation, experience with leaks and wear in this piping. Deferred from 3R13.MSR DRAINS 9 of 15 3R14 FAC Scope (Ipe0067429).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14ER IP3-05-24045 NU MB ER E XA M P O I NT WO R K ORD E R DE SC R IPTI O N LOCA T I ON SCAFF O L D I NSULATION P AI NT P I PE P R E P DR A WI NG P I PE S I Z E RE M A R K S74FAC-07-VCD-06IP3-05-25023Exam consists of elbow dnsm of VCD-PCV-7009Turbine Building. Located approximately 10' East of A/15. EL 53'NoYesNoYes9321-202333"Reinspection 03-PT-01, FAC-05-VCD-1475FAC-07-VCD-07IP3-05-25024EXAM CONSISTS OF ELBOW DOWNSTREAM OF VCD-2. MSR 33BTurbine Building. Located approximately 7' West and 4' North and F/17. El 53'NoYesNoYes9321-202333"Reinspection FAC-05-VCD-16 76FAC-07-VCD-08CanceledIP3-05-25025Piping from 32A MSR to 36A FWH. Exam consists of 90 elbow and 6" UPSM and DNSM.Turbine Building. Located approximately 10' South and 2' West of B4/15.7. El 45'YesYesNoYes9321-290133"Reinspection 99-PT-24-10 CANCELED (Replaced)77FAC-07-MSR-01IP3-05-24937Piping segments to include four (4) 90 degree elbows plus 12" UPSM and DNSM piping adjacent to fittings of the MSR 33B Channel Head vent line to the reheater drain tank 33B.Turbine Building. Located approximately 4' North and 21' West of F/17., El. 58'YesYesNoYes9321-F-20233 Sheet 2 2 1/2"Calculation reinspection 03-PT-26, IP3-CALC-HD-03812.78FAC-07-MSR-02IP3-05-25033Piping DNSM of MS-PCV-7005, MSR leak off valve.Turbine Building. 53' El.YesYesNoYes9321-F-202331"From Leak report, PCV-7005 leaks to condenser. Confirm scaffoldng and insulation.

10 of 15 3R14 FAC Scope (Ipe0067429).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14ER IP3-05-24045 NU MB ER E XA M P O I NT WO R K ORD E R DE SC R IPTI O N LOCA T I ON SCAFF O L D I NSULATION P AI NT P I PE P R E P DR A WI NG P I PE S I Z E RE M A R K S79MS-FE-449IP3-05-24959Main Steam Venturi from 34 SG.VC El 107'YesYesNoYes9321-F-2542328"Per OE 15860 from Calvert Cliffs. Piping wall erosion found around the drain slots at the DNSM end of the Main Steam Flow Venturi.80FAC-07-MST-01IP3-05-25028Piping segments downstream of MST-80, per previous inspection 01-PT-24 Turbine Building. Located approximately 25' West of F/14, El. 36'NoYesNoYes9321-F-204233/4", 1"Calculation reinspection 01-PT-24. IP3-CALC-03426. RSL 9/200881FAC-07-MST-02IP3-05-24940Piping segments to include DNSM pipin g of MST-24 and b ypass valve MS-100-3 to 12" DNSM of valve MS-99-30Turbine Building. Located approximately on the centerline and 2' West of A/19, El. 15'NoYesNoYes9321-F-204133/4", 1"Calculation reinspection IP-CALC-05-00099. Last inspected 3R13.82FAC-07-MST-03IP3-05-25029Piping segments to include DNSM piping of MST-4 and bypass valve MS-68-4 to 12" DNSM of valve MS-105-4Aux Boiler Building. Located approximately 10' West of H8/20 7. El 43'NoYesNoYes9321-F-204133/4", 1"Trap leaks by. IP3-05-00385. Steam trap report.83FAC-07-MST-04IP3-05-24941Piping segments to include DNSM pipin g of MST-25 and b ypass valve MS-100-4 to 12" DNSM of valve MS-99-34Turbine Building. Located approximately on the centerline and 2' South of A/19, El. 15'NoYesNoYes9321-F-204133/4", 1"Past leaks; never been inspected. Steam trap report.84FAC-07-TD-01IP3-05-24942Piping segments to include two (2) 45

