UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C 20555-0001 July 3, 2019 The Licensees of Operating Power Reactors on the Enclosed List
SUBJECT:
TREATMENT OF REEVALUATED SEISMIC HAZARD INFORMATION PROVIDED UNDER TITLE 10 OF THE CODE OF FEDERAL REGULA T/ONS 50.54(1) REGARDING RECOMMENDATION 2.1 OF THE NEAR-TERM TASK FORCE REVIEW OF INSIGHTS FROM THE FUKUSHIMA DAI-ICHI ACCIDENT This document describes the U.S. Nuclear Regulatory Commission (NRG) staff's treatment of reevaluated seismic hazard information.
The treatment of seismic hazard information reflects the Commission's direction in the Affirmation Notice and Staff Requirements Memorandum (SRM) dated January 24, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19023A038), associated with SECY-16-0142, "Draft Final Rule-Mitigation of Beyond-Design-Basis Events [MBDBEJ (RIN 3150-AJ49)," (ADAMS Accession No. ML16291A186).
Based on the reevaluated seismic hazard information that has been provided to date, only seismic probabilistic risk assessment (SPRA) report reviews that have not yet received a staff assessment could potentially lead to the staff identifying a need for modifying, suspending or revoking a license. The staff has evaluated the status of each site and placed sites into one of four categories:
category 1 (no additional regulatory action is warranted);
category 2 (additional insights needed); category 3 (ongoing review): and category 4 (deferred).
Enclosure 1, Table 1 provides the status of sites based on the staffs review of the reevaluated seismic hazard information and backfit determinations to date. The NRG staff has suspended its review of seismic mitigation strategies assessments (MSAs). Summary By letter dated March 12, 2012 (ADAMS Accession No. ML12053A340), the NRC issued a request for information to all power reactor licensees and holders of construction permits in active or deferred status, under Title 1 O of the Code of Federal Regulations (1 O CFR), Section 50.54(f) (hereafter referred to as the "50.54(f) letter").
The request was issued in connection with implementing lessons learned from the 2011 accident at the Fukushima Dai-ichi nuclear power plant, as documented in the NRC's Near-Term Task Force (NTTF) report (ADAMS Accession No. ML111861807).
Enclosure 1 of the 50.54(!) letter requested that licensees reevaluate seismic hazards for their sites using present-day methods and regulatory guidance used by the NRC staff when reviewing applications for early site permits and combined licenses.
The 50.54(f) letter describes a two-phase process for providing and assessing this information.
Phase 1 of the process is defined in the 50.54(f) letter as licensees reevaluating the seismic hazards at their sites using updated seismic hazard information and present-day regulatory guidance and methodologies, and, if necessary, to request they perform a risk evaluation.
Phase 2 of the process is outlined by the 50.54(f) letter and is defined as the NRG staff determining whether additional regulatory actions are necessary (e.g., update the design basis and structures, systems, and components (SSCs) important to safety) to provide additional protection against the updated hazards. In implementing the NRC's Phase 2 process, the staff will follow the guidance provided in a memorandum dated September 21, 2016 (ADAMS Accession No. ML16237A103), which remains in accordance with the most recent Commission direction provided in SRM-SECY-18-0049, "Management of Facility-Specific Backfitting, Issue Finality, and Information Collection," (ADAMS Accession No. ML19149A294).
The staff's treatment of the reevaluated hazard information outlined in this document used information provided in response to the 50.54(f) letter and describes how the staff is using this information for its Phase 2 decisionmaking.
Highlights of the staff's progress in this area are as follows:
- Only SPRA report reviews that have not yet received a staff assessment could potentially lead to the staff identifying a need for modifying, suspending or revoking a license in accordance with the Phase 2 process. The staff will continue its assessment of SPRA reports and will use these results in the Phase 2 process described in the 50.54(f) letter and by the memorandum dated September 21, 2016.
- The staff has suspended its review of seismic MSAs. The majority of these MSAs have previously been evaluated by the staff. For the reviews not yet completed, or not yet submitted, the staff will evaluate the mitigation strategies, as appropriate, as part of its review of SPRA reports. Licensees are no longer expected to submit MSAs associated with their reevaluated seismic hazard.
- To provide clarity regarding the status of each site's response to the 50.54(f) letter, this letter bins sites in one of the following four categories:
o Category 1 -No additional regulatory action is warranted.
This Category groups the sites where licensees and NRC staff are done with the seismic reevaluation assessments and backfit decisions.
There are 47 sites in this category.
o Category 2 -Additional insights are needed before a backfit decision is made. There are no sites in this category.
o Category 3 -Corresponds to sites that have reevaluated seismic information that will be reviewed by the staff. This Category includes sites that have active SPRA report reviews or that will submit an SPRA report before the end of 2019. The NRC staff has not make a final backfit determination on these sites. There are 9 sites in this category.
o Category 4 -Corresponds to sites that have had, or requested that, reevaluated hazard information submittals be deferred to a date after the licensee's proposed date to shut down its reactor(s).
There are three sites in this category.
Background The seismic reevaluated hazard information provided in response to the 50.54(f) letter was the focus of the seismic hazard screening reports. Depending on the site-specific reevaluated seismic hazard, other necessary licensee submittals may have included:
- 1) an expedited seismic evaluation process (ESEP) report, 2) seismic MSA; 3) spent-fuel pool (SFP) seismic integrity evaluation;
- 4) seismic high frequency confirmation; and/or 5) SPRA report. The staff's discussion of the reevaluated hazard information that has been provided by licensees in response to the 50.54(f) letter is found in Enclosure 1 of this document.
The draft final MBDBE rule, provided in SECY-16-0142, contained provisions that would have required mitigation strategies to address the reevaluated seismic hazard information on a generic basis. As reflected in the Affirmation Notice and SRM dated January 24, 2019, the Commission determined that addressing the reevaluated hazards in their mitigation strategies on a generic basis was not needed for adequate protection of public health and safety but would instead be assessed on a plant-specific, case-by-case basis under the requirements of 10 CFR § 50.109, "Backfitting," and§ 52.98, "Finality of combined licenses; information requests." The January 24, 2019, SRM directs the staff to use the 50.54(f) process to ensure that the NRC and its licensees will take the needed actions, if any, to ensure there is no undue risk to public health and safety due to the potential effects of the reevaluated seismic hazards. The SRM further directs that the staff should continue these efforts, utilizing existing agency processes to determine whether an operating power reactor license should be modified, suspended, or revoked in light of the reevaluated hazard. Determination As described in Enclosure 1, the staff has reviewed the reevaluated seismic hazard information that has been provided to date and issued corresponding staff assessments for many sites. The conclusions documented in those assessments remain valid based on the demonstrated inherent capacity of SSCs and portable equipment.
Furthermore, the staff has determined that only SPRA report reviews that have not yet received a staff assessment could potentially lead to the staff identifying a need for modifying, suspending or revoking a license in accordance with the Phase 2 process. Stakeholder Interactions Treatment of the reevaluated hazard information was discussed in a February 28, 2019 (ADAMS Accession No. ML19052A511
), public meeting. During this meeting, the staff provided an overview of the preliminary determination process (ADAMS Accession No. ML19037A443) and sought questions and comments from interested stakeholders.
The NRC meeting materials are available under ADAMS Accession No. ML19042A683.
The staff's treatment of reevaluated seismic hazards reflected in this letter considers the comments received at the February 28, 2019, public meeting, as well as comments submitted to the staff by letter dated March 27, 2019 (ADAMS Accession No. ML190958537) from the Nuclear Energy Institute.
Conclusion Based on the staff's evaluation provided in Enclosure 1, the staff has determined that the conclusions documented in each of the reevaluated seismic hazard staff assessments issued to date remain valid and additional regulatory actions are not warranted for those sites. Reviews will continue to be performed for SPRA reports that have been received by the staff and are currently under review. Additionally, the staff will continue to use the same process to review SPRA reports that are scheduled to be submitted through the end of 2019. A small number of sites have received SPRA report deferral approvals corresponding to planned plant closures.
Enclosure 1, Table 1 provides a status of the staff's review of the reevaluated seismic hazard information and the seismic binning for each site.
If you have any questions, please contact Milton Valentin-Olmeda at 301-415-2864, or by e-mail at Milton.Valentin-Olmeda@nrc.gov.
Enclosures:
Sincerely, Louise Lund, Director Division of Licensing Projects Office of Nuclear Reactor Regulation
- 1. Treatment of Reevaluated Seismic Hazard Information
- 2. List of Licensees cc w/encls: Distribution via list serv Treatment of Reevaluated Seismic Hazard Information Contents 1.0 Introduction and Summary .. 2.0 Background 3.0 Process . 4.0 Seismic Reevaluated Hazards .... 4.1 Expedited Seismic Evaluation Process .. 4.2 Seismic Spent Fuel Pool Evaluations . 4.3 Seismic High Frequency Confirmations . 4.4 Mitigation Strategies Assessments . 4.5 Seismic Probabilistic Risk Assessments . 5.0 Conclusion . . .................
1 .. 2 .. 2 . ...... 4 . ...........................................
4 . ...............
5 . ...... 6 . ..................
6 . ... .7 .7 Enclosure 1
1.0 Introduction and Summary This document describes the U.S. Nuclear Regulatory Commission (NRC) staff's process for reviewing the reevaluated seismic hazard information in backfit determinations.
The process reflects the Commission's direction in the Affirmation Notice and Staff Requirements Memorandum (SRM) dated January 24, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19023A038), associated with SECY-16-0142, "Draft Final Rule-Mitigation of Beyond-Design-Basis Events [MBDBE] (RIN 3150-AJ49)," (ADAMS Accession No. ML16291A186).
The preliminary process was first described in a discussion paper (ADAMS Accession No. ML19037A443), which was the subject of a public meeting held on February 28, 2019 (ADAMS Accession No. ML19052A511
). Stakeholder feedback from that meeting submitted in a letter dated March 27, 2019 (ADAMS Accession No. ML190956537) has been considered in the development of this process for reviewing reevaluated seismic hazard information.
By letter dated March 12, 2012 (ADAMS Accession No. ML12053A340), the NRC issued a request for information to all power reactor licensees and holders of construction permits in active or deferred status, under Title 1 O of the Code of Federal Regulations (10 CFR), Section 50.54(f) (hereafter referred to as the "50.54(f) letter").
The request was issued in connection with implementing lessons learned from the 2011 accident at the Fukushima ichi nuclear power plant, as documented in the NRC's Near-Term Task Force (NTIF) report (ADAMS Accession No. ML111861807).
Enclosure 1 of the 50.54(1) letter requested that licensees reevaluate seismic hazards for their sites using present-day methods and regulatory guidance used by the NRG staff when reviewing applications for early site permits and combined licenses.
The 50.54(f) letter describes a two-phase process for providing and assessing this information.
Phase 1 of the process is defined in the 50.54(f) letter as licensees reevaluating the seismic hazards at their sites using updated seismic hazard information and present-day regulatory guidance and methodologies, and, if necessary, perform a risk evaluation.
These evaluations associated with the requested information do not revise the design basis of the plant. Phase 2 of the process is outlined by the 50.54(f) letter and is defined as the NRG staff determining whether additional regulatory actions are necessary (e.g., update the design basis and structures, systems, and components (SSCs) important to safety) to provide additional protection against the updated hazards. In implementing the NRC's Phase 2 process, the staff will follow the guidance provided in a memorandum dated September 21, 2016 (ADAMS Accession No. ML16237A103), which remains in accordance with the most recent Commission direction provided in SRM-SECY-18-0049, "Management of Facility-Specific Backfitting, Issue Finality, and Information Collection," (ADAMS Accession No. ML19149A294).
The process outlined in this letter used information provided in response to the 50.54(f) letter and describes how the staff used this information for its Phase 2 decisionmaking.
Highlights of the staff's progress in this area are as follows:
- Based on the reevaluated seismic hazard information that has been provided to date, only SPRA report reviews that have not yet received a staff assessment could potentially lead to the staff identifying a need for modifying, suspending or revoking a license in accordance with the Phase 2 process. The staff will continue its assessment of SPRA reports and will use the results of these assessments in the Phase 2 process described in the 50.54(f) letter and by the memorandum dated September 21, 2016.