de gree elbows and pipin g UPSM of MS

-FCV-1157 and one (1) elbow and piping DNCM of MS-FCV-1157 until it enters the condenser.Piping segments located on the mezz. Platform under HP Turbine. Southwest corner approximate El. 31'NoYesNoYes9321-F-20173 1.5" 2"Calculation reinspection 03-PT-09, IP3-CALC-MS-03085. Ma y be descoped if recommended High Pressure Turbine drain piping replacements implemented.85FAC-07-TD-02IP3-05-24943Piping segments to include piping and (3) elbows UPSM of MS-FCV-1155 and 1 elbow and piping DNSM to h the condenser.Piping segments located on the mezz. Platform under HP Turbine. Southwest corner approximate El. 31'NoYesNoYes9321-F-20173 1.5" 2"Calculation reinspection 03-PT-12-01, IP3-CALC-MS-03085. Ma y be descoped if recommended High Pressure Turbine drain piping replacements implemented.86FAC-07-TD-03IP3-05-24944Piping DNSM of MS-HCV-416-3.Northeast corner HP turbine El.

53'.NoYesNoYes9321-F-201739321-F-208231.5", 3"Calculation reinspection. IP-CALC-04-01795. FAC-05-TD-02.

Also System Engineer recommendation; experience with leaks in this piping.MAIN STEAMHIGH PRESSURE TURBINE DRAINS 11 of 15 3R14 FAC Scope (Ipe0067429).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14ER IP3-05-24045 NU MB ER E XA M P O I NT WO R K ORD E R DE SC R IPTI O N LOCA T I ON SCAFF O L D I NSULATION P AI NT P I PE P R E P DR A WI NG P I PE S I Z E RE M A R K S87HD-9.3A-02NIP3-05-25031LPFWH 31A Drains inlet nozzle and adjacent shell areaTurbine Building. Located on the north side of LPFWH 31A next to condenser wall.YesYesNoYes5003112"Recommendation in SPU report "Evaluation of Feedwater Heater Performance Operation at current and Uprate Conditions Indian Point Station Unit No. 3; Low Pressure Heater No. 31 ABC".

Common scaffold with HD-9.3A-02N and HD-9.4A-04N.88HD-9.4A-04NIP3-05-25032LPFWH 31A Drains inlet nozzle and adjacent shell areaTurbine Building. Located on the north side of LPFWH 31A next to condenser wall.YesYesNoYes5003112"Recommendation in SPU report "Evaluation of Feedwater Heater Performance Operation at current and Uprate Conditions Indian Point Station Unit No. 3; Low Pressure Heater No. 31 ABC".

Common scaffold with HD-9.3A-02N and HD-9.4A-04N.89EX-05.1C-04NIP3-05-24948LPFWH 32C Steam Inlet nozzle and adjacent shell area.Turbine Building LPFWH 32C; exam location inside condenser.YesTSNoYes5008722"Recommendation in SPU report "Evaluation of Feedwater Heater Performance Operation at current and Uprate Conditions Indian Point Station Unit No. 3; Low Pressure Heater No. 32 A/B/C".