- The staff has suspended its review of seismic mitigation strategies assessments (MSAs). The majority of these MSAs have previously been evaluated by the staff. For the reviews not yet completed, or not yet submitted, the staff will evaluate the mitigation strategies, as appropriate, as part of its review of SPRA reports. Licensees are no longer expected to submit MSAs associated with their reevaluated seismic hazard.
- To provide clarity regarding the status of each site's response to the 50.54(f) letter, the NRC staff is binning sites in one of four categories as described in the section 3 of this Enclosure.
Table 1 provides the site binning described in section 3. 2.0 Background The seismic reevaluated hazard information provided in response to the 50.54(f) letter was the focus of the seismic hazard screening reports. Depending on the site-specific reevaluated seismic hazard, other necessary licensee submittals may have included:
- 1) an expedited seismic evaluation process (ESEP) report, 2) seismic MSA; 3) spent-fuel pool (SFP) seismic integrity evaluation;
- 4) seismic high frequency confirmation; and/or 5) SPRA report. The staff's detailed assessment of the reevaluated seismic hazard information that has been provided in response to the 50.54(f) letter can be found in Section 4 of this Enclosure.
A key guidance document that was used by the staff to evaluate seismic MSAs was Appendix H, of Nuclear Energy Institute (NEI) 12-06, Revision 4, "Diverse and Flexible Coping Strategies (FLEX) Implementation Guide" (ADAMS Accession No. ML163548421).
The NRC's endorsement of NEI 12-06, Revision 4, is described in Japan Lessons-Learned Division (JLD) Interim Staff Guidance (ISG) JLD-ISG-2012-01, Revision 2, "Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" (ADAMS Accession No. ML17005A182).1 Section 6 of JLD-ISG-2012-01, Revision 2, provides guidance regarding the treatment of reevaluated seismic hazard information in mitigation strategies developed in response to Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" (ADAMS Accession No. ML12054A735).
The draft final MBDBE rule, provided in SECY-16-0142, contained provisions that would have required mitigation strategies to address the reevaluated seismic hazard information on a generic basis. As reflected in the Affirmation Notice and SRM dated January 24, 2019, the Commission determined that addressing the reevaluated hazards in licensees' mitigation strategies on a generic basis was not needed for adequate protection of public health and safety but would instead be assessed on a plant-specific, case-by-case basis under the requirements of 1 O CFR § 50.109, "Backfitting," and § 52.98, "Finality of combined licenses; information requests." The January 24, 2019, SRM directs the staff to use the 50.54(1) process to ensure that the NRC and its licensees will take the needed actions, if any, to ensure there is no undue risk to public health and safety due to the effects of the reevaluated seismic hazards. The SRM further directs that the staff should continue these efforts, utilizing existing agency processes to detennine whether an operating power reactor license should be modified, suspended, or revoked in light of the reevaluated hazard. 3.0 Process As described in Section 4.0 of this Enclosure, the staff has reviewed the reevaluated seismic hazard information that has been provided to date and issued corresponding staff 1 Appendix H was first introduced in Revision 2 of NEI 12-06, endorsed by Revision 1 of the ISG.
assessments for many sites. The conclusions documented in those assessments remain valid based on the demonstrated inherent capacity of SSCs and portable equipment.
Furthermore, the staff has determined that only SPRA report reviews that have not yet received a staff assessment could potentially lead to the staff identifying a need for modifying, suspending or revoking a license in accordance with the Phase 2 decisionmaking process. In their submittals, some licensees stated that changes would be pursued to mitigate the impact that the reevaluated seismic hazard could have at their sites, and these changes were not identified as regulatory commitments.
Other licensees identified such changes as regulatory commitments as defined in Section 4.2 of NEI 99-04, "Guidelines for Managing NRC Commitment Changes," Revision 0, dated July 1999 (ADAMS Accession No. ML003680088).
Depending on the site-specific details, the staff appropriately credited changes that licensees have planned or implemented at the site such as:
- Physical modifications to the plant that have been planned or implemented that would address a reevaluated seismic hazard.
- Changes to procedures to ensure relay chatter due to a seismic event do not adversely impact a plant's capability to shut down, or its ability to ensure adequate core cooling, containment integrity or SFP cooling. In an effort to provide clarity regarding the status of each site's response to the 50.54(f) letter, the staff has binned all sites into four different categories.
The binning is based on existing and proposed plant capabilities, as reflected in the licensee submittals and staff assessments associated with the reevaluated seismic hazards. The NRC staff binned sites into one of the following four categories:
- Category 1: Corresponds to sites where no additional regulatory action is warranted.
This category includes sites that where the reevaluated seismic hazard is bounded by the current design basis, or sites where the licensee has demonstrated that existing seismic capacity and plant procedures will address the unbounded reevaluated hazard. This means that both licensees and staff are finished with the 50.54(f) letter seismic reevaluation assessments and backfit decisions for these sites. There are currently 47 sites in this category.
- Category 2: Corresponds to sites where additional insights are needed before a backfit determination is made. This category includes sites where the NRC does not have all the information needed to make a Phase 2 determination for such a site. There are currently no reevaluated seismic hazard sites in this category.
- Category 3: Corresponds to sites where an SPRA report is under review or is expected to be submitted.
Therefore, the staff's review is ongoing and will be conducted in accordance with the recent Commission direction and be documented in the corresponding SPRA report staff assessment.
There currently are nine sites in this category.
- Category 4: Corresponds to sites that have requested a deferral from completing seismic work related to the 50.54(f) letter based on impending plant closure. The staff concluded that each site's corresponding deferral letter adequately addressed the site's plan to address the seismic hazard up to the period of plant closure. The NRC staff issued assessments for each deferral.
In these assessments, the staff stated that if a deferred site remains in operation longer than previously communicated, the licensee would be expected to respond to the 50.54(f) letter by completing the deferred seismic reevaluation report(s).
There are currently three sites in this category.
Table 1 includes the binning of all nuclear power plant sites. The staff's binning is intended to confirm the completion of the 50.54(f) seismic activities for Category 1 sites and the proposed path forward for sites in Categories 3 and 4. Also, the binning process considers all reevaluated seismic hazard reports, the respective staff assessments, and the ongoing MBDBE rulemaking.