Note that nozzle and extraction steam inlet piping on 32B was performed during 3R13, but shell was not inspected.90EX-05.2C-06NIP3-05-24950LPFWH 32C Steam Inlet nozzle and adjacent shell area.Turbine Building LPFWH 32C; exam location inside condenser.YesTSNoYes5008722"Same as EX-05.1C-04N.91EX-04.6-06NIP3-05-25045LPFWH 33A Steam Inlet Nozzle and adjacent shell area.Turbine Building LPFWH 33AYesYesNoYes5000720"No previous inspections on LPFWH 33 shells. OE21384 from LaSalle experienced steam leak in shell adjacent to impingement plate.FEEDWATER HEATERS 12 of 15 3R14 FAC Scope (Ipe0067429).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14ER IP3-05-24045 NU MB ER E XA M P O I NT WO R K ORD E R DE SC R IPTI O N LOCA T I ON SCAFF O L D I NSULATION P AI NT P I PE P R E P DR A WI NG P I PE S I Z E RE M A R K S92PD-01.2-10OIP3-04-13364PRESEPRTR DRAINS Exam consists of orifice PD-01.2-10O.Turbine Building. Located approximately 15' South and 10' West of C4/20, El. 16'NoYesNoYesEC-H-5007510"Checworks pick. No inspection downstream of orifice or on this line. Deferred from 3R13.93SJAE31-DS-CV19IP3-05-24945SJAE31 Intermediate condenser drain DNSM of valve CA-CV-19. Exam to consist of piping downstream of valve to 12" dnsm of elbow.Turbine building. Underneath SJAE 31 located 3' North and 7' East of A/12. El 36'NoNoYesYes9321-F-202531"System Engineer recommendation. OE from other plants. Leaks or failures in this system caused shutdowns due to loss of condenser vacuum.94SJAE31-DS-CV28IP3-05-24946SJAE31 Intermediate Condenser drain DNSM of valve CA-CV-28 at condenser connectionTurbine building. North of DCT at condenser wall.YesNoYesYes9321-F-202531"System Engineer recommendation. OE from other plants. Leaks or failures in this system caused shutdowns due to loss of condenser vacuum.95RHD-02.15A-02EIP3-06-23430RHD HDR TO 36C HTR. Above HDT.Turbine Building. Located approximately 20' South and 20' West of A/19. El 32'YesYesNoYes500156"EOC for leak CR-IP3-2006-0227096RHD-02.13A-01PIP3-06-23432RHD HDR TO 36B HTR.Turbine Building. Located approximately 4' North and 2' West of BB/19. El 33'YesYesNoYes500156" EOC for leak CR-IP3-2006-0227097RHD-02.13A-02EIP3-06-23440RHD HDR TO 36B HTR.Turbine Building. Located approximately 4' North and 2' West of BB/19. El 33'YesYesNoYes500156" EOC for leak CR-IP3-2006-0227098RHD-02.8B-06TIP3-06-23441RHD HDR TO 36C HTRTurbine Building. Located approximately 4' North and 2' West of BB/19. El 33'YesYesNoYes5001010" X 6"EOC for leak CR-IP3-2006-0227099RHD-02.14B-01PIP3-06-23446RHD HDR TO 36C HTRTurbine Building. Located approximately 4' North and 2' West of BB/19. El 33'YesYesNoYes500106"EOC for leak CR-IP3-2006-02270100RHD-02.14B-02EIP3-06-23447RHD HDR TO 36C HTRTurbine Building. Located approximately 4' North and 2' West of BB/19. El 33'YesYesNoYes500106"EOC for leak CR-IP3-2006-02270101RHD-02.9B-02TIP3-06-23449RHD HDR TO 36B HTR.Turbine Building. Located approximately 4' North and 2' West of BB/19. El 33'YesYesNoYes5001010" x 6"EOC for leak CR-IP3-2006-02270102RHD-02.12B-01PIP3-06-23450RHD HDR TO 36B HTR.Turbine Building. Located approximately 4' North and 2' West of BB/19. El 33'YesYesNoYes500106"EOC for leak CR-IP3-2006-02270103RHD-02.12B-02EIP3-06-23451RHD HDR TO 36B HTR.Turbine Building. Located approximately 4' North and 2' West of BB/19. El 33'YesYesNoYes500106"EOC for leak CR-IP3-2006-02270104EX-01.5A-15NIP3-06-2334636A FWH EX STEAM INLET NOZZLETB 36'YesYesNoYes50000EOC For leak in 25C FWH UT examSTEAM JET AIR EJECTORSPRESEPARATOR DRAINSADDED SCOPE 13 of 15 3R14 FAC Scope (Ipe0067429).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14ER IP3-05-24045 NU MB ER E XA M P O I NT WO R K ORD E R DE SC R IPTI O N LOCA T I ON SCAFF O L D I NSULATION P AI NT P I PE P R E P DR A WI NG P I PE S I Z E RE M A R K S105EX-01.5A-15NIP3-06-2452436A FWH EX STEAM INLET NOZZLETB 36'YesYesNoYes50000EOC For leak in 25C FWH PEC Exam106EX-01.5B-13NIP3-06-2335636B FWH EX STEAM INLET NOZZLETB 36'YesYesNoYes50000EOC For leak in 25C FWH UT Exam107EX-01.5B-13NIP3-06-2452636B FWH EX STEAM INLET NOZZLETB 36'YesYesNoYes50000EOC For leak in 25C FWH PEC Exam108EX-01.5C-13NIP3-06-2336636C FWH EX STEAM INLET NOZZLETB 36'YesYesNoYes50000EOC For leak in 25C FWH UT Exam109EX-01.5C-13NIP3-06-2452936C FWH EX STEAM INLET NOZZLETB 36'YesYesNoYes50000EOC For leak in 25C FWH PEC Exam110FAC-07-VCD-09IP3-06-23456VCD Discharge from MSR 31A TB EL 52'YesYesNoYes9321-29013Pipe replacement scope reduction111FAC-07-VCD-10IP3-06-23458VCD Discharge from MSR 31A; 4 elbowsTB EL 36' West of 33' mezz stairsNoYesNoYes9321-29023Pipe replacement scope reduction112FAC-07-VCD-11IP3-06-23462VCD Discharge from MSR 32A; 2 elbowsTB EL 36' West of 33' mezz stairsNoYesNoYes9321-29023Pipe replacement scope reduction113FAC-07-VCD-12IP3-06-23464VCD Discharge from MSR 33A; 1 elbowTB EL 36' West of 33' mezz stairsNoYesNoYes9321-29023Pipe replacement scope reduction114FAC-07-GSS-01IP3-06-23466Inspection of Gland Seal Steam piping inside condenserCondenserNoNoNoYes9321-05-2355723J753Siemens Westinghouse OE Service Bulletin 53009 STTotals741038114408106Total Thermal insulation 3Total FAC Exam's1141141141141EX-05.1C-04NIP3-06-22059IP3-06-22061Remove/Replace thermal shields on EX-05.1C-04N and shell to support FAC Exams. 32C FWHInside 31 Condenser2EX-05.2C-06NIP3-06-22085IP3-06-22086Remove/Replace thermal shields on EX-05.2C-06N and shell to support FAC Exams 32C FWHInside 31 Condenser3EX-04.2-09TIP3-05-24952 IP3-05-24955Remove/Replace thermal shields on EX-04.2-09T to support FAC ExamsInside 33 Condenser4EX-04.2-09TIP3-05-25034Open 33 Condenser 33 Condenser 5EX-05-1C-04NEX-05.2C-06NIP3-06-22118OPEN 31 CONDENSER31 CONDENSERSUPPORT WORK ORDERS 14 of 15 3R14 FAC Scope (Ipe0067429).Xls FLOW ACCELERATED CORROSION INSPECTION POINTS FOR 3R14ER IP3-05-24045 NU MB ER E XA M P O I NT WO R K ORD E R DE SC R IPTI O N LOCA T I ON SCAFF O L D I NSULATION P AI NT P I PE P R E P DR A WI NG P I PE S I Z E RE M A R K S 1Contingency WO from RO12IP3-027763793 2Contingency WO from 3R13IP3-03-113453Inaccessible location.IP3-03-18570 4Alternate location selected in 3R13.IP3-04-13348 5Alternate location selected in 3R13.IP3-04-13349 6Contingency WO from 3R13.IP3-03-11337Number of Scaffolds needed 74PRE-OUTAGE INSPECTIONSCost of scaffolds