Category 4 (deferred) sites will follow the process described in the site's corresponding deferral letter, and either provide a submittal by the deferred date that the 50.54(f) activities are no longer necessary based on the conditions of the plant (e.g., fuel being permanently removed from the reactor vessel in accordance with 10 CFR 50.82(a)(1
)(ii), and SFP capabilities) or provide the remaining information should they decide to remain in operation past the planned shutdown date. At such a point, the staff would evaluate those sites based on the process described in this document.
4.0 Seismic Reevaluated Hazards The NRG staff has revisited previously completed reevaluated seismic hazard staff assessments, particularly those where licensee actions were identified to ensure that key safety functions (core cooling, containment, and SFP cooling) are maintained to determine the need for further regulatory actions. The seismic reevaluations in response to the 50.54(f) letter include interim actions associated with the ESEP, SFP integrity evaluations, HF confirmations, seismic MSAs, and SPRA reports. Except for the SFP integrity evaluations, these activities had the potential to propose actions to ensure that key safety functions are maintained.
For sites where no SPRA reports were expected, activities identified during the ESEPs, HF confirmations, and seismic MSAs have been revisited to support the previous Phase 2 determination.
For sites where SPRA reports will be, or have been, performed, the SPRA report will support the Phase 2 determination.
The staff has completed all seismic MSA staff reviews for plants not requiring an SPRA report. Additionally, the staff did complete seismic MSA staff reviews for three sites that submitted an SPRA report. However, as described in the seismic MSA section below, future seismic MSA submittals are not warranted, given the recent Commission decision on the MBDBE rule. Instead, appropriate backfit decisions can be made based on the information that licensees provide in their SPRA reports. If additional information relative to mitigation strategies capabilities associated with a seismic event are needed to support a staff backfit decision, the staff wilt pursue obtaining such information on an individual plant basis as part of its SPRA report reviews. Sites in Category 3 are those with SPRA reports currently under review or that are yet to be submitted.
4.1 Expedited Seismic Evaluation Process By letter dated April 12, 2013 (ADAMS Accession No. ML13102A142), the Electric Power Research Institute (EPRI) staff submitted EPRI Report 3002000704 "Seismic Evaluation Guidance:
Augmented Approach for the Resolution of Fukushima Near-Term Task Force {NTIF) Recommendation 2.1: Seismic" {ADAMS Accession No. ML13102A142). The Augmented Approach proposed that licensees would use the ESEP to address the interim actions as requested by Information Item (6) in the 50.54(f) letter. The ESEP is a simplified seismic capacity evaluation with a focused scope of certain key installed mitigating strategies equipment that is used for core cooling and containment functions to cope with scenarios that involve a loss of all alternating current (ac) power and loss of access to the ultimate heat sink to withstand the review level ground motion {RLGM), which is up to two times the safe shutdown earthquake (SSE). By letter dated May 7, 2013 (ADAMS Accession No. ML13106A331
), the NRG staff endorsed the ESEP guidance.
The staff's reviews assessed whether the intent of the guidance was implemented.
All sites to which the ESEP was applicable have received a corresponding staff assessment that concludes that licensees have demonstrated adequate implementation of the augmented approach.
Part of the staff's assessment included checklist item VII, "Modifications to Plant Equipment." This section of the staff's assessment addressed whether licensees identified actions to resolve modifications to achieve high confidence of low probability of failure {HCLPF) values that bound the RLGM. In their docketed submittals, some sites identified actions and/or plant modifications needed to achieve HCLPF values. These actions and/or plant modifications resulting from the ESEP have either been completed or will be addressed as part of the SPRA. The staff credited (or will credit as appropriate) these actions and modifications as part of its Phase 2 determination and the conclusions documented in this letter. 4.2 Seismic Spent Fuel Pool Evaluations By letter dated January 31, 2017 (ADAMS Accession No. ML17031A171
), NEI submitted the EPRI Report No. 3002009564 entitled, "Seismic Evaluation Guidance:
Spent Fuel Pool Integrity Evaluation" (SFP Evaluation Guidance Report) (ADAMS Accession No. ML16055A017).
The SFP Evaluation Guidance Report provides criteria for evaluating the seismic robustness of an SFP to the reevaluated ground motion response spectrum (GMRS) hazard levels. This report supplements the guidance in EPRI Report 1025287, "Seismic Evaluation Guidance:
Screening, Prioritization and Implementation Details (SPID)" (ADAMS Accession No. ML12333A170). The NRG endorsed the SFP Evaluation Guidance Report by letter dated February 28, 2017 (ADAMS Accession No. ML17034A408), as an acceptable method for licensees to use when responding to Item (9) in Enclosure 1 of the 50.54(f) letter. The staff's guidance was developed to support completion of SFP evaluations for sites with a reevaluated seismic hazard exceedance in the 1-10 Hertz (Hz) frequency range (i.e., the frequency range of structural significance).
The staff's evaluations of the 38 sites with an exceedance in this frequency range were grouped based on whether the reevaluated GMRS peak spectral accelerations were above or below 0.8 g. These 38 operating reactor sites have each received a staff SFP structural evaluation that concluded that licensees have demonstrated adequate seismic margin to preclude a potential drain-down of the SFP in the unlikely occurrence of a seismic event up to the magnitude of the reevaluated seismic hazard occurring at their respective sites. The staff has confirmed that conclusions reached in these assessments are not affected by the Commission's Affirmation Notice and SRM on the MBDBE rule. 4.3 Seismic High Frequency Confirmations By letter dated July 30, 2015 (ADAMS Accession No. ML15223A095), NEI submitted EPRI Report 3002004396, "High Frequency Program: Application Guidance for Functional Confirmation and Fragility Evaluation" (hereafter referred to as the HF guidance) (ADAMS Accession No.ML15223A095}.
The HF guidance proposes methods for applying HF seismic testing results to support plant-specific analyses of potential HF effects. Specific guidance is given for plants performing a limited-scope HF confirmation to address the information requested in Item (4) in Enclosure 1 of the 50.54(1) letter.
accordance with this enclosure.
Specifically, in their docketed submittals, two licensees identified actions (such as operator actions needed to address relay chatter) needed to implement the mitigation strategies under the reevaluated seismic hazard conditions.
The staff credited such actions in its Phase 2 determination such that additional information or actions are not warranted.
For sites following Path 5 of NEI 12-06, Revision 4, Appendix H, licensees submitted or are scheduled to submit SPRA reports that include evaluations of HF effects on the plant. The SPRA report review process will identify if additional regulatory actions are warranted in accordance with the NRC's backfit process. Most SPRAs model FLEX equipment:
however, neither SFPs nor SFP cooling are modeled in SPRAs. As described above, operating reactor sites have either screened out of the need for conducting a SFP structural evaluation or have received a staff SFP structural evaluation that concluded that licensees have demonstrated adequate seismic margin to preclude a potential drain-down of the SFP in the unlikely occurrence of a seismic event up to the magnitude of the reevaluated seismic hazard taking place at their respective sites. If the staff has clarification questions regarding the modeling of mitigation strategies capabilities in the context of the SPRA report review, the staff will pursue these questions on an individual plant basis as part of the SPRA report reviews. Table 1 provides the results of the staff's binning of reevaluated seismic hazard submittals that have been provided to the staff. 4.5 Seismic Probabilistic Risk Assessments The NRG staff will continue to review the SPRA reports to complete the Phase 2 process as described in the 50.54(f) letter and in the memorandum dated September 21, 2016, to determine if additional regulatory actions are warranted.
The NRG staff has confirmed that pending work on SPRA reports in response to the 50.54(f) letter is not affected by the Commission's Affirmation Notice and SRM on the MBDBE rule. The NRG staff has completed the review of some SPRA reports and concluded that no further regulatory action is warranted for those sites. Those sites have been binned in Category 1. Other sites whose SPRA reports are still under review or sites soon to submit their SPRA reports are binned in Category 3. A limited number of sites have deferred their SPRA report submittal to a date after their proposed shutdown and are binned in Category 4. Those sites are to follow the guidance provided in the NRC staff response to the deferral request. 5.0 Conclusion Based on the staff's assessment provided in this Enclosure, the staff has determined that the conclusions documented in each of the reevaluated seismic hazard staff assessments issued to date remain valid and additional regulatory actions are not warranted for those sites. Reviews will continue to be performed for SPRA reports that have been received by the staff and are currently under review. Additionally, the staff will continue to use the same process to review SPRA reports that are scheduled to be submitted through the end of 2019. A small number of sites have received SPRA report deferral approvals corresponding to planned plant closures.
Table 1 provides a status of the staff's review of the reevaluated seismic hazard information and the site binning as described in Section 3 of this Enclosure.
Table 1 -Status of 50.54(f) Letter (Seismic)
-Site Binning Site No additional Additional Ongoing Deferred regulatory action Insights Needed Review is warranted
/Category
- 1) /Category
- 2) (Category
- 3) (Category
- 4) Arkansas Nuclear X Beaver Valley X Braidwood X Browns Ferry X Brunswick X Byron X Callaway X Calvert Cliffs X Catawba X Clinton X Columbia X Comanche Peak X Cooper X Davis-Besse X DC Cook X Diablo Canyon X Dresden X Duane Arnold X Farley X Fermi X FitzPatrick X Ginna X Grand Gulf X Harris X Hatch X Hope Creek X Indian Point X LaSalle X Limerick X McGuire X Millstone X Monticello X Nine Mile Point X North Anna X Oconee X Palisades X Palo Verde X Peach Bottom X Perry X Pilgrim X Point Beach X Prairie Island X Quad Cities X River Bend X Robinson X Salem X Seabrook X Sequoyah X St. Lucie X South Texas X Summer X Surry X Susquehanna X TMI X Turkey Point X Vogtle X Waterford X Watts Bar X Wolf Creek X Total 47 0 9 3 LIST OF APPLICABLE POWER REACTOR LICENSEES Arkansas Nuclear One Units 1 and 2 Entergy Operations, Inc. Docket Nos. 50-313 and 50-368 License Nos. OPR-51 and NPF-6 ANO Site Vice President Arkansas Nuclear One Entergy Operations, Inc. N-TSB-58 1448 S.R. 333 Russellville, AR 72802 Beaver Valley Power Station, Units 1 and 2 FirstEnergy Nuclear Operating Company Docket Nos. 50-334 and 50-412 License Nos. DPR-66 and NPF-73 Mr. Richard D. Bologna Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SSB P.O. Box 4, Route 168 Shippingport, PA 15077 Braidwood Station Units 1 and 2 Exelon Generation Company, LLC Docket Nos. STN 50-456 and STN 50-457 License Nos. NPF-72 and NPF-77 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO) Exelon Nuclear Braidwood Station 4300 Winfield Road Warrenville, IL 60555 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Tennessee