$280,000 AInsulation likely to contain asbestos TSInsulation is a welded stainless steel Thermal ShieldNumber of insulation(remove/install) 103Cost of insulation$164,000LEGENDWORK ORDERS TO BE CANCELLED 15 of 15 3R14 FAC Scope (Ipe0067429).Xls 25, 22%7, 6%28, 25%34, 30%2, 2%12, 10%6, 5%3R14 FLOW ACCELERATED CORROSION INSPECTION

SUMMARY

REASONS FOR SELECTION OF 114 INSPECTION LOCATIONSCHECWORKSINDUSTRY OEIPEC OECALCULATION REINSPECTIONSNAPSHOT SCOPE ASSESSMENTPOWER UPRATEDEFERRALS NUMBER EX A MPOINTWORK ORDER EXTRACTION 1 EX-04.2-09T IP3-05-24954 2 EX-02.14-07P IP3-05-24843 3 EX-04.13-07T IP3-05-24846 4EX04408EIP302484 EXTRACTION 4 EX-04.4-08E IP3-05-24847 5 EX-04.11-08E IP3-05-24848 6 EX-04.21-02P IP3-05-24849 7 EX-03.1A-14E IP3-05-24850 8 FAC-07-EX-01 IP3-05-24984 9 FAC-07-EX-02 IP3-05-24851 10 FAC-07-EST-01 IP3-05-24853 FEEDWATER 11 FW-02.1A-01N IP3-05-2485412FW-02.1A-02EIP3-05-2485613FW-02.1A-03PIP3-05-24857 14FW-02.1A-04EIP3-05-24858 15FW-01.3-13PIP3-05-2485916FW-01.3-14EIP3-05-2486017FW-02.4-11EIP3-05-24861 FEEDWATER 18 FW-02.8A-26R IP3-04-13353 19 FW-02.8B-25R IP3-05-24864 20 FW-02.8D-24R IP3-05-24866 21 FW-02.5-03T IP3-05-24985 22 FW-03.1D-08B IP3-05-24867 23 FW-03.1C-13P IP3-04-13354 24 FW-02.8B-13F IP3-05-24868 25FW016C10NIP30524869 25 FW-01.6C-10N IP3-05-24869 26 FW-01.6A-12N IP3-05-24870 27 CD-06.3B-02N IP3-05-24872 28 CD-05.1B-04P IP3-04-13366 29 CD-03.1C-01N IP3-05-24873 30 CD-04.1C-01N IP3-05-24874 31 CD-04.1C-5E IP3-05-24875 CONDENSATE 31CD04.1C5EIP30524875 32 CD-04.1C-7E IP3-05-24876 33 CD-2.1C-12T IP3-05-2487734CD-2.8C-03PIP3-05-24882 35CD-2.8B-01PIP3-05-24883 36CD-2.8B-03PIP3-05-24886 37CD-04.1A-04PIP3-05-24887 38FAC-07-CP-01IP3-05-24986 39FAC07CP02IP30524987 39 FAC-07-CP-02 IP3-05-24987 40 HD-3.1B-09E IP3-05-24889 41 HD-2.1B-02R IP3-05-24890 42 HD-12.2A-08T IP3-05-24891 43 HD-05.1C-02R IP3-05-24892 44 FAC-07-HD-01 IP3-05-24896 HEATER DRAINS 45 FAC-07-HD-02 IP3-05-24897 46 FAC-07-HD-03 IP3-05-24988 47 FAC-07-HD-04 IP3-05-24898 48 FAC-07-HD-05 IP3-05-24899 49 RHD-01.3A-02P IP3-05-24900 50 RHD-02.4A-06L IP3-05-24902 51RHD0210A11TIP30524904 REHEATER DRAINS 51 RHD-02.10A-11T IP3-05-24904 52 RHD-02.12B-11T IP3-05-24905 53 RHD-02.14B-12T IP3-05-24906 54 RHD-02.6A-06L IP3-05-24907 55 RHD-02.9A-11T