Valley Authority Docket Nos. 50-259, 50-260, and 50-296 License Nos. DPR-33, DPR-52, and DPR-68 Mr. Joseph W. Shea Vice President, Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority Browns Ferry Nuclear Plant 1101 Market Street, LP 4A Chattanooga, TN 37 402-2801 Brunswick Steam Electric Plant, Units 1 and 2 Duke Energy Progress, LLC Docket Nos. 50-325 and 50-324 Licensee Nos DPR-71 and DPR-62 Mr. William R. Gideon Site Vice President Brunswick Steam Electric Plant 8470 River Rd. SE (M/C BNP001) Southport, NC 28461 Byron Station, Units 1 and 2 Exelon Generation Company, LLC Docket Nos. STN 50-454 and STN 50-455 License Nos. NPF-37 and NPF-66 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO} Exelon Nuclear Byron Station 4300 Winfield Road Warrenville, IL 60555 Enclosure 2
Callaway Plant, Unit 1 Union Electric Company Docket No. 50-483 License No. NPF-30 Mr. Fadi Oiya Senior Vice President and Chief Nuclear Officer Ameren Missouri Callaway Energy Center 8315 County Road 459 Steedman, MO 65077 Calvert Cliffs Nuclear Power Plant Units 1 and 2 Calvert Cliffs Nuclear Power Plant. LLC Docket Nos. 50-317 and 50-318 License Nos. DPR-53 and DPR-69 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Catawba Nuclear Station Units 1 and 2 Duke Energy Carolinas, LLC Docket Nos. 50-413 and 50-414 License Nos. NPF-35 and NPF-52 Mr. Robert T. Simril Site Vice President Duke Energy Carolinas, LLC Catawba Nuclear Station 4800 Concord Road York, SC 29745 Clinton Power Station Unit 1 Exelon Generation Company, LLC Docket No. 50-461 License No. NPF-62 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO) Exelon Nuclear Clinton Power Station 4300 Winfield Road Warrenville, IL 60555 Columbia Generating Station Energy Northwest Docket No. 50-397 License No. NPF-21 Mr. Bradley J. Sawatzke Chief Executive Officer Energy Northwest Columbia Generating Station MD 1023 76 North Power Plant Loop PO Box 968 Richland, WA 99352 Comanche Peak Nuclear Power Plant Units 1 and 2 Vistra Operations Company, LLC Docket Nos. 50-445 and 50-446 License Nos. NPF-87 and NPF-89 Mr. Ken J. Peters Senior Vice President
& Chief Nuclear Officer Attention:
Regulatory Affairs Comanche Peak Nuclear Power Plant Vistra Operations Company, LLC 6322 N FM 56 P.O. Box 1002 Glen Rose, TX 76043 Cooper Nuclear Station Nebraska Public Power District Docket No. 50-298 License No. DPR-46 Mr. John Dent, Jr. Vice President-Nuclear and CNO Nebraska Public Power District Cooper Nuclear Station 72676 648A Avenue Brownville, NE 68321 Davis-Besse Nuclear Power Station, Unit 1 FirstEnergy Nuclear Operating Company Docket No. 50-346 License No. NPF-3 Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company c/o Davis-Besse NPS 5501 N. State Route 2 Oak Harbor, OH 43449-9760 Diablo Canyon Power Plant. Unit Nos. 1 and 2 Pacific Gas and Electric Company Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82 Mr. James M. Welsch Vice President, Nuclear Generation and Chief Nuclear Officer Pacific Gas and Electric Company P O Box 56, Mail Code 10416 Avila Beach, CA 93424 Donald C. Cook Nuclear Plant Units 1 and 2 Indiana Michigan Power Company Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 Mr. Joel P. Gebbie Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, Ml 49106 . 3 . Dresden Nuclear Power Station Units 2 and 3 Exelon Generation Company, LLC Docket Nos. 50-237 and 50-249 License Nos. DPR-19 and DPR-25 Mr. Bryan C Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO) Exelon Nuclear Dresden Nuclear Power Station 4300 Winfield Road Warrenville, IL 60555 Duane Arnold Energy Center NextEra Energy Duane Arnold, LLC Docket No. 50-331 License No. DPR-49 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division NextEra Energy Duane Arnold. LLC Mail Stop: NT3/JW 15430 Endeavor Drive Jupiter, FL 33478 Edwin I. Hatch Nuclear Plant Units 1 and 2 Southern Nuclear Operating Company. Inc. Docket Nos. 50-321 and 50-366 License Nos. DPR-57 and NPF-5 Ms Cheryl A Gayheart Regulatory Affairs Director Southern Nuclear Operating Company, Inc. 3535 Colonnade Parkway Birmingham, AL 35243 Fermi Unit 2 DTE Electric Company Docket No. 50-341 License No NPF-43 Mr. Keith J. Polson, Senior Vice President and Chief Nuclear Officer DTE Electric Company 6400 North Dixie Highway Newport, Ml 48166 Grand Gulf Nuclear Station, Unit 1 Entergy Operations, Inc. Docket No. 50-416 License No. NPF-29 Vice President, Operations Entergy Operations, Inc. Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 H. B. Robinson Steam Electric Plant, Unit No.2 Duke Energy Progress, LLC Docket No. 50-261 License No. DPR-23 Mr. Ernest J. Kapopoulos, Jr. Site Vice President H B Robinson Steam Electric Plant Duke Energy Progress, LLC 3581 West Entrance Road, RNPA01 Hartsville, SC 29550 Hope Creek Generating Station PSEG Nuclear, LLC Docket No. 50-354 License No. NPF-57 Mr. Peter P. Sena, Ill President and Chief Nuclear Officer PSEG Nuclear LLC -N09 P 0. Box 236 Hancocks Bridge, NJ 08038 Indian Point Nuclear Generating Unit Nos. 1 2 and 3 Entergy Nuclear Operations, Inc. Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64 Vice President, Operations Entergy Nuclear Operations.
Inc. Indian Point Energy Center 450 Broadway, GSB PO Box 249 Buchanan, NY 10511-0249 James A. FitzPatrick Nuclear Power Plant Exelon Generation Company, LLC Docket No. 50-333 License No. DPR-59 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Joseph M. Farley Nuclear Plant, Units 1 and 2 Southern Nuclear Operating Company. Inc. Docket Nos. 50-348 and 50-364 License Nos NPF-2 and NPF-8 Ms. Cheryl A. Gayheart Regulatory Affairs Director Southern Nuclear Operating Company, Inc. 3535 Colonnade Parkway Birmingham, AL 35243 LaSalle County Station, Units 1 and 2 Exelon Generation Company. LLC Docket Nos. 50-373 and 50-37 4 License Nos. NPF-11 and NPF-18 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO) Exelon Nuclear LaSalle County Station 4300 Winfield Road Warrenville, IL 60555 Limerick Generating Station, Units 1 and 2 Exelon Generation Company, LLC Docket Nos. 50-352 and 50-353 License Nos. NPF-39 and NPF-85 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 McGuire Nuclear Station Units 1 and 2 Duke Energy Carolinas, LLC Docket Nos. 50-369 and 50-370 License Nos. NPF-9 and NPF-17 Mr. Tom Ray Site-Vice President Duke Energy Carolinas, LLC McGuire Nuclear Statron 12700 Hagers Ferry Road Huntersville, NC 28078-8985 Millstone Power Station, Units 2 and 3 Dominion Nuclear Connecticut, Inc. Docket Nos. 50-336 and 50-423 License Nos. DPR-65 and NPF-49 Mr. Daniel G. Stoddard Senior Vice President
& Chief Nuclear Officer Dominion Nuclear Connecticut, Inc. Millstone Power Station Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060 Monticello Nuclear Generating Plant Northern States Power Company Docket No. 50-263 License No. DPR-22 Mr. Christopher R. Church Senior Vice President and Chief Nuclear Officer Northern States Power Company -Minnesota Monticello Nuclear Generating Plant 2807 West County Road 75 Monticello, MN 55362 Nine Mile Point Nuclear Station Units 1 and 2 Nine Mile Point Nuclear Station, LLC Exelon Generation Company, LLC Docket Nos. 50-220 and 50-41 O License Nos. DPR-63 and NPF-69 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 North Anna Power Station Units 1 and 2 Virginia Electric and Power Company Docket Nos. 50-338 and 50-339 License Nos. NPF-4 and NPF-7 Mr. Daniel G Stoddard Senior Vice President and Chief Nuclear Officer Virginia Electric and Power Company North Anna Power Station Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060 Oconee Nuclear Station, Units 1, 2 and 3 Duke Energy Carolinas, LLC Docket Nos. 50-269, 50-270, and 50-287 License Nos. DPR-38, DPR-47, and DPR-55 Mr. J. Ed Burchfield, Jr. Site Vice President Oconee Nuclear Station Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672-0752 Palisades Nuclear Plant Entergy Nuclear Operations, Inc. Docket No. 50-255 License No. DPR-20 Vice President, Operations Entergy Nuclear Operations, Inc. Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043-9530 Palo Verde Nuclear Generating Station. Units 1 2 and 3 Arizona Public Service Company Docket Nos. STN 50-528, STN 50-529, and STN 50-530 License Nos. NPF-41, NPF-51, and NPF-74 Mr. Robert S. Bement Executive Vice President Nuclear/ Chief Nuclear Officer Arizona Public Service Company Palo Verde Nuclear Generating Station P 0. Box 52034 MS 7602 Phoenix, AZ 85072-2034 Peach Bottom Atomic Power Station Units 2 and 3 Exelon Generation Company, LLC Docket Nos. 50-277 and 50-278 License Nos. DPR-44 and DPR-56 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Perry Nuclear Power Plant. Unit 1 FirstEnergy Nuclear Operating Company Docket No. 50-440 License No. NPF-58 Mr. David B. Hamilton Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P.O. Box 97 Mail Stop A-PY-290 Perry, OH 44081-0097 Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 Site Vice President Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Point Beach Nuclear Plant Units 1 and 2 NextEra Energy Point Beach, LLC Docket Nos. 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Mr_ Mano Nazar President and Chief Nuclear Officer Nuclear Division NextEra Energy Point Beach, LLC Mail Stop: NT3/JW 15430 Endeavor Drive Jupiter, FL 33478 Prairie Island Nuclear Generating Plant, Units 1 and 2 Northern States Power Company -Minnesota Docket Nos. 50-282 and 50-306 License Nos. DPR-42 and DPR-60 Mr. Scott Sharp Site Vice President Northern States Power Company -Minnesota Prairie Island Nuclear Generating Plant 1717 Wakonade Drive East Welch, MN 55089 Quad Cities Nuclear Power Station. Units 1 and 2 Exelon Generation Company, LLC Docket Nos. 50-254 and 50-265 License Nos. DPR-29 and DPR-30 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear Quad Cities Nuclear Power Station 4300 Winfield Road Warrenville, IL 60555 R. E. Ginna Nuclear Power Plant R. E. Ginna Nuclear Power Plant, LLC Exelon Generation Company, LLC Docket No. 50-244 License No. DPR-18 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 River Bend Station Unit 1 Entergy Operations, Inc. Docket No. 50-458 License No. NPF-47 Vice President, Operations Entergy Operations.