IP3-05-24908 56 RHD-02.5A-02R IP3-05-24910 57 RHD-02.6A-02E IP3-05-24911 58 RHD-02.6A-03P IP3-04-13370 58RHD02.6A03PIP30413370 59 RHD-02.2A-02E IP3-05-24912 60 RHD-02.3A-02R IP3-05-24913 61 RHD-02.13B-01N IP3-05-24914 62 RHD-02.14A-01N IP3-05-24915 63 RHD-02.15B-01N IP3-05-24916 64 RHD-02.16A-01N IP3-05-24917 65 FAC-07-RHD-01 IP3-05-24989 66FAC07RHD02IP30524990 66 FAC-07-RHD-02 IP3-05-24990 67 MSD-01.3B-03E IP3-05-24930 68 MSD-01.1B-06T IP3-05-24931 69 FAC-07-VCD-01 IP3-05-24991 70 FAC-07-VCD-02 IP3-05-24993 71 FAC-07-VCD-03 IP3-05-24933 72 FAC-07-VCD-04 IP3-05-24934 MSR DRAINS 72 FAC-07-VCD-04 IP3-05-24934 73 FAC-07-VCD-05 IP3-03-24788 74 FAC-07-VCD-06 IP3-05-25023 75 FAC-07-VCD-07 IP3-05-25024 76 FAC-07-VCD-08 IP3-05-25025 77 FAC-07-MSR-01 IP3-05-24937 78 FAC-07-MSR-02 IP3-05-25033 MAIN STEAM 79 MS-FE-449 IP3-05-24959 80 FAC-07-MST-01 IP3-05-25028 81 FAC-07-MST-02 IP3-05-24940 82 FAC-07-MST-03 IP3-05-25029 83 FAC-07-MST-04 IP3-05-24941 84 FAC-07-TD-01 IP3-05-24942 HIGH PRESSURE TURBINE DRAINS 85 FAC-07-TD-02 IP3-05-24943 86 FAC-07-TD-03 IP3-05-24944 87 HD-9.3A-02N IP3-05-25031 88 HD-9.4A-04N IP3-05-25032 89 EX-05.1C-04N IP3-05-24948 90 EX-05.2C-06N IP3-05-24950 FEEDWATER HEATERS 91 EX-04.6-06N IP3-05-2504592PD-01.2-10OIP3-04-1336493SJAE31-DS-CV19IP3-05-2494594SJAE31-DS-CV28IP3-05-24946 PRESEPARATOR DRAINS STEAM JET AIR EJECTORSSUPPORTWORKORDERS 1 EX-05.1C-04N IP3-05-24952 2 EX-05.2C-06N IP3-05-24952 3 EX-04.2-09T IP3-05-24955 4 LPFW32C IP3-05-250341Contingency WO from RO12 IP3-0277637932Contin g enc y WO from 3R13 IP3-03-11345SUPPORTWORKORDERS 3R14 WORK ORDERS TO BE CANCELLED 2ContingencyWOfrom3R13IP303113453Inaccessible location.

IP3-03-18570 4 Alternate location selected in

3R13.IP3-04-13348 5 Alternate location selected in

3R13.IP3-04-133496Contingency WO from 3R13.

IP3-03-11337 3R14 FAC Scope Work Breakdown Total number of inspectons Number of FAC Portals 1 Number of scaffolds Number of insulation removals 111 inspections; 8 of which are pre-outage6149 97 Insulation removals; 3 of which are Stainless Steel thermal shields

located in condenser

1. Portals are first time FAC inspections that are to be re-insulated with blanket insulation for ease of

removal for future inspection. Becomes capital expense.