Inc. River Bend Station 5485 U.S Highway 61 St. Francisville, LA 70775 Salem Nuclear Generating Station, Units 1 and 2 PSEG Nuclear, LLC Docket Nos. 50-272 and 50-311 License Nos. DPR-70 and DPR-75 Mr. Peter P. Sena, Ill President and Chief Nuclear Officer PSEG Nuclear LLC -N09 Salem Nuclear Generating Station PO Box 236 Hancocks Bridge. NJ 08038 Seabrook Station Unit 1 NextEra Energy Seabrook, LLC Docket No 50-443 License No NPF-86 Mr. Mano Nazar President and Chief Nuclear Officer, Nuclear Division NextEra Energy Seabrook, LLC Mail Stop: EX/JB 700 Universe Blvd. Juno Beach, FL 33408 Sequoyah Nuclear Plant, Units 1 and 2 Tennessee Valley Authority Docket Nos. 50-327 and 50-328 License Nos. DPR-77 and DPR-79 Mr. Joseph W. Shea Vice President, Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority Sequoyah Nuclear Plant 1101 Market Street, LP 4A Chattanooga, TN 37402-2801 Shearon Harris Nuclear Power Plant, Unit 1 Duke Energy Progress, LLC Docket No. 50-400 License No. NPF-63 Ms. Tanya Hamilton, Site Vice President Shearon Harris Nuclear Power Plant 5413 Shearon Harris Rd. MIC HNP01 New Hill, NC 27562-0165 South Texas Project, Units 1 and 2 STP Nuclear Operating Company Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80 Mr. G. T. Powell President and CEO STP Nuclear Operating Company South Texas Project PO Box 289 Wadsworth, TX 77 483 St. Lucie Plant Units 1 and 2 Florida Power and Light Company Docket Nos. 50-335 and 50-389 License Nos. DPR-67 and NPF-16 Mr. Mano Nazar President, Nuclear Division and Chief Nuclear Officer Florida Power & Light Company Mail Stop EX/JB 700 Universe Blvd. Juno Beach, FL 33408 Surry Power Station, Unit Nos. 1 and 2 Virginia Electric and Power Company Docket Nos. 50-280 and 50-281 License Nos. DPR-32 and DPR-37 Mr. Daniel G. Stoddard, Senior Vice President and Chief Nuclear Officer Dominion Nuclear Virginia Electric and Power Company Surry Power Station Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Susquehanna Steam Electric Station, Units 1 and 2 Susquehanna Nuclear, LLC Docket Nos. 50-387 and 50-388 License Nos. NPF-14 and NPF-22 Mr. Kevin Cimorelli Site Vice President Susquehanna Nuclear, LLC 769 Salem Boulevard NUCSB3 Berwick, PA 18603-0467 Three Mile Island Nuclear Station, Unit 1 Exelon Generation Company. LLC Docket No. 50-289 License No. DPR-50 Mr. Bryan C Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Turkey Point Nuclear Generating Units 3 and 4 Florida Power and Light Company Docket Nos. 50-250 and 50-251 License Nos. DPR-31 and DPR-41 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division Florida Power & Light Company Mail Stop EX/JB 700 Universe Blvd. Juno Beach, FL 33408 Virgil C. Summer Nuclear Station, Unit 1 South Carolina Electric & Gas Company Docket No. 50-395 License No. NPF-12 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Blvd., Floor: IN-2SW Glen Allen, VA 29060 Vogtle Electric Generating Plant, Units 1 and 2 Southern Nuclear Operating Company, Inc. Docket Nos. 50-424 and 50-425 License Nos. NPF-68 and NPF-81 Ms. Cheryl A. Gayheart Regulatory Affairs Director Southern Nuclear Operating Company, Inc. 3535 Colonnade Parkway Birmingham, AL 35243 Waterford Steam Electric Station, Unit 3 Entergy Operations, Inc. Docket No. 50-382 License No. NPF-38 Site Vice President Entergy Operations, Inc. Waterford Steam Electric Station 17265 River Road Killona, LA 70057-3093 Watts Bar Nuclear Plant, Units 1 and 2 Tennessee Valley Authority Docket No. 50-390 and 50-391 License No. NPF-90 and NPF-96 Mr. Joseph W. Shea Vice President, Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority Watts Bar Nuclear Plant 1101 Market Street, LP 4A Chattanooga, TN 37402-2801 Wolf Creek Generating Station Wolf Creek Nuclear Operating Corporation Docket No. 50-482 License No NPF-42 Mr. Adam C. Heflin President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation PO Box 411 Burlington, KS 66839 SUBJECT TREATMENT OF REEVALUATED SEISMIC HAZARD INFORMATION PROVIDED UNDER TITLE 10 OF THE CODE OF FEDERAL REGULATIONS 50 54(1) REGARDING RECOMMENDATION 2.1 OF THE NEAR-TERM TASK FORCE REVIEW OF INSIGHTS FROM THE FUKUSHIMA DAI-ICHI ACCIDENT DATE. July 3, 2019 DISTRIBUTION See next page ADAMS Accession No ML1914DA307 . concurred
- via email NRR-106 OFFICE NRR/DLP/PBMB/PM NRR/DLP/PBMB/LA*
NRR/DLP/PMBM/BC (A) NAME MValentin-Olmeda Slent* BTitus* DATE 5/24/2019 5/2812019 5131/2019 OFFICE OGc* NRR/DLPID NAME BHarris (NLO) LLund DATE 6112/2019 7/3/2019 OFFICIAL RECORD COPY DISTRIBUTION:
PUBLIC RidsNroOd RidsNrrDorl RidsNrrOorllpl1 RidsNrrDorllpl2-1 RidsNrrDorllpl2-2 RidsNrrDorllpl3 RidsNrrDorllpl4 RidsNrrDorlLSPB RidsNrrOd RidsNsirOd RidsOeMailCenter RidsOgcMailCenter UShoop, NRR JDana, NRR RPascarelli, NRR MMarkley, NRR MOrenak, NRR DWrona. NRR MValentin-Olmeda, NRR RidsNrrLAJ Burkhardt RidsNrrLABClayton
RidsN rrLAKGoldstein R1dsNrrLASRohrer RidsNrrLASLent RidsNrrLAP Blechman RidsN rrLALRonew1cz RidsNrrPMANO R1dsN rrPM BeaverValley R1dsN rrPM Braidwood RidsNrrPMBrunsw1ck RidsN rrPMBrownsFerry RidsNrrPMByron RidsNrrPMCallaway RidsNrrPMCalvertCliffs RidsNrrPMCatawba RidsNrrPMClinton RidsNrrPMColumbia RidsNrrPMComanchePeak RidsNrrPMCooper RidsNrrPMDCCook R1dsNrrPM DavisBesse R1dsNrrPMDiabloCanyon R1dsNrrPMDresden RidsNrrPMDuaneArnold RidsNrrPMFarley RidsNrrPMFerm12 RidsNrrPMF 1tzPatrick RidsNrrPMGrandGulf RidsNrrPMHatch RidsNrrPMHarris RidsNrrPM HopeCreek Rids N rrPM Indian Point RidsNrrPMLaSalle RidsNrrPMLimerick RidsNrrPMMcGu1re RidsNrrPMMillstone RidsNrrPMMont_1cello RidsNrrPM NineMilePoint RidsNrrPMNorthAnna RidsNrrPMOconee RidsNrrPMPalisades RidsNrrPaloVerde RidsN rrP M Peach Bottom RidsNrrPMPerry RidsNrrPMPilgrim RidsNrrPMP01ntBeach RidsNrrPMPra1rielsland RidsNrrPMOuadCit1es RidsNrrPMREGinna RidsNrrPM RiverBend RidsNrrPMRob1nson RidsNrrPMSalem RidsNrrPMSeabrook RidsNrrPMSequoyah RidsNrrPMSouth Texas RidsNrrPMStluc1e RidsNrrPMSummer RidsNrrPMSusquehanna RidsNrrPMSurry R1dsNrrPMThreeM1lelsland Rids N rr P MT u rkeyPoi nt R1dsNrrPMVogtle RidsNrrPMWaterford RidsNrrPMWattsBar RidsNrrPMWolfCreek R1dsOgcRp Resource RidsRgn1 MailCenter RidsRgn2MailCenter RidsRgn3MailCenter RidsRgn4MailCenter RidsEdoMailCenter Resource RidsNroOd RidsNrrOd RidsNsirOd